Gleason Reel WBL-40X-AM "Z" Light Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Gleason Reel WBL-40X-AM "Z" Light Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Printed in USA Bulletin No. 63016302.a
1. Remove End Caps, which would interfere with insertion of track nuts,
from horizontal workstation support rails and light support rail.
2. Install light, centering it on light support rail (Fig. 1) as shown in
separate instructions provided with light.
3. Loosen track nuts on “Z” brackets and slide into ends of light
support rail (Fig. 1). Finger tighten only.
4. Slide track nuts on bottoms of “Z” brackets into ends of horizontal
workstation support rails.
5. Position light where desired.
6. Tighten all track nuts, clamping light support rail to workstation
support rails
7, Complete light installation.
“Z” BRACKET INSTALLATION
“Z” BRACKETS
for raising light sup-
port rail above work-
station support rail.
LIGHT SUPPORT
RAIL
TOOL RAIL
OVERHEAD WORK LIGHT
attached to light support rail.
(see installation instructions
with light)
HORIZONTAL
WORKSTATION
SUPPORT RAIL
LIGHT
SUPPORT
RAIL TRACK
NUT
TRACK
NUT
WORKSTATION
SUPPORT RAIL
“Z” BRACKET
Figure 2-END VIEW
Figure 1-Reference Drawing
“Z” BRACKET INSTALLATION
Supplement to Light Installation Instructions.
Optional Z brackets allow light to be mounted with bottom of light fixture is flush with bottom of horizontal workstation support rail.
NOTE: Z brackets are designed to be used for light support rails only and are not recommended for supporting tool rails.
600 South Clark St.
Mayville, WI 53050
Phone: 920-387-4120
HUBBELL
®
Workplace Solutions
/