IPS CMIRC34 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the IPS CMIRC34 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
ADJUSTABLE RAIN COLLAR #CMIRC34
INSTALLATION GUIDELINES
These basic installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed
professional, and to check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
Adjustable Elastomer Collar • 3 inch or 4 inch
Do not use petroleum based mastics, sealing compounds or paint on elastomer collar
Identify the pipe size (outside diameter) and modify the Rain Collar
to match.
Slide the Rain Collar over the existing pipe and flashing to create
a 2 collar system.
Push down on
tab to break,
then pull up
to remove
/