Gibraltar Building Products 05152 Operating instructions

Type
Operating instructions
#RJ3FHA-SP
1. Shingle up to the roof penetration. 2. Slide ashing over the vent pipe.
3. Secure ange with 6 roong nails. 4. Continue shingling above the vent pipe. Optional: apply
roong mastic around the mouth of the cone and to the top
of the ange before installing upper side shingles.
1
2
3
4
FHA PIPE FLASHING
INSTALLATION GUIDELINES
These basic installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed
professional, and to check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
  • Page 1 1

Gibraltar Building Products 05152 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI