SHEET
NAME
REV.
DATE APPROVED BY
DRAWN BY
1 / 1
A
A4
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
A.L. 08/03/2023
FILTERWALL INSTALLATION
EMAIL ADDRESS 3RD ANGLE
PROJECTION
SCALE
NTSS.M.
Note: All dimensions are in millimeters
Disclaimer:
Example installation shown. Ensure Australian building standard are met during installation.
454
Brick Stud
Packing Shims
(not supplied)
4 x Med duty brick ties
pop riveted to housing
Stud spacing (Centers)
SECTION A-A
ELEVATION
WALL CUTOUT ELEVATION
SECTION B-B
When mounted to housing
brick ties has a 4 degree angle
Housing
Brick tie
PEX or Copper Tubing
(not supplied)
B
DETAIL B
Brick
Wall opening
Rivet
BRICK TIE MOUNTING TO HOUSING (TOP VIEW)
A
TOP VIEW
DETAIL A
Brick tie
Brick
Mortar
600
605
784
764
Noggin 2x
68
110mm Brick
90mm Stud
DESCRIPTION
110MM BRICK WALL (Option 1)
Sealant around the filterwall
Wall openingSuggested height 240
AA
B
B