Toro Blower and Drive Kit, Z Master Professional 7500-D Series Riding Mower With 60in TURBO FORCE Side Discharge Mower, Blower and Drive Kit, Z Master Professional 7500-D Series Riding Mower With 72in TURBO FORCE Side Discharge Mower Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Toro Blower and Drive Kit, Z Master Professional 7500-D Series Riding Mower With 60in TURBO FORCE Side Discharge Mower Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FormNo.3435-403RevA
BlowerandDriveKit
ZMaster
®
Professional7500-DSeriesRidingMowerwith60inor
72inTURBOFORCE
®
SideDischargeMower
ModelNo.78583—SerialNo.400000000andUp
ModelNo.78585—SerialNo.400000000andUp
InstallationInstructions
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
1
Nopartsrequired
Preparethemachine.
2
Nopartsrequired
Removetheexistingbeltcover,belt,
andbracket.
3
Pulleyassembly1
Installthepulleyassemblyandbelt(for
machineswithacast-ironspindle).
Pulleyassembly1
Pulley-platemount1
4
Flangenut(3/8inch)
3
Installthepulleyassemblyandbelt(for
machineswithanaluminumspindle).
Belt-coverbracket1
Carriagebolt(1/4x3/4inch)
2
5
Locknut(1/4inch)
2
Installthenewbelt-coverbracket.
Blowerassembly1
Baggerbelt1
Blowerbeltcover1
Spring
1
6
Knob1
Installtheblower,baggerbelt,spring,
andbeltcover.
Note:Determinetheleftandrightsidesofthemachinefromthenormaloperatingposition.
©2019—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.T oro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3435-403*A
1
PreparingtheMachine
NoPartsRequired
Procedure
1.Parkthemachineonalevelsurface.
2.Movethemotion-controlleverstotheNEUTRAL-LOCKposition.
3.Engagetheparkingbrake.
4.Shutofftheengineandremovethekey.
g037289
Figure1
2
RemovingtheExistingBelt
Cover,Belt,andBracket
NoPartsRequired
Procedure
1.Lowerthemowerdecktothelowestheight-of-cut
position.
2.Removetherightbeltcover(Figure2).
g027729
Figure2
3.Removetheexistingrightbeltcoverbracket
(Figure3).
g254130
Figure3
1.Rightbeltcoverbracket3.Flangenut
2.Washer
2
4.Storetherightbeltcover,bracket,andhardware
forlateruseifyouremovethebaggerblower
andpulley.
5.Removeandretainthedeckbelt.
3
InstallingthePulley
AssemblyandBelt
ForMachineswithaCast-Iron
Spindle
Partsneededforthisprocedure:
1Pulleyassembly
Procedure
1.Removetheangenutsfromtheexistingmower
deckpulley(Figure4).
g264067
Figure4
1.Flangenut2.Existingmowerdeck
pulley
2.Alignthenewpulleyassemblysothatthe
openingstoverthepulleystuds(Figure5).
g264065
Figure5
1.Newpulleyassembly3.Lockingslots
2.Existingmowerdeck
pulleyandpulleystuds
3.Turnthepulleytolockitintopositionandinstall
theangenuts(Figure6).
4.Afterthenewpulleyassemblyisinposition,
tightentheangenutstosecurenewpulley
assembly.
g264066
Figure6
5.Torquethenutsto28to34N∙m(21to25ft-lb).
6.Installthedeckbelt.
3
4
InstallingthePulley
AssemblyandBelt
ForMachineswithanAluminum
Spindle
Partsneededforthisprocedure:
1Pulleyassembly
1Pulley-platemount
3
Flangenut(3/8inch)
Procedure
1.Removethetopnut,washer,andsheavefrom
thespindle(Figure7).
Note:Notetheorientationofthesheavewhen
youremoveitfromthespindletoensurethat
youinstallitproperlylaterintheprocess.
g302393
Figure7
1.Topnut
3.Sheave
2.Washer
4.Spindle
2.Insertthepulley-platemountstudsintotheholes
inthesheave(Figure8).
g302390
Figure8
1.Sheave
2.Pulley-platemountstuds
3.Looselyinstallthe3nutstothestuds(Figure9).
Leaveaclearanceof5mm(3/16inch)between
thenutandsheave.
g302412
Figure9
1.Nut
2.Stud
4
4.Installthesheaveassemblytothespindleusing
thewasherandtopnut(Figure10).
g302413
Figure10
1.Topnut
3.Sheaveassembly
2.Washer
4.Spindle
5.Torquethetopnutto176to217N∙m(130to
160ft-lb).
Note:Ensurethatthesheavespinsfreely.
6.Alignthenewpulleyassemblysothatthe
openingstoverthenuts(Figure11).
g302411
Figure11
1.Pulleyassembly2.Nuts
7.Turnthepulleytolockitintoposition(Figure12).
Note:Ifthepulleydoesnotturn,loosenthe
nutsmoretoraisethenutsandallowthepulley
tolockintoposition.
g302414
Figure12
1.Pulleyassembly
8.Afterthenewpulleyassemblyisinposition,
tightenthenutstosecurenewpulleyassembly.
Torquethe3nutsto28to34N∙m(21to25ft-lb).
9.Installthedeckbelt.
5
5
InstallingtheNew
Belt-CoverBracket
Partsneededforthisprocedure:
1Belt-coverbracket
2
Carriagebolt(1/4x3/4inch)
2
Locknut(1/4inch)
Procedure
Installthebelt-coverbracketusingthe2carriagebolts
(1/4x3/4inch)and2locknuts(1/4inch)asshown
inFigure13.
g254198
Figure13
1.Belt-coverbracket
3.Locknut(1/4inch)
2.Carriagebolt(1/4x3/4
inch)
6
InstallingtheBlower
Assembly,BaggerBelt,
SpringandBlower-Belt
Cover
Partsneededforthisprocedure:
1Blowerassembly
1Baggerbelt
1Blowerbeltcover
1
Spring
1Knob
Procedure
RefertothebaggerOperator'sManualforthecorrect
proceduretoinstalltheblower,baggerbelt,spring,
andblowerbeltcover.
6
Notes:
/