1-3SDC755A
1 • Introduction
Postal Requirements
The meter on your mailing system is licensed by your Postal Authority
and you must follow some basic requirements.
• Mail must have the correct date and postage amount in the
meter stamp.
• Always ensure that your meter stamp prints are clear and
complete. Poor prints may result in your Postal Authority being
unable to offer the service you have requested and if the prints
are illegible the items may be rejected by your Postal Authority.
If in doubt regarding the quality of your meter prints, refer to
Section 7, Printer Maintenance.
• If you move to another address, you must update the Postal
Authority records. Call your local machine supplier for advice.
• Each time you add postage to the machine, the Data Centre
automatically performs a postal inspection. If the interval
between inspections has been too long, your machine's display
prompts "Inspection Due". Perform an inspection as instructed in
Section 5, Adding Postage to satisfy the inspection requirement
by either adding postage or checking your balance. Eventually, if
an inspection is not carried out, the display prompts "Inspection
Required". You won't be able to use your mailing system until
you add postage or connect to the Data Centre.
Your mailing system takes full advantage of IntelliLink™, your digital
gateway to an entire suite of services and information that can move
your mail more efficiently and enhance your business performance.
IntelliLink™ technology gives you the ability to:
Add Postage Funds conveniently
You can add funds to your machine electronically via the Postage by
Phone system
®
.
Download Postal Rate Updates
The latest postal rates are downloaded precisely when you need
them.
Add Features On Demand
You can easily download envelope ads, postal inscriptions (if
used), and optional product enhancements such as departmental
accounting.
Keep Your System Current
Software download capability means you'll always have the latest
version of your machine's operating system.