THORLABS LFES1 Shelf for LFE Series Enclosure Frames
THORLABS LFES1 Shelf for LFE Series Enclosure Frames
Installation Guide
Manuals+ User Manuals Simplified.
Introduction
The LFES1 Shelf has been designed to provide additional storage space within the LFE1220 and LFE1220W
Optical Table Enclosures; it raises controllers and other equipment off the work-surface of the optical table whilst
keeping them accessible. The shelf panel is slotted to improve air flow to equipment mounted on it, and to assist
in the preservation of laminar flow within the enclosure environment. The hanging rails can be exchanged for any
other length of XE25 extrusion to give a different hanging height; simply order four extrusions of the desired
hanging length.
Multiple shelving units can be stacked as shown below.
Safety Information
For the continuing safety of the operators of this equipment, and the correct operation and protection of the
equipment itself, the operator should take note of the Warnings, Cautions and Notes throughout this section,the
other pages of this handbook and, where visible, on the product itself.
General Warnings and Cautions
Warning
If this equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment
may be impaired. In particular, excessive moisture may impair operation.
The equipment is for indoor use only. The equipment is not designed for use in an explosive atmosphere.
Caution
Heavy loads should be placed towards the ends of shelf where possible, to minimize chance of overloading.
Installation
Environmental Conditions
Warning
Operation outside the following environmental limits may adversely affect operator safety.
The unit is designed for indoor use only.
To ensure reliable operation, the unit should not be exposed to corrosive agents or excessive moisture, heat or
dust.
The unit is not designed to be used in explosive environments.
Parts List
Description Qty Image
Shelf Panel 1
375 mm Hanging Bar 4
LFES1 Attachment Bar 2
M6 x 40 mm Hex Socket Scre
w8
M6 x 16 mm Hex Socket Scre
w4
Large M6 Washer 8
Small M6 Washer 4
M6 Drop-in T-Nut 4
M6 Hex Key 1
Assembling the Shelf
The LFES1 Shelf is supplied as a preassembled shelf panel, four hanging bars, two mounting bars and all
required fixings and tools.
1. Lay the shelf panel with the silver face down on the table and one corner protruding over the edge.
2. Hold a XE25 Series Hanging Bar under the protruding corner cube.
3. Drop an M6 x 16 mm Socket Screw through the corner cube and screw in to secure the XE rail flush to the
cube (do not fully tighten the screws). Ensure that the lugs on the underside of the corner cube secure correctly
in the holes in the end of the Hanging Bar.
4. Repeat steps 1 and 2 to fit hanging bars to the remaining 3 corners of the shelf.
5. Turn shelf so the hanging bars point up.
6. Place an attachment bar on top of the two hanging bars as shown below.
7. Fit a large M6 washer to two of the M6 x 40 mm screws supplied, then pass a screw through each end of the
attachment bar and screw into the end of the hanging bars as shown. Do not fully tighten the screws.
8. Repeat steps 5 and 6 for the remaining attachment bar.
9. Tighten all M6 Screws.
Fitting the Shelf to the Frame
The LFES1 Shelf can be mounted to any face with Thorlabs XE profile slots. It is recommended that it be fitted
into two side by side parallel slots (e.g. in XE50 series extrusions). All the roof members of an LFE series
enclosure are suitable for this purpose. See Figure 6 for mounting options.
10. Insert an M6 T-nut into the extrusion slot at the approximate intended mounting position for the shelf.
Repeat in the parallel slot and again in the slots at the opposite end of shelf.
11. With two people, hold the shelf up to LFE frame.
12. Fit a small M6 washer to each of the four M6 x 40 mm bolts provided, followed by a large M6 washer, then pass
the bolts (two in each end of the shelf) through the slots in the attachment bars and secure in the T-nuts fitted
at step 10 as shown below. Do not fully tighten the bolts.
13. Slide shelf to desired position.
14. Tighten all four bolts.
There are a wide variety of options for mounting the shelf to the laminar flow enclosure frames. The cross bars
of the LFE1220 and LFE1220W Enclosure Frames, which are highlighted in yellow below, are all compatible
with the LFES1 shelf mounting hardware.
Specifications
General Specifications
Maximum Load 70.0 kg (154.0 lb)
Shelf Dimensions (W x L) 350.0 mm x 1175.0 mm (13.78″ x 46.26″)
Shelf Weight (Incl. Hanging Bars and Mounting Equipment) 6.74 kg (14.83 lb)
Shelf Hanging Height (with Standard Hanging Bars) 403.0 mm (15.87″)
Caution
To avoid damaging shelf, do not exceed maximum loads stated by manufacturer.
Thorlabs Worldwide Contacts
For technical support or sales inquiries, please visit us at www.thorlabs.com/contact for our most up-to-date
contact information.
USA, Canada, and South America
Thorlabs, Inc.
sales@thorlabs.com
techsupport@thorlabs.com
Europe
Thorlabs GmbH
europe@thorlabs.com
Japan
Thorlabs Japan, Inc.
sales@thorlabs.jp
China
Thorlabs China
chinasales@thorlabs.com
www.thorlabs.com
Documents / Resources
THORLABS LFES1 Shelf for LFE Series Enclosure Frames [pdf] Installation Guide
LFES1 Shelf for LFE Series Enclosure Frames, LFES1, Shelf for LFE Series Enclosure Frames
, Shelf for LFE Series, LFE Series Frames, Enclosure Frames, Frames
References
Thorlabs, Inc. - Your Source for Fiber Optics, Laser Diodes, Optical Instrumentation and Polarization
Measurement & Control
Thorlabs, Inc. - Your Source for Fiber Optics, Laser Diodes, Optical Instrumentation and Polarization
Measurement & Control
Manuals+,
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

THORLABS LFES1 Shelf for LFE Series Enclosure Frames Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI