Classic Exhibits VK-0005 Setup Instructions

  • Hello! I am an AI chatbot trained to assist you with the Classic Exhibits VK-0005 Setup Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
© 2018
Order #XXXXX
SETUP INSTRUCTIONS
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
VK-0005 General Layout
Plan View
Perspective View
© 2018
Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all setscrews
and locks during disassembly
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2018
Order #XXXXX
SEG Graphic Installation
1) Locate channels along the edges of extrusions
2) Insert graphic corners first into channels then center
point of graphic into channels. Allows for proportional
fit around the perimeter of the extrusion.
3) Working from center to corner, slide silicon edge
on graphic into channel.
4) After all edges of graphic have been inserted into
channels, step back and assess graphic fit, make
adjustments where needed.
4
13
2
Fold edges over.
Insert into
groove
of frame
General Information
CEI-152 Profile
TS RV 4
Bracket
Insert bracket
into the Interior
Center Slot
of extrusion.
Secure inserted half
of bracket, using
set screws.
Slide connecting
extrusion over
exposed end
of bracket.
Completed
Assembly
Secure extrusion,
using remaining
set screws.
Set
Screw
CEI-152 Frame Assembly
Disassembly
1) Loosen set screws on brackets and slide
extrusions off of brackets.
Straight Bracket Installation (when required)
1) Slide TWO-PIECE TS RV 4 straight bracket into
Interior Center Slot of extrusion so that two of the
set screws are inside groove.
Tighten two set screws to secure.
2) Slide connecting extrusion over exposed end
of bracket. Tighten two remaining set screw
to secure extrusions.
Corner Bracket Installation
1) Slide TWO-PIECE TS RV 2 L-bracket into
Interior Center Slot of extrusion so that two
set screws are inside groove.
Tighten two set screws to secure.
2) Slide two A1 L-Brackets into outer interior
grooves of upper and lower horizontals.
Tighten set screws to secure.
3) Slide vertical extrusion over exposed ends
of brackets in lower horizontal.
Tighten set screws to secure.
4) Slide exposed ends of installed brackets of
upper horizontal into open ends of verticals.
Tighten set screws to secure.
TS RV 2
Upper
Horizontal
Lower
Horizontal
Upper
Horizontal
Lower
Horizontal
TS RV 2
Insert L-Brackets into the
Interior Center Slot & outer
interior grooves of extrusion.
Slide verticals over
brackets of lower
horizontal, then slide
upper horizontal &
brackets into grooves
& center slots
of verticals.
12 Brackets Total:
(4) - TS RV 2
(8) - A1 L-Brackets
A1
A1
A1
A1
Completed
Assembly
Straight Connection
Corner Connection
© 2018
Order #XXXXX
Case 1 of 1
Case Packing
Shelf
Shelf Infills
2 2A
3A3 6 7 8A
9A
9
5 10
10A
10A
10A
Shelf
Base
Plate
Base
Plate
Graphics
Setup Hardware
Top View of Each Level
Level 1 Level 2 Level 3 Level 4 Level 5
8 4
9A
9
© 2018
Order #XXXXX
Step 1 of 1
VK-0005 Assembly
1
3
2
3A
2A
4
9A 8A
10
10A
10A
Shelf
Shelf
Cap
Shelf
10A
Infill
Infill
Infill
8
9
7
5
4
5
9A
9
6
Washer
Bolt
Wing Nut
1A
Item
1/1A
2/2A
3/3A
4
5
6
7
8/8A
9/9A
10/10A
Qty.
1/1
1/1
1/1
1
1
1
1
1/1
2/2
1/3
Description
Base Plate
46” CEI152 Horizontal Extrusion
40” CEI152 Vertical Extrusion
40” GS220 Vertical Extrusion
40” S44 Vertical Extrusion
40” GS220 Vertical Extrusion
40” GS220 Vertical Extrusion
17.4075” Z45 Horizontal Extrusion
5.4022” Z45 Horizontal Extrusion
17.3976” Z45 Horizontal Extrusion
Steps:
1) Attach Base Plate [1] to Horizontal [2], using Bolt, Washer, and Wing Nut.
2) Attach Base Plate [1A] to Vertical [5], using Bolt.
3) Assemble lightbox frame [2,2A,3,3A] together. See General
Information page for Corner Bracket Installation details.
4) Assemble Verticals [4,5,6,7], using Horizontals [8,9].
5) Slide Infills between and secure with Horizontals [8A,9A] on top.
6) Connect Vertical [4] to Vertical [3A]. See GS300 to CEI152 Connection detail.
6) Attach Horizontals [10,10A] between Verticals [4,5].
7) Connect Shelves to Horizontals [10A], using Connectors and Caps.
See Shelf Connection detail.
Bolt
Shelf Connection
Slide V20 Connectors with Set Screws into Horizontal
Extrusion. Thighten Set screw to lock in place. Set
Shelf onto Set Screws then secure with Caps.
*
V20 Connector
Shelf
Set Screw
Caps
**
**
**
Connect CEI152 Vertical Extrusion
to GS300 Vertical Extrusion, using
V31 and locking in place.
GS300 to CEI152 Connection
CEI152
GS300
Lights
*
V31
*
/