Danfoss SpeedUp Eco - Strongboard Carpet User guide

Type
User guide
Application sheet
SpeedUp Eco
Carpet
Strongboard carpet
1
2
3
4
5
1 Carpet ≥ 5 mm
2 Strongboard carpet 10 mm
3 SpeedUp Eco heat panel + FH composite pipe 30 mm
4 Support batten (30mm)
5 SpeedUp Eco perimeter insulation
6 If necessary moisture barrier
Floor nish ≥ 5 mm Carpet
Construction height ≥ 45 mm Height including oor nish
Weight ~ 20 kg / m² Weight including oor nish
Thermal resistance R 0,75 m²K / W The minimum thermal resistance requirement of EnEV is fullled.
Thermal transmission coecient U 1,09 W / m²K
Design load ≤ 2,0 kN / m²
Point load (≥ 20 cm²) ≤ 2,0 kN Sum point load ≤ design load; please notice special heavy ob-
jects (aquaria etc.)
Impact subsonic noise reduction 22 dB Test value according to DIN ISO 140-8; applies to concrete slabs
thicker than 12 cm (DIN 4109: m’ > 276 kg/m²)
Application area
Residential spaces, hallways and attic spaces in residential buildings and hotel rooms.
Corresponds to categories A1, A2 and A3 of DIN 1055-3.
Oce spaces, hallways in oce buildings, medical oces, stations and spaces with
human occupancy, and commercial spaces with oor areas up to 50 m² in residential or
oce buildings. Corresponds to categories B1, D1 and D2 of DIN 1055-3.
Requirements & special features
A level, smooth and structurally sound surface is necessary for full surface contact with
the heating elements (elevated requirements according to DIN 18202 Table 3, row 4).
Strongboard Carpet and synthetics must be primed after it is layed. If necessary provide
construction with additional sealing against moisture from below (vapour barrier/seal).
Observe all installation instructions and manufacturer’s instructions.
Additional insulation
This construction applies to residential partition slabs between rooms at the same tem-
perature. No additional insulation is necessary. See “Overview of maximum additional
insulation” with regard to allowable equalisation insulation.
Construction
According to EnEV, EN 1264, DIN 1055, 4108 and 18202
Construction number 70
Technical Data Floors/ceilings between rooms at the same temperature
6
© Danfoss 11/2008
VA.CS.I1.02
Danfoss HES
  • Page 1 1

Danfoss SpeedUp Eco - Strongboard Carpet User guide

Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI