Classic Exhibits VK-1114 Setup Instructions

  • Hello! I am an AI chatbot trained to assist you with the Classic Exhibits VK-1114 Setup Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
© 2016
www.classicexhibits.com
Order #XXXXX -
SETUP INSTRUCTIONS
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
VK-1114 - General Layout
Plan View10’
10’
© 2016
www.classicexhibits.com
Order #XXXXX -
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all setscrews
and locks during disassembly
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2016
www.classicexhibits.com
Order #XXXXX -
SEG Graphic Installation
1) Locate channels along the edges of extrusions
2) Insert graphic corners first into channels then center
point of graphic into channels. Allows for proportional
fit around the perimeter of the extrusion.
3) Working from center to corner, slide silicon edge
on graphic into channel.
4) After all edges of graphic have been inserted into
channels, step back and assess graphic fit, make
adjustments where needed.
LT Panel Assembly
1) With a vertical offset, place LT-Panels side-by-side;
slide vertically offset panel down to lock panels
together and in place.
2) Corner Connectors (90°, T-Connector, Straight Connector)
connect just as panels connect together. Repeat Step 1
for installing corner connectors to panels.
LT Panel Disassembly
1) To disassemble push panel with upper locks horizontally
to disengage top lock clip.
2) Slide panels or connectors vertically in opposing directions
to release latches and disconnect parts.
While pushed in,
pull panel up to
disassemble
Push Panel in to
disengage the lock.
Fold edges over.
Insert into
groove
of frame
General Information
© 2016
www.classicexhibits.com
Order #XXXXX -
Step 1 of 4
Backwall Assembly
4
1
1
15
2
2A 3
3A
6
6A 5A
4A
When assembled
Item
1
2/2A
3/3A
4/4A
5/5A
6/6A
Qty.
3
1/1
1/1
1/1
1/1
1/1
Description
95” Vertical Extrusion
95” Vertical Extrusion
47.5” Horizontal Extrusion
47.5” Horizontal Extrusion
8” Horizontal Extrusion
Steps:
1) Connect Baseplates [1] to ends of Verticals
[2, 3, 4A] as shown.
2) Connect Horizontals [4, 4A] to Vertical [2] and
insert Infill between [4, 4A].
3) Connect Vertical [2A] to [4, 4A].
4) Connect Horizontals [6, 6A] to Vertical [2A],
then insert Infill between [6, 6A].
5) Connect Vertical [3] to [6, 6A].
6) Connect Horizontals [5, 5A] to [3], then
insert Infill between [5, 5A].
7) Connect Vertical [3A] to [5, 5A].
© 2016
www.classicexhibits.com
Order #XXXXX -
Step 2 of 4
Backwall Counter Assembly
When assembled
Item
6
Qty.
1
Description
70” Vertical Extrusion
Steps:
1) Install Shelf supports using Velcro
on the inside where indicated.
2) Slide Shelf inside counter and set in
place on the shelf supports.
3) Place Countertop onto assembled base
and lock into place.
See Counter Top Attachment detail.
4) Lower vertical [6] down through the hole
in the counter and set in place.
5) Attach Monitor Mount to vertical [6] where indicated.
See Monitor Mount Attachment detail.
*
**
Align hole with pin Rotate pin. Spring
will push pin into hole.
Counter Top Attachment
12
*
Velcro
Shelf
Supports
Monitor Mount Attachment
*
1) Attach backing plate to monitor.
2) Attach bolts to vertical.
3) Hang connection plate from
attached bolts.
4) Connect backing plate to
connection platewith bolts,
washers, and a nut.
6
© 2016
www.classicexhibits.com
Order #XXXXX -
Step 3 of 4
TSP Frame Assembly
7
7A
8
8A
When assembled
Item
7/7A
8/8A
Qty.
1/1
1/1
Description
48” Horizontal Extrusion
48” Vertical Extrusion
Steps:
1) Connect Horizontals [7, 7A] to Verticals [8, 8A]
together at corners as shown.
2) Connect assembled frame to backwall as shown using bolts.
See TSP Frame Attachment detail.
TSP Frame Attachment
*
Insert Bracket into interior
groove of TSP46 frame.
Attach frame to horizontal
by bracket w/ bolt.
Bracket
TSP 46
*
© 2016
www.classicexhibits.com
Order #XXXXX -
Step 4 of 4
Counter Assembly
910
11 12
12A
11A
10A
Countertop
Standoff Caps
9A
When assembled
Item
9/9A
10/10A
11/11A
12/12A
Qty.
1/1
1/1
1/1
1/1
Description
27.166” Horizontal Extrusion
27.166” Horizontal Extrusion
31.334” Vertical Extrusion
31.334” Vertical Extrusion
Steps:
1) Attach verticals [11, 11A & 12, 12A], between
horizontals [9, 9A & 10, 10A] as shown.
2) Attach Countertop to assembled base
with Standoff Caps as shown.
*
Slide connector with stud into
groove of extrusion and
twist to secure in place. Attach
ceiling with cap as shown.
Ceiling
Cap
V20
Countertop Attachment
*
*
**
/