1B2HWK REV B
6.1 Reinstall tap bolt with washer, through bottom
6
rail and install jamb nut (C) onto tap bolt.
Rethread tap bolt into standoff nut.
6.2 Install and tighten floor anchor bolts through
anchor and spacer plates.
6.3 Thread tap bolt into standoff nut until bolt head
Jamb Nut (C)Floor Anchor Bolts
(supplied by
customer)
contacts bottom rail and secures work station,
then tighten jamb nut to secure tap bolt.
Repeat for all tap bolts.
7.1 Install end of (1) seismic cable (G) to anchor
bracket with 1/4-20 bolt(H), nut(J) and washer(I).
7.2 Secure opposite end of seismic cable to gusset
under mid-rail in opposite diagonal corner of
side wall, with 1/4-20 bolt, nut and washer.
Seismic cable (G)
1/4-20 bolt
7
7.3 Repeat steps .1 & .2 above for second seismic
cable so that cables are installed in an ”X”
configuration in side wall. Repeat for all cables.
8Adjust Turnbuckles
to tighten cables
About 2” of Lateral Play
(H)
8.1 Using 7/16” wrench, adjust tension on seismic
CAUTION
Do Not overtighten seismic cables. Damage to product
can occur if seismic cables are overly tightened.
!
cable turnbuckles equally until both cables have
about 2” of total lateral play.
1/4-20 bolt (H)
Seismic
cable (G)
4
4.1 After marking floor holes
drill all floor anchor
holes at marked locations
to required depth for type
Masonry Bit
Floor
4.2 Using hammer as necessary,
install all floor anchors, flush
into floor.
Floor Anchor
Hammer
4.3 Using hammer and floor anchor
setting tool, drive setting tool
flush with top of anchor to set
floor anchor securely into floor.
Floor Anchor
Setting Tool
Hammer
WARNING
The floor anchor kit and anchor setting tool are not
!
recommended for use in new concrete which has
not had time to cure. They are also not recom-
mended for use in lightweight masonry such as
block or brick.
NOTICE !
Under direction from local inspectors, install and
test anchor to verify they are compliant with
minimum holding force requirements. Make any
necessary corrections before proceeding with final
installation of anchored work station.
Anchor Plate (D)
Standoff Nut (E)
Spacer Plate (F)
5
5.1 With floor anchors installed and tested, move
work station back over floor anchors to begin
final installation of seismic hardware.
5.2 Place spacer plate (F) and standoff nut (E)
over installed floor anchors. Then place
anchor plate (D) over standoff nut. Repeat
for all floor anchor locations.
of anchor used.