Mark Architectural Lighting S2LD Slot 2 Direct Pendant Light User manual

Type
User manual
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
1
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
Important Safety Instructions
READ AND FOLLOW ALL SAFETY INSTRUCTIONS!
SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION
·DO NOT INSTALL DAMAGED PRODUCT! This luminaire has been properly packed so that no parts should have been damaged during transit.
Inspect to confirm. Any part damaged or broken during or after assembly should be replaced.
·Recycle: For information on how to recycle LED electronic products, please visit www.epa.gov.
·These instructions do not purport to cover all details or variations in equipment nor to provide every possible contingency to meet in connection
with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered
sufficiently for the purchaser's or owner's purposes, this matter should be referred to Acuity Brands Lighting, Inc.
·It will occasionally be necessary to clean the outside of the refractor/lens. Frequency of cleaning will depend on ambient dirt level and minimum
light output which is acceptable to user. Refractor/lens should be washed in a solution of warm water and any mild, non-abrasive household
detergent, rinsed with clean water and wiped dry. Should optical assembly become dirty on the inside, wipe refractor/lens and clean in above
manner, replacing damaged gaskets as necessary.
·Maintenance of the luminaires should be performed by person(s) familiar with the luminaires' construction and operation and any hazards
involved. Regular fixture maintenance programs are recommended.
·To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards please
read all warnings and instructions included with and on the fixture box and all fixture labels.
·Before installing, servicing, or performing routine maintenance upon this equipment, follow these general precautions.
·Installation and service of luminaires should be performed by a qualified licensed electrician.
Allow lamp/fixture to cool before handling.
enclosure or light source.
Do not exceed maximum wattage marked on luminaire label.
Follow all manufacturer’s warnings,
and restrictions for: driver type, burning position, mounting
locations/methods, replacement and recycling.
WARNING
RISK OF BURN
Do not touch
recommendations
WARNING
RISK OF ELECTRIC SHOCK
Disconnect or turn off power before installation or servicing.
Verify that supply voltage is correct by comparing it with the
luminaire label information.
Make all electrical and grounded connections in accordance
National Electrical Code (NEC) and any applicable
All wiring connections should be capped with UL approved
connectors.
with the
local code requirements.
recognized wire
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
2
Important Safety Instructions
Wear gloves and safety glasses at all
luminaire from carton, installing, servicing or performing
maintenance.
Avoid direct eye exposure to the light source while it is on.
CAUTION
RISK OF INJURY
times when removing Keep combustible and other materials
lamp/lens.
Do not operate in close proximity to
materials or substances affected by heat or drying.
CAUTION
RISK OF FIRE
that can burn, away from
persons, combustible
üUnless individual product specifications deem otherwise: Do not exceed fixtures maximum ambient temperature.
üOnly use fixture in its intended location.
üNever connect components under load.
üDo not mount or support these fixtures in a manner that can cut the outer jacket or damage wire insulation.
üControls for dimming, auto-sensing, or remote control of a luminaire that are not factory-wired to the luminaire must be checked for compatibility
with the luminaire prior to installation. LED fixtures must be powered directly o ffa switched circuit.
üUnless individual product specifications deem otherwise: Do not restrict fixture ventilation. Allow for some volume of airspace around fixture.
Avoid covering LED fixtures with insulation, foam, or other material that will prevent convection or conduction cooling.
üAlways read the fixtures complete installation instructions prior to installation for any additional fixture specific warnings.
üLED products are Polarity Sensitive. Ensure proper Polarity before installation.
üSome components inside the fixture may not be serviceable. In the unlikely event your unit may require service, stop using the unit immediately
and contact an ABL representative for assistance.
üAlways ensure that the electrical distribution system is up to NEC (and any applicable local code) requirements.
üDo not touch individual electrical components as this can cause ESD, shorten lamp life, or alter performance.
üElectrostatic Discharge (ESD): ESD can damage LED fixtures. Personal grounding equipment must be worn during all installation or servicing
of the unit.
üVerify that power distribution system has proper grounding. Lack of proper earth ground can lead to fixture failure and may void warranty.
Choose either Part 15 OR Part 18 and move to Page 3 Installation Instructions under Delivery. Lithonia Outdoor will always use Part 15.
All luminaires that contain electronic devices that generate frequencies above 9kHz from any component within the luminaire comply with Part 15 of the FCC Rules. Operation is subject
to the following two conditions:
(1) This device may not cause harmful interference
(2) This device must accept any interference received, including interference that may cause undesired operation
CAUTION: RISK OF PRODUCT DAMAGE
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
3
Important Safety Instructions
This device complies with Part 18 of the FCC Rules but may cause interference with cordless and cell phones, radios, televisions, and other electronic
devices. To correct the problem, move the device away from the luminaire or plug into a different outlet. This product may cause interference to radio
equipment and should not be installed near maritime safety communications equipment or other critical navigation or communications equipment
operating between 0.45-30MHz.
Failure to follow any of these instructions could void product warranties. For a complete listing of product Terms and Conditions, please visit .www.acuitybrands.com
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products.
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
ABL LED General Warnings, Form No. 503.203
READ AND FOLLOW ALL SAFETY INSTRUCTIONS!
SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION
·Maintenance should be performed by qualified person(s) familiar with the products' construction and operation and any hazards involved. Regular
maintenance programs are recommended.
·DO NOT INSTALL DAMAGED PRODUCT! This product has been properly packed so that no parts should have been damaged during transit. Inspect to
confirm. Any part damaged or broken during or after assembly should be replaced.
·Before installing, servicing, or performing routine maintenance upon this equipment, follow these general precautions.
·Installation and service should be performed by a qualified licensed electrician.
·These instructions do not purport to cover all details or variations in equipment nor to provide every possible contingency to meet in connection with
installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the
purchaser's or owner's purposes, this matter should be referred to Acuity Brands Lighting, Inc.
·To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards please read all
warnings and instructions included with and on the fixture box and all fixture labels.
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
4
Important Safety Instructions
Always read the fixtures complete installation instructions prior to installation for any additional fixture specific warnings.
Failure to follow any of these instructions could void product warranties. For a complete listing of product Terms and Conditions, please
visit .www.acuitybrands.com
ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products.
Wear gloves and safety glasses at all
luminaire from carton, installing, servicing or performing
maintenance.
Avoid direct eye exposure to the light source while it is on.
CAUTION
RISK OF INJURY
times when removing Keep combustible and other materials
lamp/lens.
Do not operate in close proximity to
materials or substances affected by heat or drying.
CAUTION
RISK OF FIRE
that can burn, away from
persons, combustible
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
Allow lamp/fixture to cool before handling.
enclosure or light source.
Do not exceed maximum wattage marked on luminaire label.
Follow all manufacturer’s warnings,
and restrictions for: driver type, burning position, mounting
locations/methods, replacement and recycling.
WARNING
RISK OF BURN
Do not touch
recommendations
WARNING
RISK OF ELECTRIC SHOCK
Disconnect or turn off power before installation or servicing.
Verify that supply voltage is correct by comparing it with the
luminaire label information.
Make all electrical and grounded connections in accordance
National Electrical Code (NEC) and any applicable
All wiring connections should be capped with UL approved
connectors.
with the
local code requirements.
recognized wire
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
5
Important Safety Instructions
Failure to follow any of these instructions could void product warranties. For a complete listing of product Terms and Conditions, please
visit .www.acuitybrands.com
Please see product specific installation instructions for additional warnings or any applicable FCC or other regulatory statements.
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products.
ABL LED General Warnings, Form No. 503.203
üElectrostatic Discharge (ESD): ESD can damage product(s). Personal grounding equipment must be worn during all installation or servicing of
the unit.
üDo not touch individual electrical components as this can cause ESD and affect product Performance.
üDo not use product for anything other than its intended use.
üDo not tamper with contacts.
üIf installing wiring systems: Materials and component parts of a manufacturing wiring system as described in Article 604 of the National Electric
Code and Underwriters Laboratories Standard for Safety #183 MUST BE installed.
üDo not stretch or use cable sets that are to short or are of insufficient length.
üDo not change or alter internal wiring or installation circuitry.
üDo not modify the product.
üIf installing latching springs: ensure that the springs are fully engaged prior to moving to next connection.
CAUTION: RISK OF PRODUCT DAMAGE
Our Brands Indoor/Outdoor Controls Daylighting
Lithonia Lighting DARK TO LIGHT SunOptics
Carandini LC&D
Holophane ROAM
RELOC
Outdoor Lighting
American Electric Lighting
Antique Street Lamps
Hydrel
Tersen Sensor Switch
Light Concepts
Indoor Lighting
Gotham
Mark Architectural Lighting
Peerless
Renaissance Lighting
Winona Lighting Synergy
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
6
A. Overview - Fixture
HANGING BRACKET
GRIPLOCK
Adjustable cable grippers at
each support location AIRCRAFT
CABLE
RIGHT SECTION (S2LDR / S4LDR)
INTERMEDIATE SECTION (S2LDI / S4LDI)
LEFT SECTION (S2LDL / S4LDL)
FEED CORD
END CAP
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
NOTE: Illustrations are used for reference only and can
differ slightly from the actual lighting system installed.
However, key components addressed in this information are
represented as accurately as possible.
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
7
B. Overview - Mounting
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
Feed Point Locations
BOR FIXTURE EOR FIXTURE
INT FIXTURE
LENGTH "A-1" O.A.L. "B" O.C.C" FROM END
4FT
5FT
6FT
7FT
8FT
4'-0 5/16"
5'-0 5/16"
6'-0 5/16"
7'-0 5/16"
8'-0 5/16"
4'-0"
5'-0"
6-0"
7'-0"
8'-0"
5/16"
5/16"
5/16"
5/16"
5/16"
"A-2" O.A.L.
4'-0"
5'-0"
6'-0"
7'-0"
8'-0"
RUN LAYOUT (MOUNTING)
Run Configurations
Individual Fixture Configurations
. "H "
INDIVIDUAL UNITS (MOUNTING)
LENGT A" O.A.L. "B" O.C C" FROM END
2FT
3FT
4FT
5FT
6FT
7FT
8FT
2'- 5/8"
3'- 5/8"
4'- 5/8"
5'- 5/8"
6'- 5/8"
7'- 5/8"
8'- 5/8"
2'-0"
3'-0"
4'-0"
5'-0"
6-0"
7'-0"
8'-0"
5/16"
5/16"
5/16"
5/16"
5/16"
5/16"
5/16"
Non-Power Feed Point / Aircraft Cable
Power Feed
Battery Power Feed
CAT5
Down Power Feed
B
C
D
C
C
B
B
C
Direct, Dimming* or Non-Dimming
Direct, nLight Controls (wired)
Direct, Battery (E10WLCP), Dimming* or Non-Dimming
D
D
Direct, w/ Downlights**, Dimming* or Non-Dimming
Direct, w/ Downlights**, nLight Controls (wired)***
* 2-Wire Dimming (ZT, DALI, and Lutron EcoSystem)
** Downlights are supplied with a dedicated feed-point and will be controlled separately.
*** Downlights with nLight wired controls will use a J-Box mounted control module outside of fixture.
Direct, Battery (E10WLCP), nLight Controls (wired)
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
8
C. Parts - Hanging Hardware
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
FEED KIT SUPPORT KIT
HARDWARE PLEASE OPEN FIRST”.
·Provided in a separate red box labeled “INSTALLATION
·All other parts for installation to be provided by others.
NOTE: Feed kit is the same for F1/F2 and parts are
provided for both types of ceiling install. See parts list on
this page for provided mounting hardware kit.
Grid Mount J-Box
*269R35
(provided with F1A option only)
Cross Bar
*2724MF
Grid Clip
*2724MG
Strain Relief
White: *2724LF
Black: *2724LJ
5” Round Feed/CAT5 Canopy
White: *2724MR (*2725VX)
Black: *2725U6 (*272AP9)
Silver: *2726W7 (*2725VN)
Mini Cable Gripper
*2724M9
5” Round Dual Feed Canopy
White: *2724MS (*2725VY)
Black: *2725U9 (*272CGN)
Silver: *2725W8 (*2725VS)
Coupler (2” Canopy)
*2724M2
5” Round Support Canopy
White: *2724MP (*2725VV)
Black: *250WSS (*2725W1)
Silver: *2725W5 (*2725VJ)
Coupler (5” Canopy)
*2724LX
Aircraft Cable
36”: *2724LN
72”: *2724LR
150”: *2724LU
2” Round Support Canopy
White: *2724MT (*2725W0)
Black: *250WSX (*2725W3)
Silver: *2725WA (*2729F9)
Feed Cord (White)
4FT: *2724KR
7FT: *2724KV
14FT: *2724KW
Feed Cord (Clear)
4FT: *2724L1
7FT: *2724L8
14FT: *2724LC
1
2
3
4
5
6
7
8
9
10
11
12
13
4
5
2
11
12
13
8
9
9
7
10
12
3
* For square canopies, use part # in the parenthesis.
912-00242-002
02/22, Rev B
6
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
9
D. Set Up Ceiling - Grid Ceilings (F1)
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
2Bolt Bracket (A)
Bracket
(B)
T-Bar
Canopy
Coupler
Cord
Feed
1 3
a. Install J-box (by others) into the ceiling. Ensure
the bottom edge is flush with the ceiling. Connect the
metal conduit from building power to the J-box.
d. Pass the feed cord through the hole in the canopy
and make wire connections inside J-box. Flush the
canopy with the crossbar and thread coupler onto
crossbar screw.
b. Mount the crossbar to the J-box using (2) #8
screws and fasten it securely to the J-box.
c. Insert strain relief to the feed cord.
NOTE: A separate hole is provided for a CAT5 cable
if NLIGHT option is selected.
Feed Locations:
b. Hook bracket (B) onto bracket (A) and adjust
brackets to proper location along the ceiling grid and
push the tab from (A) towards bracket (B) to secure
brackets together.
c. Secure the brackets to the building structure per
local building codes.
a. Insert bolt into the bottom of bracket (A) and hook
onto grid member.
Non-Feed Locations (On-Grid):
Hanger
Bracket (A)
Hanger
Bracket
(A) Tab
Hanger
Bracket
(B)
Non-Feed Locations (Off-Grid):
b. Slide hanger onto caddy bar and fit caddy bar into
upper slots on the grid members.
a. Insert bolt into the bottom of bracket (A) and hook
together with bracket (B). Secure with nut (DO NOT
TIGHTEN).
d. Secure the brackets to the building structure per
local building codes.
c. Adjust brackets to proper location and push the
tab from bracket (A) towards bracket (B) to secure
brackets together.
Strain
Relief
Cable Retainer
#8
Screws
Caddy Bar
(by others)
Bracket
Bracket
(A) Tab
(A)
Bracket
(B)
Feed
Cord
CAT5
Cable
Conduit
(by others)
J-Box (by others)
T-Bar
Cross-Bar
Canopy
Black
Green
White
Purple
Gray Pink
Hot
Neutral
Ground
Dimming
Dimming
or
912-00242-002
02/22, Rev B
Caddy Bar
Brackets
(by others)
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
10
E. Set Up Ceiling - Hardlid (F2)
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
Secure 1/4-20 threaded rod approximately 3/8” to 5/8” below the ceiling. Insert
canopy and securely fasten the coupler.
Non-Feed Locations:
Canopy
Ceiling
J-Box
(by others)
#8 Screws
Coupler
Ceiling
1/4-20
Threaded Rod
(by others)
1/4-20
Screw
Cross-Bar
Strain
Relief
Feed Cord
2
1
CAT5
Cable Feed
Cord
Black
Green
White
Purple
Gray Pink
Hot
Neutral
Ground
Dimming
Dimming
or
Feed Locations:
d. Pass feed cord through the bushing in the canopy and make wire connections
inside J-box. Flush canopy with the crossbar and thread coupler onto the
crossbar screw.
a. Install the 4O J-box (by others) into the ceiling. Ensure the bottom edge is
flush with ceiling. Connect the metal conduit from building power to the J-box.
b. Mount crossbar to J-box using (2) #8 screws and fasten it securely to J-box.
NOTE: A separate hole is provided for CAT5 cable if NLIGHT option is selected.
c. Install strain relief to the feed cord.
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
11
F. Prep Fixtures
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
912-00242-002
02/22, Rev B
FIXTURES MUST BE INSTALLED IN ORDER AS
SHOWN ON RECORD DRAWINGS.
Mark as
Field
Order #
Section #
Unique Run/Pattern #
2.000 2.001 2.001 2.002
LEFT INTERMEDIATE RIGHTINTERMEDIATE
·Each section is identified by and ID#.
·
·
Individual fixtures have whole number Y.
For replacement parts, provide ID# and order #.
·Labels are located on the carton, on the fixture, and on the lens.
·Section position starting with X.000 for the first fixture.
·Same fixture configuration can carry identical ID# and are
interchangeable.
1
F-08-32FT
ID: 2.001
A427-40250-0-LLA-1.001
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
12
2
Grip Lock
Hardware
1
Grip Lock
Hardware
G. Mount First Section
#8 Screw
Hanger Bracket
Grip
Lock
Aircraft
Cable
3
a. Mount the grip lock from the hanging hardware kit
onto the screw provided on the fixture.
First Section:
b. Adjust aircraft cable up or down, by pushing down
on upper lock cylinder. Once required length is
achieved, allow lock cylinder to spring back up. Make
sure the lock screw is tightened. Hide or trim the
excess cable length.
For an Individual Fixture:
Repeat the same procedure from step (1) on the
other end of fixture.
NOTE: For a run, refer to step 3. b. Slide the hanger bracket into open end of housing
and temporarily secure in place with supplied #8
screws.
a. Mount the grip lock onto the stud on the hanger
bracket.
For a Run:
c. Adjust aircraft cable up or down, by pushing down
on upper lock cylinder. Once required length is
achieved, allow lock cylinder to spring back up. Make
sure the lock screw is tightened. Hide or trim the
excess cable length.
Stud
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
13
H. Opening Fixtures
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
2
1
Safety Cable
Wire Harness Connections
Inner Tray
Safety Cable
Lower the inner tray gently until safety cables fully engage and part is supported.
Grasp inner tray by the lip and pull it slowly out of the housing.
912-00242-002
02/22, Rev B
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
14
#8 Screws
I. Join Sections
321
Install (4) aligner pins onto one end of the run. Half of
the aligner pin should be exposed to insert into the
next section.
a. Slide joining fixture over hanger bracket while
keeping pins aligned to the holes from opposite
fixture body.
NOTE: Pull wires into the next section before fully
mating fixture together.
c. Fully mate sections together and secure hanger
bracket with #8 screws provided. Do not fully tighten
until step (3) is complete.
b. Pull wires into the next section before fully mating
to the next fixture. a. Insert joining bracket through slots at ends of the
sections. refer to Detail “A”.
b. Push joining bracket towards support bracket and
align slot in joining bracket with cage nut.
c. Secure with #8 screw provided.
Joining
Bracket
#8 Screw
Aligner Pins
Wires
Hanger Bracket
Cage Nut
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Aligner
Pins
(*241RTV)
Pin Installed
Position
Detail A
Slots
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
Support Bracket
912-00242-002
02/22, Rev B
Joining Bracket
(S2L: *245L3N
S4L: *241TLM)
(NOTE: Joining hardware parts provided in a separate yellow bag.)
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
15
J. Electrical Connections
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
a. Pull the feed cable through grommet at the
beginning of the run.
d. If NLIGHT or DCT option is selected, remove
second cap for the CAT5 cable or second feed.
NOTE: Feed may come pre-installed if pre-installed
feed option was selected.
b. Using pliers, compress the metal strain relief on
the power feed cable.
c. If NLIGHT option is selected, remove cap next to
the power cord, feed CAT5 cable through it, and
connect to the RJ45 port.
Feed
Cable
Metal Strain Relief
Pliers
All power connections should be installed according to local/national codes by a Certified Electrician.
Cap
Make wiring connections.
NOTE: Emergency feed uses the exact same feed
kit and cord.
Pull wires through to the next section and make
connections at the section closest to end of run.
1 2 3
If DALI, Color is Orange
If ECODx, Color is Purple/White
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
Black Hot
White Neutral
Green Ground
Purple Dimming
Gray Pink Dimming
Purple Dimming
WhitePurple Dimming
Orange Dimming
Dimming
Cap Purple Not Used
Not Used
Fixture Wire ColorOption
All
ZT
ECOD/ECOD5
DALI
NLIGHT, NLTAIR2
NODIM, ECOD2
Cap Gray
Cap Pink
or
or
Cap Gray
Cap Pink
or
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
16
K. Close Fixtures
1
Retaining
Clips
Inner Tray
Retaining
Clips
b. Gently push tray with lens inserted into the outer
housing until engaged with the retaining clips.
NOTE: Use two people when working with fixtures
greater than 4 feet. Be sure wires and safety cables
are clear of pinch points.
a. Once all electrical connections are made, reinstall
inner tray.
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
2
17
L. Supplemental
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
SLOT 2/4 Installation Instructions - Direct Pendant S2LD/S4LD
1
White
Wallwash/Wall Graze (WW/WG) Direction:
Install the light so the clear side is closest to the wall
to light.
Clear
a. If battery pack option is selected (E10WLCP),
then an un-switched normal hot is required for power
and sensing.
Battery Pack/Test Switch (E10WLCP):
b. Standard battery drop is on the right side of the
section with the battery. See above diagram for
location of test button.
Test Button
Feed Cable
Direction of Light
Direction of Wall
912-00242-002
02/22, Rev B
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
18
L. Supplemental
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
912-00242-002
02/22, Rev B
a. Suggested to mount in an accessible location for maintenance. To be installed in ceiling or to structure
according to local and NEC code.
b. 6 foot flexible conduit is attached. The remote BGTD should be mounted within 6 feet of the J-box above
the fixture.
Remote BGTD Mounting Option:
3
Accessible Ceiling
2’
3-3/8” Black Black
White White
Green Green
Output to Fixture Wiring
Output to
to
to
to
Fixture
Red Emergency Hot
White Emergency Neutral
Green Ground
Input # 1 Description
White Normal Neutral
Blue Switched Line
Black
Orange
Green
(120v) Unswitched Line
(277v) Unswitched Line
Ground
Input # 2 Description
or or
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
19
M. Contractor’s Resources
SLOT 2/4
marklighting.com I 800-705-SERV (7378) I
T
We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
I © 2021
AcuityBrands Lighting, Inc. All Rights Reserved.
Installation Instructions - Direct Pendant S2LD/S4LD
912-00242-002
02/22, Rev B
Check out helpful programs, tools, installation videos and more.
Contractors Resources
p.19
Supplemental
p.17
Close Fixtures
p.16
Join Sections
p.14
Electrical Connections
p.15
Open Fixtures
p.13
Prep Fixtures
p.11
Set Up Ceiling
p.9
Parts
p.8
Overview
p.6
Safety
p.1
Mount First Fixture
p.12
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19

Mark Architectural Lighting S2LD Slot 2 Direct Pendant Light User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI