Figures
1-1. Power Switch ...............................1-2
1-2. NAS Cables Installation ...........................1-3
1-3. NAS Connectors ..............................1-4
1-4. Keyboard Installation in 37U Rack .......................1-5
1-5. Bracket Positioning for the NAS in a 37U Rack...................1-6
1-6. Brackets Installation.............................1-6
1-7. Detail of Lower Plate Installation ........................1-7
1-8. NAS and Display Installation in a 37U Rack ....................1-7
1-9. Brackets and Captive Nuts Positioning for the NAS with Earthquake Feature........1-8
1-10. Brackets Installation.............................1-8
1-11. Captive Nuts Installation ...........................1-9
1-12. Lower and Upper Plate Installation in 37U Rack (Earthquake) .............1-10
1-13. Detail of Lower Plate Installation........................1-11
1-14. Support Installation at the Rear of a 37U Rack ..................1-11
1-15. Installing the Retainers to Secure the NAS in a 37U rack (Earthquake) .........1-12
1-16. Display Installation.............................1-13
1-17. Display Assembly Installation in a 37U Rack ...................1-14
1-18. Display and Keyboard Cables Connection to the NAS................1-15
1-19. NAS Connectors .............................1-15
1-20. Connecting the NAS Installed in a 37U Rack to the APC Card.............1-16
1-21. Keyboard Installation in 29U Rack .......................1-17
1-22. NAS Installation in 29U Rack .........................1-18
1-23. Captive Nut Positioning for the NAS with Earthquake Feature in 29U Rack ........1-19
1-24. Captive Nut Installation ...........................1-19
1-25. Upper Plate Installation in 29U Rack ......................1-20
1-26. Support Installation at the Rear of a 29U Rack ..................1-21
1-27. Installing the Retainers to Secure the NAS in a 29U rack ..............1-22
1-28. Removing of the Top Cover .........................1-23
1-29. Safety Retainers Installation .........................1-24
1-30. Display Installation on Top of 29U Rack .....................1-25
1-31. Display and Keyboard Cables Connection to the NAS................1-26
1-32. NAS Connectors .............................1-27
1-33. Connecting the NAS Installed in a 29U Rack to the APC Card.............1-28
1-34. Modem Type A ..............................1-29
1-35. Modem Type B ..............................1-29
1-36. Modem Type C ..............................1-29
1-37. 7857 Front Panel .............................1-30
1-38. 7857 Rear Panel .............................1-33
1-39. 7857 Modem Operator Panel Display ......................1-35
1-40. Connecting the NAS to the 7857 Modem ....................1-36
1-41. Hayes Modem Front View ..........................1-37
1-42. Hayes Modem Rear View ..........................1-37
1-43. Connecting the NAS to the Hayes Modem ....................1-38
1-44. 7858 Front Side..............................1-39
1-45. 7858 Rear Panel .............................1-39
1-46. 7858 Operator Panel Display .........................1-40
1-47. 7858 Operator Panel Display .........................1-41
1-48. Connecting the NAS to the 7858 .......................1-42
3-1. Nways Switch Window List ..........................3-5
3-2. SLIP Driver Correct Status ..........................3-5
3-3. SLIP Driver Error Status ...........................3-6
3-4. Example of PM Ping Results .........................3-8
4-1. Nways Switch Resource Control Window .....................4-3
© Copyright IBM Corp. 1998, 2000 v