TurboChef NGC-3069 Field Service Bulletin

  • Hello! I am an AI chatbot trained to assist you with the TurboChef NGC-3069 Field Service Bulletin. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FSB10062A
3/29/07
Page 1 of 2
Reference
New Power Supply Implementation Kit (NGC-3069)
Distribution
Field service personnel.
Application
All domestic and international NGC ovens requiring power supply replacement.
Kit Components
Power supply (101211)
Bracket, power supply (NGC-1391)
Screw, #8 x ½ SS, Phillips truss type 17 with serrations (101688) x2
Screw, M3 (GB818-9) x3
Washer, split lock, M3 (GB93-1) x3
Field service bulletin (FSB-10062)
Required Parts
Phillips screwdriver
Step 1—Ensure the oven is removed from power source.
Step 2—Remove the right side panel.
Step 3—Remove the top panel.
Step 4—Remove and discard the old power supply and hardware.
a. The old power supply is attached to the top of the electrical compartment frame via three screws and three
standoffs.
b. Remove and discard the power supply, screws, and standoffs.
FSB10062A
3/29/07
Page 2 of 2
Step 5
Attach the new power supply to the bracket.
a. Using the three M3 screws and split-lock washers provided, attach the power supply to the bracket as shown
in Figure 1.
Step 6—Install the new power supply.
a. Using the two truss-head screws provided, install the power supply to the top of the electrical compartment
frame as shown in Figure 1.
Step 7—Reinstall the top panel.
Step 8—Reinstall the right side panel.
Step 9—Plug in the oven and verify that the control board display turns on.
Figure 1: Power Supply Installation
Provided
truss-head screws
Provided M3
screws and washers
Bracket
Power Supply
- End of Procedure -
/