ROOTECH Accura 3300 User guide

Category
Measuring, testing & control
Type
User guide
ACCURA 3300
High Accuracy Digital Power Meter
With full features of power measurements
Becomes a necessary solution to you.
User Guide[English]
Rev 1.7 2018/01/02
Page 2
Page 3
Notice
Caution
Indicates the presence of
dangerous voltage which can cause severe injury or death
to persons if proper precautions are not followed.
Warning
Alerts
the user to the presence of hazards which can cause somewhat injury to
p
ersons, damage to property or damage to the device itself, if proper precautions
are not followed.
Note
Indicates the users attention to installation, operating and maintenance instructions.
Electrical Symbols
Indicates alternative voltage or current.
Indicates direct voltage or current.
Installation Considerations
Installation and operation of Accura 3300 meter should be performed only by qualified,
competent personnel that have appropriate training and experience with high voltage and current
devices.
Caution
Failure to observe the following instructions may result in severe injury or death.
During normal operation of the Accura 3300 meter, hazardous voltages are present on
its terminal strips.
Standard safety precautions are followed while performing any installation or service
work[removing PT fuses, shorting CT secondaries, etc].
Do not access to terminal strips of the Accura 3300 meter after installation.
Page 4
Warning
Observe the following instructions, or permanent damage to the meter may occur.
Do not apply Accura 3300 to voltages and currents that exceed Input ratings of PT and
CT.
About Manual
Rootech Inc. reserves the right to make changes in the device specifications shown in this User
Guide without notice. Rootech Inc. advises customers to obtain the latest specifications of device
before giving orders to confirm that the information being relied on by the customer is up to date.
In the absence of written agreement to the contrary, Rootech Inc. assumes no liability for Rootech
Inc. applications assistance, customer’s system design, or infringement of patents or copyrights of
third parties by or arising from the use of devices described herein.
The information contained in this document is believed to be accurate at the time of publication,
however, Rootech Inc. assumes no responsibility for any errors which may appear here and
reserves the right to make changes without notice.
Limitation of Liability
Where applicable law allows and does not prohibit or restrict such limitation, the Rootech, Inc’s
liability for anything relating to this product shall be limited to the price paid for the product.
Page 5
Warranty
For products and software that are sold or licensed by Rootech Inc. during the period from the
date of receipt by you until the present, Rootech warrants only to the original purchaser.
The purchased products shall be substantially free from material defects in material and
workmanship by Rootech for two years from the date receipt by you.
The software itself is provided as is without any warranty of any kind.
In order for the original purchaser to make a claim under the warranties described above, the
original purchaser must promptly contact Rootech headquarter. After receiving such notice,
Rootech may either in Rootechs sole discretion, examine the product at the original purchasers
site or issue shipping instructions to the original purchaser to return the relevant product to
Rootech for examination at the original purchasers expense, transportation charges prepaid.
If after examining the product Rootech reasonably confirms that such examined product does not
meet the warranties, then the original purchasers sole remedy and Rootechs sole obligation or
liability shall be, at Rootechs option, to repair, replace or refund the price paid for that product.
Limitation of Warranty
The Warranty does not apply to uninterrupted or error-free operation of the Product or cover
normal wear and tear of the product or costs caused by the removal, installation, or
troubleshooting of the customer's electrical systems.
The warranty claims for defects caused by any of the following factors are not covered.
Improper use(alteration, accident, misuse, abuse) or Failure to act in accordance with
installation, operation or maintenance instructions
Unauthorized modifications, changes or attempted repairs
Failure to comply with applicable safety standards & regulations
Damages when transporting or storing
Damages by force majeure, examples are(not necessarily limited): fire, flood, earthquakes,
storm damage, overvoltage & lightning
Page 6
If the original identify markings(trade-mark, serial number, etc) have been defaced, altered,
or removed
Rootech shall not be liable for any other claim than a claim solely for the breach of one of the
above warranties that is made in accordance with the above described procedures- made by the
original purchaser, its employees, agents, or contractors for any loss, damage, or expense
incurred due to, caused by, or related to any purchased product.
Any technical assistance provided by Rootech's personnel or representatives in system design shall
be deemed to be a proposal and not a recommendation. The responsibility for determining the
feasibility of such proposals lies with the original purchaser and should be tested by the original
purchaser.
It is the original purchaser’s responsibility to determine the suitability of any product and
associated documentation for its purposes. The original purchaser acknowledges that 100% "up"
time is not realizable because of possible hardware or software defects. The original purchaser
recognizes that such defects and failures may cause inaccuracies or malfunctions.
Only the terms expressed in these limited Warranties shall apply and no distributor, corporation or
other entity, individual or employee of Rootech or any other entity is authorized to amend, modify
or extend the Warranties in any way.
Page 7
Standard Compliance
CE Approved
EN61326 and IEC61010
Process Control Equipment
E324900
QMS-1347 KAB-QC-09
Page 8
Revision History
The following versions of the Accura 3300 Users Guide have been are released.
Revision #
Revision date
Description
Revision 1.0 2006. 06. 30 Initial draft
Revision 1.1 2007. 07. 13 Mounting modified
Revision 1.2 2012. 05. 21 Voltage input range modified
Revision 1.3 2015. 05. 12 Standard compliance updated
Revision 1.4 2016. 09. 05 Voltage wiring diagram updated
Revision 1.5 2017. 08. 07 IrDA deleted
Revision 1.6 2017. 08. 20 UL Certification code changed
Revision 1.7 2018. 01. 02 Notice, Warranty changed
Page 9
Contents
Chapter 1 Introduction ................................................................................................................................... 12
Overview ......................................................................................................................................................................................... 12
Power Measurements ..................................................................................................................................................... 12
Accuracy................................................................................................................................................................................ 12
Power Quality ..................................................................................................................................................................... 12
CE/UL Safety and Reliability ........................................................................................................................................ 12
Features ........................................................................................................................................................................................... 13
Measurement ..................................................................................................................................................................... 13
Power Quality ..................................................................................................................................................................... 13
Communication ................................................................................................................................................................. 13
Power Supply...................................................................................................................................................................... 13
Applications ................................................................................................................................................................................... 14
True RMS Measurements robust to harmonics ................................................................................................. 14
Power Quality Analysis .................................................................................................................................................. 14
Compatibility with Analog Meters ........................................................................................................................... 14
High Reliability Energy Management ..................................................................................................................... 14
Parameters ..................................................................................................................................................................................... 15
Chapter 2 Mounting ..................................................................................................................................... 16
Environmental Conditions ............................................................................................................................................ 16
Enclosure Considerations ............................................................................................................................................. 16
Before You Begin ........................................................................................................................................................................ 17
Meter Overview................................................................................................................................................................. 17
Meter Dimensions ............................................................................................................................................................ 18
Step 1: Mounting ..................................................................................................................................................................... 19
Sequence .............................................................................................................................................................................. 19
Step 2: Voltage and Current Inputs ................................................................................................................................ 20
Voltage Input ...................................................................................................................................................................... 20
Current Input ...................................................................................................................................................................... 21
Wiring Diagram Using External PTs ........................................................................................................................ 22
Direct Diagram Using No PTs .................................................................................................................................... 25
Step 3: Wire the RS485 Communication ........................................................................................................................ 28
Step 4: Wire the Power Supply and Ground Terminal ............................................................................................. 29
Power Supply...................................................................................................................................................................... 29
Ground Terminal ............................................................................................................................................................... 29
Page 10
Step 5: Add a Cover/Power Up the Meter .................................................................................................................. 30
Add a Cover ........................................................................................................................................................................ 30
Power Up the Meter ....................................................................................................................................................... 30
Chapter 3 Meter Operation/Setup ............................................................................................................. 31
Display Mode ............................................................................................................................................................................... 31
Setup Mode .................................................................................................................................................................................. 35
Reset Mode ................................................................................................................................................................................... 37
System Mode ................................................................................................................................................................................ 38
Reactive Calculation Method...................................................................................................................................... 40
APPENDIX A Standard Specification.......................................................................................................... 42
APPENDIX B Standard Compliance ............................................................................................................ 43
APPENDIX C Test Report ............................................................................................................................. 44
Measuring Test ............................................................................................................................................................................. 44
Reliability Test ............................................................................................................................................................................... 45
INDEX ................................................................................................................................................................. 46
Page 11
Figures
Fig 1.1 Front Side ............................................................................................................................................................. 17
Fig 1.2 Rear Side ............................................................................................................................................................... 17
Fig 1.3 Front View ............................................................................................................................................................ 18
Fig 1.4 Rear View.............................................................................................................................................................. 18
Fig 1.5 Side View .............................................................................................................................................................. 18
Fig 1.6 ANSI 4” .................................................................................................................................................................. 19
Fig 1.7 DIN96 ..................................................................................................................................................................... 19
Fig 1.8 Voltage and Current Connector ................................................................................................................ 20
Fig 1.9 Single Phase 2 Wires, Wiring Mode = 1P2U ...................................................................................... 22
Fig 1.10 Three Phase 3 Wire Open Delta Using 2CTs, Wiring Mode = 3P3O ................................... 23
Fig 1.11 Three Phase 3 Wire Open Delta Using 3CTs, Wiring Mode = 3P3O ................................... 23
Fig 1.12 Three Phase 4 Wires Using 3 PTs and 3 CTs, Wiring Mode = 3P4U ................................... 24
Fig 1.13 Single Phase 2 Wire Direct , Wiring Mode = 1P2U ..................................................................... 25
Fig 1.14 Single Phase 3 Wire Direct Using 2 CTs, Wiring Mode = 1P3U ............................................ 26
Fig 1.15 Three Phase 3 Wire Open Delta Direct, Wiring Mode = 3P3O .............................................. 26
Fig 1.16 Three Phase 3 Wire Open Delta Direct Using 3 CTs, Wiring Mode = 3P3O ................... 27
Fig 1.17 Three Phase 4 Wire Direct Using 3 CTs, Wiring Mode = 3P4U ............................................. 27
Fig 1.18 Communication Wiring ............................................................................................................................... 28
Fig 1.19 Wiring of Power Supply and Ground Terminal ............................................................................... 29
Fig 1.20 Cover .................................................................................................................................................................... 30
Fig 2.1 Measurement Groups ..................................................................................................................................... 31
Fig 2.2 P, Q[according to general calculation] ................................................................................................... 40
Page 12
Chapter 1 Introduction
Overview
Power Measurements
Accura 3300 is a high accuracy digital power meter, suited to power measurements. The device is
applied to a variety of applications, electrical facilities, intelligent building system, factory,
generator and etc, making measurements of voltage, current, power, frequency, power factor, and
demand.
Accuracy
The measuring accuracy is the most important criterion to evaluate the reliability of energy
management system. Actually low accuracy makes it hard for customers to precisely manage
energy, causing inequality of energy between incoming feeder and sum of load sides. Accura
3300 makes ±0.2% high accuracy measurements for voltage and current, and conforms to
IEC62053-22 class 0.5S for power and energy. This makes it possible to solve the problem with
energy inequality.
Power Quality
Accura 3300 provides the information of power qualities, such as voltage/current THD, harmonic
analysis, and k factor.
CE/UL Safety and Reliability
The structure- framework, circuit, fire - of Accura 3300 conforms to safety standard,
CE[IEC61010], UL[UL61010-2, 2nd edition]. Particularly the device provides pass-through busbar,
allowing CT leads to be terminated on the device. This eliminates any possible point of failure at
the device.
Page 13
Features
Measurement
64 Sampling/Cycle True RMS
IEC 62053-22 Class 0.5S
50, 60Hz
Phase voltage, line to line voltage, current
Power, energy, power factor, frequency
Fundamental component, True RMS of current
4 Quadrant Power
Demand, peak demand, Prediction demand
Maximum, Minimum
Power Quality
Voltage/current THD
Harmonic Analysis
K factor
It is available only on RS485 communication.
Communication
RS485 Port[rear]
Modbus RTU Protocol
Baudrate: 1,200 ~ 57,600bps
Power Supply
AC 85 ~ 265V, 50/60Hz
DC 100 ~ 300V
Burden: 10VA
Page 14
Applications
True RMS Measurements robust to harmonics
Most of energy environments consist of nonlinear loads, such as industrial load, rectifier, power
electronic device, electric furnace and etc. this causes fatal distortion of voltage and current
waveforms. Accura 3300 makes high accuracy True RMS measurements for voltage and current
distorted with harmonics.
Power Quality Analysis
Accura 3300 provides k factor, analysis of voltage and current up to 31st harmonic, and realtime
waveform of voltage and current.
Compatibility with Analog Meters
Accura 3300 mounts directly in ANSI C39.1[4” Round] or DIN 96. this is perfect for new
installations and for existing panels. In new installations, simply use existing DIN or ANSI punches.
For existing panels, pull out old analog meters and fit the device in its cutout.
High Reliability Energy Management
The most important point to evaluate the overall data reliability of energy management is the
accuracy of meters. Accura 3300 makes ±0.2% high accuracy measurements for voltage and
current, and conforms to IEC62053-22 class 0.5S for power and energy. Energy management
gives customers various services, monitoring, cost curtailment, demand, energy planning, and etc.
Page 15
Parameters
Realtime
1
Average
2
Total
3
Maximum
4
Minimum
5
Prediction
6
Phase voltage
Line to line voltage
Current
Power Active
Reactive
Apparent
Energy Active
Reactive
Apparent
Frequency
Power factor
THD Voltage
Current
Demand Power
Current
1Instaneous measuring. 2Average of three phase parameters. 3Total sum of three phase parameters.
4If realtime measurements exceed maximums, the maximums will be updated, the measurements being
ignored within 10msecs after power up.
5If realtime measurements is less than minimums, the minimums will be updated, the measurements being
ignored within 10msecs after power up.
6 Prediction demand is calculated based on realtime energy.
Note
The Maximums and minimums will not be updated with no power-up.
Page 16
Chapter 2 Mounting
Environmental Conditions
The Accura 3300 should be mounted in a dry, dirt free location away from heat sources and very
high electric fields. To operate properly and effectively, environmental conditions should range
within the following guidelines
Items Acceptable Range
Position Indoor use
Operating Temp -20 ~ 70°C[-4 ~ 158]
Storage Temp -40 ~ 85°C[-40 ~ 185]
Operating Humidity 5 ~ 95% Non condensing
Enclosure Considerations
The enclosure the Accura 3300 is mounted in (typically a switchgear cabinet) should protect the
device from atmospheric contaminants such as oil, moisture, dust, and corrosive vapors, or other
harmful airborne substances. The mounting enclosure should be positioned such that the doors
may be opened fully for easy access to the Accura 3300 wiring and related components to allow
for convenient troubleshooting.
Warning
T
he meter should be installed in a switchgear cabinet or similar enclosure to ensure the terminal
strips on the meter base are not user accessible after installation.
Mount the meter in a dry location free from dirt and corrosive vapors. Once installed, no cleaning
of the device is necessary.
Page 17
Before You Begin
Before installing the meter, observe the instructions in this guide and read the safety precautions
presented on the Installation Considerations page.
Danger
Power up after the voltage and current wiring is completed.
Meter Overview
Fig 1.1 Front Side Fig 1.2 Rear Side
Page 18
Meter Dimensions
Fig 1.3 Front View Fig 1.4 Rear View
Fig 1.5 Side View
Page 19
Step 1: Mounting
Sequence
1. Remove connector on the bottom of the meter.
2. fit the meter into cutout[ANSI 4 or DIN96]
Fig 1.6 ANSI 4 Fig 1.7 DIN96
Note
The meter is mounted on switchgear boards (metal cabinet) in electrical facilities.
Page 20
Step 2: Voltage and Current Inputs
Fig 1.8 Voltage and Current Connector
Voltage Input
Pin name V1, V2, V3, Vn
Connector Terminal block
Wire 2.1 to 3.5 mm2[ 14 to 12 AWG]
Rating1 0 ~ 600V 3 ~ L-L[Line to line], 0 ~ 457V 3 ~ L-N[Line to neutral]
Burden 0.02VA/phase @220V
Impedance 3MΩ/phase
Compliance Pollution degree 2, Installation Category
Warning
In three phase 3 wire open delta direct, line to line voltage should not exceed 457V because the
voltage is applied to the inputs of phase voltage.
PT[Potential Transformer]
PTs are required for all systems with voltage levels greater than these above. The meter inputs can
be used with PTs that have secondaries rated between AC 0V and 457V. PTs should comply with
IEC61010-1 2nd Edition, Pollution Degree 2, Overvoltage Category .
Warning
In case where PTs are required, the secondaries should be fused.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48

ROOTECH Accura 3300 User guide

Category
Measuring, testing & control
Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI