Knight Team Table 4 Legs Assembly Instructions

Type
Assembly Instructions

This manual is also suitable for

knightgroup.co.nz
Assembly Instructions
Team Table
Tools Required: Powered Screwdriver, Rubber Mallet, 4mm and 6mm Allen Key.
Page 2
Assembly Instructions
knightgroup.co.nz
Recommended
2-person Step
WARNING: FAILURE TO COMPLY WITH
OR OBSERVE ALL ASSEMBLY, SAFETY AND
OPERATION INSTRUCTIONS AND WARNINGS
REGARDING THE USE OF THIS PRODUCT MAY
RESULT IN SERIOUS BODILY INJURY.
IMPORTANT NOTES!
Prior to installment, use or maintenance of the desk
frame, any installer and any user of the desk must study
this assembly and operation manual carefully, so as to
gain a complete understanding of its content.
WARNING
!
To prevent possible scratches or damage,
assemble the table upside down on a
soft surface such as a blanket, carpet or
packaging.
Team Table
4 Leg Frame
1800 x 800mm
2400 x 1200mm
See Page 3
6 Leg Frame
3600 x 1200mm
See Page 6
8 Leg Frame
4800 x 1200mm
Follow 6 Leg Frame
Instructions.
Page 3
Assembly Instructions
knightgroup.co.nz
Team Table 4 Legs - 1800x800 & 2400x1200mm
1
8
2
3
10
9
11
13
12
6
4
57
COMPONENTS
1 Leg x4
2 Adjustable Foot x4
3 Leg Cable Cover x4
4 Rail Lengths x2
5 Rail Widths x2
6 2 Way Connector x4
7 2 Way Connector Cap x4
8 Rail Spacer Bracket
(x2 for 1800x800mm)
(x6 for 2400x1200mm)
9 Slot Nut x2
10 Table Top x1
SCREWS
11 M8x20mm Dome Head x2
12 M8x12mm Dome Head x8
13 M8x20mm Cap Head x4
14 10Gx20mm Self Tapping x12
Page 4
Assembly Instructions
knightgroup.co.nz
Page 4
Assembly Instructions
Step 2
Loosely connect the M8x20mm dome head bolt and
slot nut through the rail spacer bracket. Slide spacer
bracket onto rail, align to centre and tighten. See
diagram below for number of spacer brackets and
placement based on rail measurement between legs.
Team Table 4 Legs - 1800x800 & 2400x1200mm
Step 3
Securely connect legs to rails lengths using the
M8x12mm dome head bolts. To secure rails to
connectors place the rail onto the connector and
firmly tap the end of the rail with a rubber mallet.
Step 2
Securely connect legs to rails widths using the
M8x12mm dome head bolts. To secure rails to
connectors place the rail onto the connector and
firmly tap the end of the rail with a rubber mallet.
Step 1
Slide the 2 way connectors over each leg, and securely
lock into place using M8x20mm cap head bolts.
Rail < 500mm = 0 Brackets
Rail > 500mm = 1 Brackets
Rail > 1600mm = 2 Brackets
Page 5
Assembly Instructions
knightgroup.co.nz
Page 5
Assembly Instructions
Completed
Conceal any power box cables using the clip leg
cable covers.
Ensure the worksurface is centered over the frame.
Pre-drill holes in the worksurface. Fully tighten all
10Gx20mm self tapping screws through each leg and
rail spacer bracket into the worksurface.
Step 5 Step 6
Team Table 4 Legs - 1800x800 & 2400x1200mm
Please Note: Table top may have pre-drilled holes on the underside,
these holes may not align to your specific frame. If this is the case,
the frame will need to be aligned to the top and new holes drilled
separately and screws provided used.
Page 6
Assembly Instructions
knightgroup.co.nz
Team Table 6 Legs - 3600 x 1200mm
1
10
2
3
12
11
13
15
14
6
4
8
5
97
COMPONENTS
1 Leg x6
2 Adjustable Foot x6
3 Leg Cable Cover x6
4 Rail Lengths x4
5 Rail Widths x3
6 2 Way Connector x4
7 2 Way Connector Cap x4
8 3 Way Connector x2
9 3 Way Connector Cap x2
10 Rail Spacer Bracket x7
11 Slot Nut x7
12 Table Top x1
SCREWS
13 M8x20mm Dome Head x7
14 M8x12mm Dome Head x14
15 M8x20mm Cap Head x6
16 10Gx20mm Self Tapping x26
Page 7
Assembly Instructions
knightgroup.co.nz
Step 4
Step 1 Step 2
Step 3
Securely connect legs to rails lengths using the
M8x12mm dome head bolts. To secure rails to
connectors place the rail onto the connector and
firmly tap the end of the rail with a rubber mallet.
Securely connect legs to rails widths using the
M8x20mm dome head bolts. To secure rails to
connectors place the rail onto the connector and
firmly tap the end of the rail with a rubber mallet.
Slide the 2 way and 3 way connectors over each leg,
and securely lock into place using M8x20mm cap
head bolts.
Loosely connect the M8x20mm dome head bolt and
slot nut through the rail spacer bracket. Slide spacer
bracket onto rail, align to centre and tighten. See
diagram below for number of spacer brackets and
placement based on rail measurement between legs.
Team Table 6 Legs - 3600 x 1200mm
Rail < 500mm = 0 Brackets
Rail > 500mm = 1 Brackets
Rail > 1600mm = 2 Brackets
Page 8
Assembly Instructions
knightgroup.co.nz
Completed
Conceal any power box cables using the clip leg
cable covers.
Ensure the worksurface is centered over the frame.
Pre-drill holes in the worksurface. Fully tighten all
10Gx20mm self tapping screws through each leg and
rail spacer bracket into the worksurface.
Step 5 Step 6
Please Note: Table top may have pre-drilled holes on the underside,
these holes may not align to your specific frame. If this is the case,
the frame will need to be aligned to the top and new holes drilled
separately and screws provided used.
Team Table 6 Legs - 3600 x 1200mm
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

Knight Team Table 4 Legs Assembly Instructions

Type
Assembly Instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI