Ratchet-Pro PVC Floor Box
INSTALLATION INSTRUCTIONS
Installation Instruction No.: 1 003 709 R1 – Updated July 2004
Walker
®
electrical systems conform to and should be properly
grounded in compliance with requirements of the current National
Electrical Code or codes administered by local authorities.
All electrical products may present a possible shock or fire
hazard if improperly installed or used. Walker electrical products
may bear the mark as UL Listed and/or Classified and should
be installed in conformance with current local and/or the
National Electrical Code.
Products Covered: 881 Floor Box
CONCRETE PREPARATION:
1. Cement conduit closure plugs to unused ports or use
conduit reducers if reduction from 1" trade size is
required. Knockout must be removed from closure
plug for use with 3/4" trade size conduit.
For use in 3" [76.2mm] minimum concrete pours.
3. Cut the conduit to length and cement to ports or reducers.
Install concrete cap and pour concrete to desired depth using
the graduated markings on the box exterior as a guide.
2. Position box and secure to prevent floating during the
concrete pour (Orientation of the receptacle is aligned
with the conduit). For above grade, screw or nail the box
to the concrete form. For on-grade applications, drive rebar
next to the box and secure with wire.
Concrete
Depth
CAUTION: Make sure the rebar is below the screed
level of the concrete.
IMPORTANT: Please read all instructions
before beginning.