In accordance with our policy of continuous product development and improvement,
this information is subject to change at any time without notice.
EI211501 Revision A (TFB/KAK) 22 May, 2000
Manitowoc Beverage Equipment
2100 Future Drive Sellersburg, IN 47172-1868
Tel: 812.246.7000, 800.367.4233 Fax: 812.246.9922
www.manitowocbeverage.com
Foodservice Group
Multiplex Beverage Equipment Installation Instructions for
Beermaster Air/CO2 Blender
P.N. 00211501
1. Locate and mount the Blender on the outside wall of the
walk-in cooler.
2. Once the Blender has been mounted, locate the CO
2 line
connected at Primary CO
2 Regulator. Route and connect
the opposite end of CO
2 line to the incoming CO2 gas con-
nection on left side of Blender (refer to diagram below).
3. Locate and mount the Air Filter Assembly in a convenient
location between the Blender and the Air Compressor.
4. Locate the air line connected at Air Compressor Regula-
tor. Route and connect the remaining end of air line to
the inlet side of air filter assembly.
5. Connect one end of the remaining section of air line to
the outlet side of air filter assembly. Route and connect
opposite end of air line to the incoming air connection on
left side of Blender (refer to diagram below).
6. Route and connect a line from the blender outlet connec-
tion at center of Blender to the secondary regulator gauge
and manifold assembly (refer to diagram below).
Caution: When connecting line to the blender outlet, discon-
nect fitting from the blender box before connecting line to
avoid breaking plastic fittings on blender box. Re-connect fit-
ting to the blender box
after attaching the line.
Primary Air
Regulator
Air Filter
Assembly
Air Compressor
Secondary
Regulators
CO2
Tank
Primary CO
2
Regulator
Blender Outlet
Incoming AirIncoming CO
2