Danfoss 180F7024 User guide

Type
User guide
Service guide
Energy Recovery Device
iSave 21 Plus
Disassembling and assembling
hpp.danfoss.com
Service guide | Disassembling and assembling iSave 21 Plus
2
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
Table of Contents
This document covers the instructions for
disassembling and assembling the iSave 21 Plus.
Important: It is essential that the iSave is
serviced in conditions of absolute cleanliness.
For a better understanding of the iSave, please see
the exploded views in the sections 8, 9 and 10.
The weight of the iSave is 47 kg / 103 lb
and it must be lifted with suitable lifting
equipment.
The weight of the pressure exchanger alone is
28 kg / 62 lb.
To prevent cold welding, lubricate threads of
screws with grease screw them into the compo-
nent and tighten them by the hand. Use PTFE
lubrication type.
Tools needed for disassembling the iSave:
- iSave 21 Plus tool kit (180F4160)
- 2 screwdrivers
- Lock ring plier
1. General Introduction
Contents
1. General Introduction........................................................................2
2. Disassembling the iSave ................................................................3
3. Disassembling the pressure exchanger ..................................................4
4. Assembling the pressure exchanger .....................................................7
5. Disassembling the vane pump .........................................................12
6. Assembling the vane pump ............................................................14
7. Assembling the iSave...................................................................17
8. Exploded view vane pump.............................................................18
9. Exploded view pressure exchanger ...............................................19
10. Exploded view iSave ...................................................................20
Service guide | Disassembling and assembling iSave 21 Plus
3
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
1. Place the iSave on a clean table.
3. Remove the vane pump.
2. Unscrew the bolts on the frontange.
(See above - bolts marked in red)
2. Disassembling the
iSave
4. Use special tool to x the coupling in
place while loosing the coupling.
Service guide | Disassembling and assembling iSave 21 Plus
4
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
3. Disassembling the
pressure exchanger
1. Unscrew the bolts in the ange.
3. Gently push out the ange.
2. Screw in the two M8 bolts.
4. Wet the shaft and shaft seal with clean
ltered water. Gently lever the shaft
assembly free using 2 screwdrivers/allen
keys..
5. Unscrew the bolts in the ange. 6. Gently remove the ange.
Note: Loose parts on the inside of the ange.
Service guide | Disassembling and assembling iSave 21 Plus
5
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
7. If bearing in ange need to be changed
gently press the bearing out from the
back side with a tube or a drift.
Place the new bearing in the hole in the
ange.
8. Lubricate the new bearing with clean
ltered water. With use of a hand press
gently press the new bearing in place
until it is in line with the ange surface.
Do not use a hammer!
9. Gently remove the cylinder barrel.
10. Unscrew the bolts in the ange.
11. Gently remove the housing.
Note: Loose parts on the inside of the
ange.
12. Remove port plate and pin.
Pin
Service guide | Disassembling and assembling iSave 21 Plus
6
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
13. Remove the high-pressure bearing using
a lock ring plier.
14. Remove the high-pressure bearing.
15. Gently lift the valve plate assembly free
with the aid of the screwdrivers.
17. Replace the O-rings and the back-up rings
on the valve plate.
16. Gently remove both valve plates.
Service guide | Disassembling and assembling iSave 21 Plus
7
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
4. Assembling the
pressure exchanger
3. Lubricate all the O-rings and back up
rings with clean ltered water and gently
by help of the 3 compression tools in
every fourth hole mount both valve plate
on the cylinder barrel.
4. Adjust the distance between the cylinder
barrel and valve plate at the short
shaft end. Distance 4-6 mm.
2. Lubricate all the bores in the cylinder
barrel with clean ltered water.
1. Mount the new back-up rings on the
valve plate rst and then the new O-rings.
IMPORTANT:
It is essential that the iSave is serviced in
conditions of absolute cleanliness.
All Parts must be absolute clean before
mounting.
WARNING:
Do not use silicone when assembling the
iSave. Do not reuse dismantled O-rings: they
might be damaged. Always use new O-rings.
Lubrication
- To prevent seizing-up, lubricate threads on
screws.
- O-rings inside iSave may be lubricated only
with clean ltered water.
- O-rings for port ange, mounting ange may
be lubricated with a small amount of grease.
- It is important to lubricate ALL parts to be
assembled with clean ltered water (Especially
all PEEK parts).
Service guide | Disassembling and assembling iSave 21 Plus
8
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
5. Mount the high-pressure bearing
6. Lock the high-pressure bearing in place
with the lock ring.
7. Replace old O-ring with a new one
8. Position the housing over the guide pin
9. Mount all bolts in the ange and tighten
them all with 30Nm±3
10. Fit the guide pin in the ange.
Service guide | Disassembling and assembling iSave 21 Plus
9
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
11. Location hole in port plate.
There are two dierent port plates in the iSave. One of them can be mounted on both anges in
the pressure exchanger. Make sure that they are assembled on the right ange.
12. Position the port plate over the guide pin.
Note: Make sure that the guide pin is
located in the locating hole in the port
plate.
13. Gently guide the cylinder barrel into the
bearing in the ange.
14. Change the O-ring in the ange and
position the port plate over the guide
pin.
15. Check that the port plate ts the center
bearing and the guide pin.
Service guide | Disassembling and assembling iSave 21 Plus
10
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
17. Position the port ange over the guide
pin and shaft. Make sure the guide pin is in
lign wih the ange..
18. Wet the shaft seal with clean ltered
water.
Do not use silicone grease.
Fit the shaft seal with the carbon surface
upward.
19. Shaft seal NOT mounted correct.
The rubber seal face must turn into the ange.
17. Mount all bolts in the ange and tighten
them to a torque according to exploded
view.
20. Using the plastic assembly tool provided,
large diameter rst, press the seal home
against the shoulder, by hand.
Be careful not to damage the carbon seal face
on the shaft seal.
21. Shaft seal in right position:
Service guide | Disassembling and assembling iSave 21 Plus
11
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
22. Remove the old ceramic ring from the
ange. Position the new O-ring on the seal
ange.
23. Push the new ceramic ring into the ange
using plastic tool provided (small diameter).
Make sure the face with the rubber seal is
positioned against the shoulder in the
ange.
Before assembly wet the parts with clean
ltered water.
24. Position the seal ange and the bolts.
Tighten the 4 bolts with a torque according
to exploded view.
Service guide | Disassembling and assembling iSave 21 Plus
12
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
1. Install the special tool for locking the
shaft.
3. Remove all bolts in the int. ange.
2. Unscrew the bolt in the middle of the
coupling and remove the coupling.
4. Gently remove the ange, the side plate
may stick to the ange. - make sure that it
do not drop.
5. Remove side plate and pin
5. Disassembling the
vane pump
6. Side plate removed.
Service guide | Disassembling and assembling iSave 21 Plus
13
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
7. Gently remove the rotor.
Note: Loose parts inside the rotor.
8. Remove vanes.
9. Rotate the housing to access the
connection ange.
10. Remove the screws in connection
ange.
11. Remove connection ange and port
ange.
12. Remove side plate and remove pin in
side plate.
Service guide | Disassembling and assembling iSave 21 Plus
14
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
1. Place the connection ange with the
nozzle downward.
2. Place the side plate on the port plate.
Note the pin.
6. Assembling the
vane pump
3. Place the port ange on top of the
connection ange. Note the pin.
4. Side plate mounted correct.
6. Turn the anges and stator while
pushing the parts together.
5. Note the pin. Place the new stator rin
on the port ange.
Service guide | Disassembling and assembling iSave 21 Plus
15
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
7. Fasten screws with a torque according
to exploded view.
8. Place the 4 pins in the rotor.
9. Lubricate with water and gently place the
rotor in the bearing.
10 Position the 8 vanes in the rotor. The
pins may be moved by using a
screwdriver.
11. Lubricate and check that all vanes are
positioned correctly.
12. Replace the O-ring on the int. ange and
wet the ange properly with clean
ltered water.
Service guide | Disassembling and assembling iSave 21 Plus
16
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
15. Lift the shaft while carefully pushing the
int. ange incl. side plate on to the stator.
16. Rotate the assembly and install the six
screws. Tighten according to exploded
view.
18. Install O-rings on ange.
17. Install coupling. Lock the shaft with speciall
tool, tighten the screws to a torque
according to exploded view.
13. Position the side plate over the guide pin. 14. Fit the int. ange into both the bearing in
the ange and the location pin in the
stator.
Service guide | Disassembling and assembling iSave 21 Plus
17
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
3. Ensure O-rings are in place.
7. Assembling the
iSave
1. Place the exchanger vertical on the HP
connector, and install the coupling spider.
2. Fit the polymer coupling insert on the
steel coupling. Note correct position of
the hole in the insert. Install pin on
exchanger.
4. Orient the steel coupling and place the
vane pump on the pressure exchanger.
5. Install the remaining bolts and tighten
them according to a torque speciec on
the exploded view.
6. When assembled it should be possible to
rotate the shaft at a torque between 10 and
15 Nm.
Service guide | Disassembling and assembling iSave 21 Plus
18
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
8. Exploded view
vane pump
Service guide | Disassembling and assembling iSave 21 Plus
19
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 09.2019
9. Exploded view
pressure exchanger
Danfoss A/S
High Pressure Pump
Nordborgvej 81
DK-6430 Nordborg
Denmark
© Danfoss | DCS (im) | 2019.09
180R9400 | 521B1463 | DKCFN.PI.003.Y2.02 | 20
10. Exploded view iSave
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20

Danfoss 180F7024 User guide

Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI