ROOTECH Accura 3300S User guide

Category
Measuring, testing & control
Type
User guide
ACCURA 3300S
High Accuracy Digital Power Meter
With full features of power measurements
Becomes a necessary solution to you,
Providing simultaneously display of voltage, current, power, and energy.
User Guide[Korean]
Rev 1.1
Page
2
Page 3
Notice
Danger
Indicates the presence of dangerous voltage which can cause severe injury or death
to persons if proper precautions are not followed.
Warning
Alerts
the user to the presence of hazards which can cause somewhat injury to
pe
rsons, damage to property or damage to the device itself, if proper precautions
are not followed.
Note
Indicates the users attention to installation, operating and maintenance instructions.
Electrical Symbols
Indicates alternative voltage or current.
Indicates direct voltage or current.
Installation Considerations
Installation and operation of Accura 3300S meter should be performed only by qualified,
competent personnel that have appropriate training and experience with high voltage and current
devices.
Danger
Failure to observe the following instructions may result in severe injury or death.
During normal operation of the Accura 3300S meter, hazardous voltages are present
on its terminal strips.
Standard safety precautions are followed while performing any installation or service
work[removing PT fuses, shorting CT secondaries, etc].
Do not access to terminal strips of the Accura 3300S meter after installation.
Page
4
Warning
Observe the following instructions, or permanent damage to the meter may occur.
Do not apply Accura 3300S to voltages and currents that exceed Input ratings of PT and
CT.
Limitation of Liability
Rootech Inc. reserves the right to make changes in the device specifications shown in this Users
Guide without notice. Rootech Inc. advises customers to obtain the latest specifications of device
before giving orders to confirm that the information being relied on by the customer is up to date.
In the absence of written agreement to the contrary, Rootech Inc. assumes no liability for Rootech
Inc. applications assistance, customers system design, or infringement of patents or copyrights of
third parties by or arsing from the use of devices described herein.
Except to the extent prohibited by applicable law, under no circumstances shall Rootech Inc. be
liable for consequential damages sustained in connection with said product and Rootech Inc.
neither assumes nor authorizes any representative or other person any obligation or liability other
than such as is expressly set forth herein.
2008 Rootech Inc.
The information contained in this document is believed to be accurate at the time of publication,
however, Rootech Inc. assumes no responsibility for any errors which may appear here and
reserves the right to make changes without notice.
Page 5
Standard Compliance
CE Approved
EN61326 and IEC61010
MEASURING EQUIPMENT
35DX
E258934
KSQ ISO 9001:2009/ ISO 9001:2008
QMS-1347
Page
6
Warranty Information
For products and software that are sold or licensed by Rootech Inc. during the period from the
date of receipt by you until the present, Rootech warrants only to the original purchaser
The purchased products other than software shall be substantially free from material defects in
material and workmanship by Rootech for two years from the date receipt by you.
The software itself is provided as is without any warranty of any kind.
Limitation of Warranty
These limited Warranties shall not apply to any product that has been subject to alteration,
accident, misuse, abuse, neglect or failure to exactly follow Power Measurement's instructions for
operation and maintenance.
In order for the original purchaser to make a claim under the warranties described above, the
original purchaser must promptly contact Rootech headquarter. After receiving such notice,
Rootech may either in Rootechs sole discretion, examine the product at the original purchasers
site or issue shipping instructions to the original purchaser to return the relevant product to
Rootech for examination at the original purchasers expense, transportation charges prepaid.
If after examining the product Rootech reasonably confirms that such examined product does not
meet the warranties, then the original purchasers sole remedy and Rootechs sole obligation or
liability shall be, at Rootechs option, to repair, replace or refund the price paid for that product.
Regardless of whether any remedy set forth herein fails of its essential purpose, except to the
extent the following limitation is prohibited by applicable law, Rootech shall not, in any event or
under any legal claim or theory, be liable to the original purchaser or any other person or entity
for special, indirect, incidental, punitive, liquidated, special or consequential damages whatsoever
with respect to any purchased product, including, without limitation, business interruption, loss of
use, profit or revenue, even if Rootech has been advised of the possibility of such damages. To the
extent that a limitation or exclusion of consequential damages are prohibited by applicable law,
then Rootechs liability shall be limited to twice the amount of the relevant purchased product.
Rootech shall not be liable for any claim- other than a claim solely for the breach of one of the
Page 7
above warranties that is made in accordance with the above described procedures- made by the
original purchaser, its employees, agents, or contractors for any loss, damage, or expense
incurred due to, caused by, or related to any purchased product
Any technical assistance provided by Rootech's personnel or representatives in system design shall
be deemed to be a proposal and not a recommendation. The responsibility for determining the
feasibility of such proposals rests with the original purchaser and should be tested by the original
purchaser.
It is the original purchaser’s responsibility to determine the suitability of any product and
associated documentation for its purposes. The original purchaser acknowledges that 100% "up"
time is not realizable because of possible hardware or software defects. The original purchaser
recognizes that such defects and failures may cause inaccuracies or malfunctions.
Only the terms expressed in these limited Warranties shall apply and no distributor, corporation or
other entity, individual or employee of Rootech or any other entity is authorized to amend, modify
or extend the Warranties in any way.
Page
8
Revision History
The following versions of the Accura 3300S Users Guide have been are released.
Revision #
Revision date
Revision 1.0 2008. 03. 05 Initial draft
Revision 1.1 2009. 11. 27 Voltage input range modified
Page 9
Contents
Chapter 1 Introduction ............................................................................................................. 12
Overview ............................................................................................................................... 12
Power Measurements ..................................................................................................... 12
Accuracy ........................................................................................................................ 12
Power Quality ................................................................................................................ 12
CE/UL Safety and Reliability ........................................................................................... 12
Communication[IrDA and RS485] .................................................................................. 12
Features ................................................................................................................................ 14
Measurement ................................................................................................................. 14
Power Quality ................................................................................................................ 14
IrDA Communication ..................................................................................................... 14
Communication .............................................................................................................. 14
Power Supply ................................................................................................................. 15
Applications .......................................................................................................................... 15
True RMS Measurements robust to harmonics ................................................................ 15
Power Quality Analysis .................................................................................................. 15
Compatibility with Analog Meters .................................................................................. 15
High Reliability Energy Management ............................................................................. 15
Parameters ............................................................................................................................ 16
Chapter 2 Mounting ............................................................................................................... 17
Environmental Conditions .............................................................................................. 17
Enclosure Considerations ............................................................................................... 17
Before You Begin ................................................................................................................... 18
Meter Overview ............................................................................................................. 18
Meter Dimensions .......................................................................................................... 19
Step 1: Mounting ................................................................................................................ 20
Sequence ....................................................................................................................... 20
Step 2: Voltage and Current Inputs ..................................................................................... 21
Voltage Input ................................................................................................................. 21
Current Input ................................................................................................................. 22
Wiring Diagram Using External PTs ................................................................................ 23
Direct Diagram Using No PTs ......................................................................................... 26
Step 3: Wire the RS485 Communication ................................................................................ 29
Page 10
Step 4: Wire the Power Supply and Ground Terminal ............................................................ 30
Power Supply ................................................................................................................. 30
Ground Terminal ............................................................................................................ 30
Step 5: Add a Cover/Power Up the Meter ........................................................................... 31
Add a Cover ................................................................................................................... 31
Power Up the Meter ....................................................................................................... 31
Chapter 3 Meter Operation/Setup .......................................................................................... 32
Display Mode ........................................................................................................................ 33
Setup Mode ........................................................................................................................... 39
Reset Mode............................................................................................................................ 41
System Mode ......................................................................................................................... 42
Reactive Calculation Method .......................................................................................... 44
APPENDIX A Standard Specification ........................................................................................ 46
APPENDIX B Standard Compliance ......................................................................................... 47
APPENDIX C Test Report ......................................................................................................... 48
Measuring Test ...................................................................................................................... 48
Reliability Test........................................................................................................................ 49
INDEX ..................................................................................................................................... 50
Page 11
Figures
Fig 1.1 Accura PDA Software .......................................................................................... 13
Fig 2.1 Front Side ........................................................................................................... 18
Fig 2.2 Rear Side ............................................................................................................ 18
Fig 2.3 Front View .......................................................................................................... 19
Fig 2.4 Rear View ........................................................................................................... 19
Fig 2.5 Side View ........................................................................................................... 19
Fig 2.6 ANSI 4” .............................................................................................................. 20
Fig 2.7 DIN96 ................................................................................................................ 20
Fig 2.8 Voltage and Current Connector .......................................................................... 21
Fig 2.9 Single Phase 2 Wires, Wiring Mode = 1P2U ....................................................... 23
Fig 2.10 Three Phase 3 Wire Open Delta Using 2CTs, Wiring Mode = 3P3O ................. 24
Fig 2.11 Three Phase 3 Wire Open Delta Using 3CTs, Wiring Mode = 3P3O ................. 24
Fig 2.12 Three Phase 4 Wires Using 3 PTs and 3 CTs, Wiring Mode = 3P4U .................. 25
Fig 2.13 Single Phase 2 Wire Direct , Wiring Mode = 1P2U ........................................... 26
Fig 2.14 Single Phase 3 Wire Direct Using 2 CTs, Wiring Mode = 1P3U ......................... 27
Fig 2.15 Three Phase 3 Wire Open Delta Direct, Wiring Mode = 3P3O ......................... 27
Fig 2.16 Three Phase 3 Wire Open Delta Direct Using 3 CTs, Wiring Mode = 3P3O ...... 28
Fig 2.17 Three Phase 4 Wire Direct Using 3 CTs, Wiring Mode = 3P4U ......................... 28
Fig 2.18 Communication Wiring .................................................................................... 29
Fig 2.19 Wiring of Power Supply and Ground Terminal ................................................. 30
Fig 2.20 Cover ............................................................................................................... 31
Fig 3.1 Measurement Group A, B ................................................................................... 33
Fig 3.2 Measurement Group C ....................................................................................... 33
Fig 3.3 Measurement Group D ....................................................................................... 33
Fig 3.4 x1000, x10 LED .................................................................................................. 34
Fig 3.5 P, Q[according to general calculation] ................................................................ 44
Page 12
Chapter 1 Introduction
Overview
Power Measurements
Accura 3300S is a high accuracy digital power meter, suited to power measurements. The device
is applied to a variety of applications, electrical facilities, intelligent building system, factory,
generator and etc, making measurements of voltage, current, power, frequency, power factor, and
demand.
Accuracy
The measuring accuracy is the most important criterion to evaluate the reliability of energy
management system. Actually low accuracy makes it hard for customers to precisely manage
energy, causing inequality of energy between incoming feeder and sum of load sides. Accura
3300S makes ±0.2% high accuracy measurements for voltage and current, and conforms to
IEC62053-22 class 0.5S for power and energy. This makes it possible to solve the problem with
energy inequality.
Power Quality
Accura 3300S provides the information of power qualities, such as voltage/current THD, harmonic
analysis, and k factor.
CE/UL Safety and Reliability
The structure- framework, circuit, fire - of Accura 3300S conforms to safety standard,
CE[IEC61010], UL[UL61010-2, 2nd edition]. Particularly the device provides pass-through busbar,
allowing CT leads to be terminated on the device. This eliminates any possible point of failure at
the device.
Communication[IrDA and RS485]
Accura 3300S provides two independent communication ports. One port provides RS485
communication which supports a variety of applications, such as energy management, IBS, and
SCADA. The Accura also has an optical IrDA port, allowing the device to be set up and
programmed using a PDA. Just point at the meter with IrDA-equipped PDA, so customers can
monitor measurements, harmonic graph, vector diagram, demand trend, and oscilloscope.
Page 13
Rootech provides Accura PDA software that allows users to simply point at the meter, configure it
and poll readings. See the Accura 3300S Communication Users Guide for details.
Fig 1.1 Accura PDA Software
Page 14
Features
Measurement
64 Sampling/Cycle True RMS
IEC 62053-22 Class 0.5S
50, 60Hz
Energy stored periodically to non-volatile memory.
4 Quadrant Energy
kWh/kVARh received1, kWh/kVARh delivered1
kWh/kVARh net[kWh/kVARh received - kWh/kVARh delivered]
kWh/kVARh total[kWh/kVARh received + kWh/kVARh delivered]
Phase voltage, line to line voltage, current
Active power, reactive power, active energy, reactive energy, power factor, frequency
Fundamental component, True RMS of current
4 Quadrant Power
Demand, peak demand
Maximum, Minimum
1kWh/kVARh received is positive for view as load, kWh/kVARh
delivered is positive for view as generator.
Power Quality
Voltage/current THD
Harmonic Analysis
K factor
It is available only on RS485 communication.
IrDA Communication
Harmonic graph
Vector diagram
Demand trend
Oscilloscope
Communication
RS485 Port[rear]
Modbus RTU Protocol
Baudrate: 1,200 ~ 57,600bps
IrDA Port[front]
Page 15
Power Supply
AC 85 ~ 265V, 50/60Hz
DC 100 ~ 300V
Burden: 10VA
Applications
True RMS Measurements robust to harmonics
Most of energy environments consist of nonlinear loads, such as industrial load, rectifier, power
electronic device, electric furnace and etc. this causes fatal distortion of voltage and current
waveforms. Accura 3300S makes high accuracy True RMS measurements for voltage and current
distorted with harmonics.
Power Quality Analysis
Accura 3300S provides k factor, analysis of voltage and current up to 31st harmonic, and realtime
waveform of voltage and current.
Compatibility with Analog Meters
Accura 3300S mounts directly in ANSI C39.1[4” Round] or DIN 96. this is perfect for new
installations and for existing panels. In new installations, simply use existing DIN or ANSI punches.
For existing panels, pull out old analog meters and fit the device in its cutout.
High Reliability Energy Management
The most important point to evaluate the overall data reliability of energy management is the
accuracy of meters. Accura 3300S makes ±0.2% high accuracy measurements for voltage and
current, and conforms to IEC62053-22 class 0.5S for power and energy. Energy management
gives customers various services, monitoring, cost curtailment, demand, energy planning, and etc.
Page 16
Parameters
Realtime
1
Average
2
Total
3
Maximum
4
Minimum
5
Phase voltage
Line to line voltage
Current
Power Active
Reactive
Apparent
Energy6 Active
Reactive
Apparent
Frequency
Power factor
THD Voltage
Current
Demand Power
Current
1Instaneous measuring. 2Average of three phase parameters. 3Total sum of three phase parameters.
4If realtime measurements exceed maximums, the maximums will be updated.
5If realtime measurements is less than minimums, the minimums will be updated.
6Energy is periodically stored to non-volatile memory. It is available only on RS485 communication.66
Note
The Maximums and minimums will not be updated with no power-up.
All of the measurements are not shown for 5 seconds after power-up.
Page 17
Chapter 2 Mounting
Environmental Conditions
The Accura 3300S should be mounted in a dry, dirt free location away from heat sources and very
high electric fields. To operate properly and effectively, environmental conditions should range
within the following guidelines
Items Acceptable Range
Position Indoor use
Operating Temp -20 ~ 70°C[-4 ~ 158]
Storage Temp -40 ~ 85°C[-40 ~ 185]
Operating Humidity 5 ~ 95% Non condensing
Enclosure Considerations
The enclosure the Accura 3300S is mounted in (typically a switchgear cabinet) should protect the
device from atmospheric contaminants such as oil, moisture, dust, and corrosive vapors, or other
harmful airborne substances. The mounting enclosure should be positioned such that the doors
may be opened fully for easy access to the Accura 3300S wiring and related components to allow
for convenient troubleshooting.
Warning
The meter shou
ld be installed in a switchgear cabinet or similar enclosure to ensure the terminal
strips on the meter base are not user accessible after installation.
Mount the meter in a dry location free from dirt and corrosive vapors. Once installed, no cleaning
of the device is necessary.
Page 18
Before You Begin
Before installing the meter, observe the instructions in this guide and read the safety precautions
presented on the Installation Considerations page.
Danger
Power up after the voltage and current wiring is completed.
Meter Overview
Fig 2.1 Front Side Fig 2.2 Rear Side
Page 19
Meter Dimensions
Fig 2.3 Front View Fig 2.4 Rear View
Fig 2.5 Side View
Page 20
Step 1: Mounting
Sequence
1. Remove connector on the bottom of the meter.
2. fit the meter into cutout[ANSI 4 or DIN96]
Fig 2.6 ANSI 4 Fig 2.7 DIN96
Note
The meter is mounted on switchgear boards (metal cabinet) in electrical facilities.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52

ROOTECH Accura 3300S User guide

Category
Measuring, testing & control
Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI