Construction Metals 3-4RJ Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Construction Metals 3-4RJ Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
ADJUSTABLE PIPE FLASHING #3-4RJ
INSTALLATION GUIDELINES
These basic installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed
professional, and to check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
24 Gauge Galvanized Steel Base with Adjustable Elastomer Collar • 3 inch & 4 inch
Using the pull tabs, adjust the size of the opening to fit
the pipe.
1. After shingling up to the pipe, slide flashing down over pipe.
3. Secure flange with 6 roofing nails. 4. Continue shingling above the vent pipe to complete the
installation. The tight neoprene seal means there's no need for
any sealant at the base of the pipe.
3 & 4 ADJUSTABLE
FLASHING
Leave all tabs intact for 3 in. pipes
Remove Pull Tab for 4" pipes
FLANGE
METAL BASE
PULL TAB
ELASTOMER
COLLAR
(A)
3-4 Flange: 12" x 16"
3
2
1
Push down on
tab to break,
then pull up
to remove
/