Zippity Outdoor Products ZP19027 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Zippity Outdoor Products ZP19027 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Check Box for These Contents
In the event of missing or defective parts please call our customer service department at
1 877 234 6196
(Mon. to Fri. 8:00 AM to 4:00 PM EST).
1.
Post Cap
(5)
2. Mailbox Post
(
1) - 3” x 3” x 54”
3. Post Arm (1) - 4” x 4” x 23”
4. Board Wall - Rear
(2) 7/8“ x 11” x 6 1/2“
5. Board Wall - Sides (2) 7/8“ x 11” x 14“
6. Board Wall - Front (1) 7/8“ x 11” x 14“
7. Planter Box Post (4) 3“ x 3” x 12 1/4“
8. Planter Box Brace (1) 7/8“ x 1 1/2” x 14 3/4“
9. Anchor Pipe (1) 36 5/8” Long
10. 5/8” Tek Screw (2)
11. 3” Self-Augering Stainless Steel Screw (4)
12.
1/4” Hardened Steel Drill Bit
(1)
Tools You Will Need
• Cordless Drill
• Level
• Sledge Hammer
General Information
Read Instructions through carefully before beginning assembly.
When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
We recommend an area approx 5’x 8’ for unobstructed assembling.
You should not need to use excessive force when assembling components.
Majestic Mailbox Kit with Planter Box
Please read through before starting assembly.
ASSEMBLY INSTRUCTIONS
1
10
Not to Scale
Ver 1.1/110617
8
2
1
3
7
Ground
*
* Mailbox and mounting hardware for
the mailbox not included
DO-IT-YOURSELF
FRIENDLY PRODUCTS
Zippity
9
11
18 in
18 in
12 1/4 in
12 7/8 in
42 in
54 5/8 in
19 in
2 1/4 in
11 in
18 in
18 5/8 in
12
4
5
6
1
2
3
Assemble Mailbox Planter Box
Slide the planter box brace down the mailbox post as shown.
Note the location of the notch on the brace.
Guide the front board wall into place and lock into the notch
in the routed hole as shown.
Note that the front board wall has a routered hole on the
inside wall as shown.
Slide two planter box posts down over on each end of the
front board wall.
2
STEP ONE
Majestic Mailbox Kit with Planter Box Instructions
1
2
3
DO-IT-YOURSELF
FRIENDLY PRODUCTS
Zippity
Notch facing down
Groove on post fits inside
notch on board
Front board wall has a routered
hole on the inside wall.
4
Slide the two side boards down into place as shown.
slide the last two posts into place over the boards as shown.
Slide the rear boards down into place as illustrated.
3
DO-IT-YOURSELF
FRIENDLY PRODUCTS
Zippity
STEP ONE (CONT’D)
Majestic Mailbox Kit with Planter Box Instructions
6
4
5
6
5
1
2
Hammer
5lb Sledgehammer
BETTER
10lb Sledgehammer
BEST
STEP TWO
1
2
Install Pipe
Locate where you would like the mailbox post to go and
using a sledge hammer, drive the pipe into the ground
approximately 18” (18 5/8“ above ground).
Please check level in both directions at about 6” intervals as
you pound the pipe into the ground. Usually, after the pipe is
about 12” into the ground, the trajectory of the pipe is
established and you cannot pull the pipe back into level.
With a helper, carefully lift the planter box assembly up and
over the pipe and place the mailbox post over the anchor pipe.
4
Majestic Mailbox Kit with Planter Box Instructions
DO-IT-YOURSELF
FRIENDLY PRODUCTS
Zippity
18 5/8”
2 Person Lift
Use block of wood
to Protect top of Pipe
from Mushrooming !
5
STEP THREE
DO-IT-YOURSELF
FRIENDLY PRODUCTS
Zippity
Majestic Mailbox Kit with Planter Box Instructions
1
2
With the drill bit provided, pre-drill two holes through the vinyl
post and metal anchor pipe as shown. The holes should be
approximately 4” and 16” above ground and centered on the
groove of the mailbox post.
Fasten two tek screws with hex driver until they lock the
mailbox post to the metal anchor as shown.
Slide the mailbox arm down over the mailbox post as shown.
The top of the mailbox arm should be ±42” above ground.
1
2
3
3
42”
5
6
10616 Bailey Road, Unit H, Cornelius NC 28031
Toll Free Phone: 1 877 234 6196 Fax: 704 631 4685
www.zippity-outdoor.com
STEP THREE
4
Fasten 4, 3” screws through the pre-drilled holes on the mailbox
arm through to the mailbox post as shown.
Pressure fit the post caps into place as shown.
You can secure caps on more permanently using PVC glue if
necessary.
DO-IT-YOURSELF
FRIENDLY PRODUCTS
Zippity
Congratulations, you are finished!
Please follow mailbox manufacturers instructions for installation
of mailbox (not included) and mailbox mounting plate to the mailbox arm.
4
5
/