USAutomatic SENTRY 300 S Installation guide

Category
Garage Door Opener
Type
Installation guide

This manual is also suitable for

Installation/Owners Manual
Battery Powered Solar or AC Charged
MADE IN THE USA
www.sentrygateopener.com
Designed to
open all types
of gates in all
kinds of places.
High Quality Low Voltage
Vehicular Swing Gate Opener
High Quality Low Voltage
Vehicular Swing Gate Opener
3
Year
Warranty
SENTRY
®
300 S / 300 D
1
INTRODUCTION
About the Sentry .......................................................................................................... 2
Safety Information ....................................................................................................... 3
Sentry Parts Inventory ................................................................................................. 5
Sentry Hardware Inventory .......................................................................................... 6
General Tool Requirements ......................................................................................... 6
PREPARATION AND OVERVIEW
GateQualications/Applications .................................................................................. 7
ProperGateDesign ..................................................................................................... 7
INSTALLATION
1. MountingSiteReview ............................................................................................ 8
2. DetermineProperBracketsandOpeningMethod ................................................. 9
3. AttachingUniversalActuatorBrackettoHingePostorPostBeingUsed ........... 11
4. AttachActuatorBrackettoUniversalActuatorBracket ....................................... 12
5. InstallLinearActuatortoActuatorBracket .......................................................... 12
6. InstallGateBrackettoLinearActuator ................................................................ 13
7. InstallGateBrackettoGate ................................................................................. 13
8. PrepareControlBoxforInstallation ..................................................................... 13
9. InstallSentryControlBox .................................................................................... 14
SplicingforSentry300SLinearActuatorCable(ifneeded)
10.SentryPlugNGoHarness .................................................................................. 15
11.InstallBattery ...................................................................................................... 15
12.InstallChargingSystem(ACorSolar) ................................................................. 16
13.ConnectChargeDevicetoChargeController ..................................................... 17
14.ChargeControllerOperationCheck .................................................................... 17
15.InstallLinearActuatorCable ................................................................................ 18
16.SentryPlugNGoHarnessFinalInstallation ....................................................... 18
17.SensitivityAdjustmentsandEntrapmentAlarm ................................................... 19
19.AdjustingGate1andGate2Sensitivity .............................................................. 20
20.ExtendandRetractLimitAdjustments ................................................................. 20
21.OperatingGatefortheFirstTime ........................................................................ 21
22.MakingFinalAdjustments .................................................................................... 21
23.InstallSafetySigns .............................................................................................. 22
24.ProgrammingTransmitterandReceiver .............................................................. 22
ENTRAPMENT ZONES ...................................................................................................... 24
PERIODIC SERVICE ........................................................................................................... 24
SENTRY 300 D GATE 2 INSTALLATION ...................................................................... 25
ACCESSORIES .................................................................................................................... 28
TROUBLESHOOTING ......................................................................................................... 34
APPENDIX ........................................................................................................................... 41
WARRANTY ......................................................................................................................... 45
TABLE OF CONTENTS
2
SENTRY
®
300 Series AUTOMATIC GATE OPENER
TheSentryGateOpenerisintendedtobeinstalled
onvehicularClassI,II,IIIorIVgatesasdenedby
UL325,(thestandardthatregulatesgateopener
safety,asestablishedandmadeeffectiveMarch14,
2003,byUnderwritersLaboratories,Inc.)
TheSentryGateOpeneristhersttrulysolar
chargedgateopenerfortheDoItYourself
market.Thesystemdesignandtheaccessories
recommendedareallSolarFriendlymeaningthat
theyrequiretheleastamountofenergypossible
toperformthejobtheyweredesignedtodo.The
solaroptionallowsyoutoinstallthegateopenerin
remoteareasorinapplicationswhereyoupreferto
besolarcharged.Solarchargingprovidesisolation
fromlightningthatmightdamagetheunitviathe
ACpowerneededforthetransformer.
The Sentry Gate Opener is powered by a 12 VDC battery(notincluded).Thisbatteryischarged
bythesuppliedtransformerwhichrequiresACpower(120VAC)tobeeitheratthegateareaorwithin
1000feetofthegatearea.IftheACpowerismorethan10feetfromthegateopenercontrolboxthen
additionalextensioncableisrequired(seeSentrychargecableextensionkitinformation).
Ifpreferred,youmayusetheoptionalSentrySolarPanelkit(PN520015)tochargethebattery.
Typicallyonlyonepanelwillberequired.TheSentryGateOpeneriscapableofahighnumberof
cyclesperday.Forinformationonwhatyoucanexpectfromasolarchargedsystemseethesolar
chargingsectionofthismanual.(page41)Accessoriesthatareaddedtoyourgateopenermustbe
solarfriendlyaccessoriesandtheywillbeidentiedassuch.
The Sentry Gate Opener features an easy to connect Plug N Go wiring harness that eliminates
the need for any complicated wiring.Theonlywiringrequiredconsistsoftwowiresfromthe
harnessthatmustbeconnectedtothebatterypositiveterminal(redwire)andbatterynegative
terminal(blackwire).Allcomponentshavebeenpre-installedsothatinstallationcantypicallybe
completedinlessthanonehour.
The Sentry control board features high quality components and industry leading ideas such
as auto resetting fuses for motor protection.Theoldautomotivetypefusethatfrequentlyfail
havebeendesignedoutofthiscontrollertoavoidtheunnecessaryexpenseofbuyingfuses.Another
patentpendingitemdesignedintothecontrolboardistheonboardpotentiometersforadjustingstop
limits.Manyotherfeatureshavebeendesignedintothecontrolboardtoensuresuperioroperation
foryearstocome.AttentiontodetailandqualitypartsmakestheSentryGateOpenertheFirstHigh
QualityGateOpenerfortheDoItYourselfInstaller.USAutomaticappreciatesthefactyouhave
recognizedthequalityoftheSentrygateopenerforyourinstallationandwouldappreciateyour
commentsonhowwearedoingsothatwemaycontinuetobuildanddesignproductsinthefuture
thatworkthewayyouwantthemto.
PLEASE READ THE ENTIRE MANUAL CAREFULLY PRIOR TO INSTALLATION.
Indoingso,alongwithperformingtheinstallationinstep-by-steporder,youwillachieveoptimal
results.YourSentrycontrolboardwasdesignedwithacurrentsensesafetyfeatureandwestrongly
recommendothersafetydevicessuchasphotoeyestomakeeachparticularinstallationassafeas
possibleandreducetheriskofpersonalinjuryand/orpropertydamage.
PleasereadcarefullyandunderstandtheSafetySectionofthemanual.
3
USAutomaticgateoperatorsarecertiedtoUL325VehicularClassI,II,IIIandIVswinggatestandards.
UL325identiesfourdifferentclassesofgateoperators.Theseclassesare:
Class I: Residentialvehiculargateoperator-vehiculargateoperator(orsystem)intendedforuseina
homeofonetofoursinglefamilydwellingsoragarageorparkingareaassociatedtherewith.
Class II:Commercial/Generalaccessvehiculargateoperator-vehiculargateoperator(orsystem)
intendedforuseinacommerciallocationorbuildingsuchasmulti-familyhousingunit(veor
moresinglefamilyunits),hotelgarages,retail,orotherbuildingsservicingthegeneralpublic.
Class III:Industrial/Limitedaccessvehiculargateoperator-vehiculargateoperator(orsystem)
intendedforuseinanindustriallocationorbuildingsuchasafactoryorloadingdockareaor
otherlocationsnotintendedtoservethegeneralpublic.
Class IV:RestrictedAccessvehiculargateoperator-vehiculargateoperator(orsystem)intended
foruseinaguardedindustriallocationorbuildingsuchasanairportsecurityareaorother
restrictedaccesslocationsnotservicingthegeneralpublic,inwhichunauthorizedaccessis
preventedviasupervisionbysecuritypersonnel.
INSTALLATION
Install the gate operator when:
• Operatorisappropriatefortheconstructionofthegateandusageclassiscorrectforthe
installation.
• Allexposedpinchpointsareeliminatedorguarded.
• Thegateisavehiclegate.Pedestriansmustbesuppliedwithaseparateaccessopening.
• Thegateisinstalledinalocationwhereenoughspaceissuppliedbetweenadjacentstructuresand
thegatethatwhenopeningorclosingthechanceofentrapmentisreduced.
• Thegatedoesnotswingintopublicaccessareas.
• Thegateisproperlyinstalledandswingsfreelyinbothdirections.Donotoveradjustthesensitivity
adjustmenttocompensateforanimpropergateinstallation.
• Allcontrolsarelocatedatleastsixfeetawayfromthegatetoeliminatethechanceoftheperson
operatingthegatefromcomingincontactwiththemovinggate.Donotinstallexternalbuttons,
whichcanbeusedtooperatethegatewithinthereachofchildren.
• Placardsareinstalled,oneoneachsideofthegateandvisibleinthegatearea.
• Allcontactsensorsusedforsecondaryentrapmentsafetydevicesandtheirwiringisinstalledina
mannerwhichprotectsthemfrommechanicaldamage.
• Allnon-Contactsensorsusedforsecondaryentrapmentsafetydevicesarelocatedsothatthe
signalfromthetransmittertothereceiverisnotinterferedwithbyadjacentstructures.Allexposed
wiringmustalsobeprotectedfrommechanicaldamage.
SECONDARY ENTRAPMENT DEVICES
USAutomatic designs all control boards with secondary entrapment inputs. USAutomatic
recommends that UL325 listed secondary safety devices be installed with all installations.
USAutomaticrecommendsthatthesedevicesbeconnectedafterpropergateinstallationand
operationhasbeenveried.Thenconnectonedeviceatatimetoverifyproperoperationbefore
installingthenextdevice.Ensurethatpowerisdisconnectedfromthecontrolboardpriortowiring
anyaccessory.
SAFETY INSTALLATION INFORMATION
4
WARNING
TO REDUCE THE RISK OF INJURY OR DEATH
1. READ AND FOLLOW ALL INSTRUCTIONS
2. Study the entire Safety Section paying particularly close attention to the entrapment zones
and be aware of these areas not only during use but also during any adjustments to the unit.
3. Do not attempt to enter the gate area while the gate is moving. Wait until the gate comes to
a complete stop.
4. Never let children operate or play with gate controls or any other activation device. Keep
remote control away from children.
5. DO NOT ALLOW CHILDREN TO PLAY IN THE AREA OF THE GATE.
6. Do not allow anyone to ride on the gate.
7. Always keep people and objects away from the gate.
8. NO ONE SHOULD CROSS THE PATH OF A MOVING GATE.
9. Operate the gate only when it is fully visible, free of persons or obstructions, and properly
adjusted.
10. Do not attempt to “beat the gate” while the gate is opening or closing. This is extremely
dangerous.
11. Test gate operator monthly. The gate must stop and reverse directions upon contacting a rigid
object or when the secondary entrapment device is activated.
12. After all adjustments have been made to the sensitivity (current sense) circuit, secondary
entrapment devices and all other external devices installed, the safety devices must be
checked again. Failure to adjust and retest the gate operator can increase the risk of injury
or death.
13. Verify that the emergency release (manual release) pin can be easily removed.
14. KEEP GATES PROPERLY MAINTAINED. Tighten all bolts and grease hinges and pivot points.
15. THE ENTRANCE IS TO BE USED BY VEHICLES ONLY. Pedestrians must use a separate
entrance.
16. All safety features required by UL 325 are incorporated in the capabilities of all USAutomatic
Control boards and should be utilized, including but not limited to, safety edges, photo
electric eyes, reverse sensing.
17. Test the current sense feature and all safety devices regularly to insure correct operation.
18. The USAutomatic battery charger is designed to operate with a recommended +12 VDC,
sealed maintenance free type Group U-1 battery. 30 amp hour minimum.
19. All control stations should be located at least 6 feet from any moving part of the gate
or operator.
20. Do not ever install any control device where a user will be tempted to reach through the gate
or fence to activate a gate.
21. Do not attempt to completely seal the control box. Battery needs some air ow.
22. SAVE THESE INSTRUCTIONS!!
5
Universal Actuator
Bracket
Part#610400
1 per
Square Post Flush
Mount Bracket
Part#610402
1 per
Round Post Flush
Mount Bracket
Part#610404
1 per
Actuator Bracket
Part#610406
1 per
Gate Bracket
Part#610105
1 per
Gate Support
Bracket
Part#610120
2 per
Bronze Bushing
Part#610530
2 per
Manual release pin
Part#610534
1 per
Manual release clip
Part#610535
1 per
Plug N Go
Harness
Part#630040
1 per
1/2” Cable Gland
Part#620022
1 per
Entrapment
Siren
Part#530015
1 per
Safety Sign
Part#601027
2 per
Transmitter
Part#030210
2 per
Transformer
Part#520008
1 per
Charge Controller
Part#520007
1 per (Installed)
LCR Receiver
Part#030200
1 per (Installed)
SENTRY 300 Series partnumber020320
PARTS INVENTORY
Linear Actuator
Part#510300
1 per
Instructional DVD
1 per
Control Board
Part#500410
1 per (Installed)
Charge Controller
LCR Receiver
6
Transmitter
Part#030210
2 per
Transformer
Part#520008
1 per
Charge Controller
Part#520007
1 per (Installed)
LCR Receiver
Part#030200
1 per (Installed)
Control Board
Part#500410
1 per (Installed)
Charge Controller
LCR Receiver
3/8 x 16 nylon lock nut
Part#610518
5 per
1/4 x 20 nylon lock nut
Part#610526
2 per
3/8 USS at washer
Part#610514
6 per
3/8 SAE at washer
Part#610516
2 per
1/4 SAE at washer
Part#610524
4 per
Nylon washer
Part#610528
2per
3/8 x 2 1/2” shoulder bolt
Part#610512
3per
3/8 x 16 x 8” carriage bolt
Part#610510
2per
Tap bolt
1/4 x 20 x 3 1/2”
Part#610522
2per
Tap bolt
1/4 x 20 x 2 1/2”
Part#610520
2per
#12 x 1 1/4 self tap hex screw
Part # 610532
4 per
GENERAL TOOL REQUIREMENTS
Tools required for most installations:
 •Wrenches–7/16,9/16and10mm •Sockets7/16,3/8and5/16
•Drill •Drillbits1/4and3/8inch
•Drilladapterforsocketattachment •Pliers
•Hacksaw •Levelandtapemeasure
Weldingistherecommendedmethodofsecuringthelinearactuatormountstothegateandhingepost.
Boltonbracketsareprovidedandareacceptablebutmayrequirefrequentservicetokeeptight.They
mustbeverysecurelyattached(i.e.carriageboltswithlocknutsandwashers).Lagtypeboltsarenot
recommended.Looseorunstablelinearactuatormountswillresultinimproperoperation.
IMPORTANT CAUTIONS:
1. Donotperformanyweldingwiththeactuatorcablepluggedintothecontrolboardorthebattery
connected.Seriousdamagetothecontrolboardand/orbatterymayoccurifattempted.
2. Usecontrolboxasatemplatetodeterminemountingscrewlocationsandthenattachscrews
andslideoncontrolbox.Donotattempttoholdcontrolboxanddrillmountingholes.Thiscould
damagethepreinstalledcomponents.
3. AlwaysdisconnectthebatterypowerfromthecontrolboardusingthePlugNGoharnesspriorto
wiringanydevicestothecontrolboard.
HARDWARE INVENTORY
7
GATE QUALIFICATIONS/APPLICATIONS
TheSentrygateopenerisdesignedandratedforvehicularclassI,II,IIIorIVswinggatesupto20
feetinlength.Maximumgateloadnottoexceed400poundsand20feetinlength.
TheSentryGateOpenerisrecommendedforGatesthatmeetthefollowingdescriptions:
TheSentrygateopenerisdesignedandsuppliedwithuniversalmountingbracketstotmosttypes
ofgateinstallations.Hingepostfrom23/8”to6”roundorsquarecanbeusedwiththeincluded
universalmountinghardware.
Chain Link Gate
16feetmaxlength
Maxweight350lbs.
Farm Gate
20feetmaxlength
Maxweight300lbs.
Ranch Gate
14feetmaxlength
Maxweight400lbs.
Ornamental Iron
12feetmaxlength
Maxweight400lbs.
PROPER GATE DESIGN
IMPORTANT- A GATE OPENER CANNOT OVERCOME A POORLY DESIGNED GATE.
Since the gate is a major component of the system, great care and concern must be given to
the gate design. USAutomatic,LTDisnotresponsibleforanydamagetoagateinwhichthegate
openerisinstalled.Apoorlyinstalledormisadjustedgatecouldbedamaged.Itistheresponsibility
oftheinstallertoverifypropergateinstallationpriortoopenerinstallation. Asageneralrule,agate,
whichistobeautomaticallyoperated,mustbestrongerandsmootherthanoneoperatedmanually.
• Doesthegateswingsmoothlywithoutbindsorexcessiveresistance?
• Swinggatesshouldswinglevelandplumbtopreventtheopenerfromhaving
toliftthegateopenorclosed.
• Swinggatesshouldnotrequireawheeltosupportthem.Wheelscreatedrag,
whichwillcauseopenerproblems.Awheelisgenerallyasignofaweakhinge
systemoraweakgateframe.
• Isthegateframeofsubstantialstrengthwithoutexcessiveweight?
• Willtheframewithstandnormalwindloadconditionswithoutswayorvibration?
• Willthegateclosecorrectlywithoutbeinghand-guidedorliftedtoclose?
• Arethehingessuitedforanautomaticgateopener?Werecommendbearing
typehingestoreducefrictiondrag.
• Willareinforcementbraceberequiredtoattachthelinearactuatortothegate
ordoesasuitablecrossmemberexistinthegatedesign?
If any of these problems exist, they must be corrected to achieve a reliable automatic gate system.
8
Sentryinstalledandshownintheextendedposition.
Actuatormustbeinstalledlevelandattachedtoahorizontalcrossmemberasshown.
Mounting Site Review
Review the following items prior to installation and predetermine the solution to any
problems which may exist:
• Doessufcientspaceexistformountingandfutureservicingoftheopenerandcontrolbox?
• Whichdirectionwillthegateswing?
• Willthegateopenerpullthegateopentotheinside(PulltoOpen)?
• Willthegateopenerpushthegateopentotheoutside(PushtoOpen)?
• Wherewilltheuniversalactuatorbracketandgatebracketbesecuredatthehingepostand
tothegate?
• Wherewillthecontrolboxbemountedtosupporttheweightofthebatteryandcanitbe
locatedwithin8feettopreventsplicingoftheactuatorcable?
• Howwillyouchargethebattery?WillitbeACorSolarcharged?
• Howfarawayisthe110VACreceptaclesforthetransformer?Transformerissupplied
with12feetofcable,ifextensionisneededuseSentryChargeCableExtensionKit(part
#630050).SeeAppendixB(pg42)forextensioncablekitinformationandrecommended
wiresizechartforextensiondistanceneeded.
• Ifsolarcharged,wherewillthesolarpanelbelocatedsothatoptimumsunlightisreceived?
Solarpanelinmostcasesneedstofaceasouthwestdirection.Solarpanelcomeswith15’
ofcable.Ifmoreisneeded,useSentryChargeCableExtensionKit(part#630050).
• Howwillaccessorycontrolwiring,ifany,bebroughttothecontrolbox?Knockoutsare
providedincontrolboxbottomforconduit.
• Haveallsafetyconcernsbeenaddressed?(SeeSafetySectionpg.3-4)
Gate Bracket
Universal
Actuator
Bracket
Linear Actuator
Installed Level
Horizontal Gate
Section
1
INSTALLATION
9
Determine Proper Brackets and Opening Method
Mounting Brackets
Determining which of the brackets will be needed for your installation.
TheSentrygateopenerissuppliedwithuniversalbracketstomountonround
orsquarehingepostranginginsizefrom23/8”to6”.Somepiecesmaynotbe
needed for your installation.
Thehingepostisthepostyourgatehingesareattachedto.Followthe
stepsbelowtoidentifywhichoftheincludedbracketswillbeneededforyour
installation.
Is the hinge post round or square?
Squarepostwillusethe“squarepostushmountbracket”
Roundpostwillusethe“roundpostushmountbracket”
NOTE:Ifaroundpostistobeuseditmightbenecessarytobracethepostso
thatitdoesnotrotate.Aroundpostsimplyinstalledinconcretewillrotate,if
possibledrillholesthroughthepostandinsertrebarthroughthepostpriorto
concretetopreventrotation.
Is the gate a light weight farm gate?
Ifso,usethe“gatesupportbrackets”toattachthegatebracketsothatthe
boltscanbesecurelytightened.
Universal Actuator Bracket
Theuniversalactuatorbracketcanbeinstalledinmanydifferentwaysto
accommodateyourgateopenerinstallation.Usetheimagesbelowtohelp
understandthemountingoptionsforthisbracketanddeterminetheinstallation
methodyouaregoingtouse.Theimagesareforreferenceonlyandyourinstallationmightdiffer.
Universalactuatorbracketmustbesecurelyinstalled.Drillingthroughthepostisthestrongest
method.Itisalsorecommendedthatthesquarepostushmountbracketortheroundpostush
mountbracketbeinstalledforstrengthonoppositesideofpostfromtheuniversalbracket(see
guresbelow).
Whendeterminingwheretheuniversalactuatorbracketwillmountonthehingepostyoumustalso
considerwherethegatebracketisgoingtoconnecttothegate.Thegatebracketisgoingtoattach
approximately34”outonthegatemeasuredfromthegatehingecenter.
Onceuniversalactuatorbracketlocationisdetermined,verifythatthegatebracketcanbeinstalledto
thegatesothatlinearactuatorislevel.
Square
Post
Bracket
Round
Post
Bracket
Universal
Actuator
Bracket
Gate
Support
Bracket
2
10
Pull to Open Installation
Thisinstallationmethodisthemostcommonwherethegateswingsintotheproperty/driveway.
Nomatterwhichwayyoudecidetoinstalltheactuatorbracketanduniversalactuatorbracketthe
pivotpointbelowmustbelocatedinapproximatelythispositionforapulltoopeninstallation.
Push to Open Installation
Thisinstallationmethodiscommon
wherethedrivewayslopesupentering
thepropertyandgatemustswing
outtoavoidinterference.Thistypeof
installationplacestheactuatorbracket
andlinearactuatorintothedrivearea
slightly.Anotherinstallationmethod
wouldbetoinstallasaPulltoOpen
andplacelinearactuatoronoutside
ofproperty.
Pushtoopeninstallationcanbe
achievedbyinstallinguniversalactuator
bracketandactuatorbracketasshownin
gurebelow.Dimensionsforthisinstall
methodare7”and4”fromhingecenter.
Universalactuatorbracketholepatternallowsfortheactuatorbrackettobeinstalledasshowninthis
locationonly.Establishenoughoffsetintherearactuatorpivotpointtoallowthegatetoclosefrom
theopenposition.
IMPORTANT: If Installation is Push to Open, control switch #2 “operating direction reverse”
must be turned “ON”.
NOTE: Pull to Open & Push to Open Dimensions are measured from the gate hinge center
(pivot point).
GateHingeCenter
(pivot point)
11
Attach Universal Actuator Bracket to hinge post or post being used
Mounting hardware needed:
• two3/8”x16x8”carriagebolts
• two3/8”USSatwashers
• two3/8”nylonlocknuts
Theuniversalactuatorbracketcanbeinstalledinmanydifferentways
toaccommodateyourgateopenerinstallation.Thepicturesherearefor
referenceandyourinstallationmightdiffer.
Universalactuatorbracketmustbesecurelyinstalled.Drillingthroughthe
postisthestrongestmethod.
NOTE: In all cases, the universal actuator bracket should be aligned
level with a horizontal gate section.
1. AttachUniversalActuatorBracketwithassociatedbracket(roundor
squarepostmount)aspreviouslydeterminedtoworkbestwithyour
openingmethod.Itisrecommendedthatthesquarepostushmount
bracketortheroundpostushmountbracketbeinstalledforstrength
onoppositesideofpostfromtheuniversalbracket.
2. Installwithcarriagebolts,locknutsandwashers.
3. Tightennutssecurely.
Weldingistherecommendedmethodofsecuringthelinearactuatormountstothegateandhinge
post.Boltonbracketsareprovidedandareacceptablebutmayrequirefrequentservicetokeep
tight.Theymustbeverysecurelyattached(i.e.carriageboltswithlocknutsandwashers).Lag
typeboltsarenotrecommended.Looseorunstablelinearactuatormountswillresultinimproper
operation.
3
IMPORTANT CAUTIONS:
1. Donotperformanyweldingwiththeactuatorcablepluggedintothecontrolboardorthebattery
connected.Seriousdamagetothecontrolboardand/orbatterymayoccurifattempted.
2. Usecontrolboxasatemplatetodeterminemountingscrewlocationsandthenattachscrews
andslideoncontrolbox.Donotattempttoholdcontrolboxanddrillmountingholes.Thiscould
damagethepreinstalledcomponents.
3. AlwaysdisconnectthebatterypowerfromthecontrolboardusingthePlugNGoharnesspriorto
wiringanydevicestothecontrolboard.
12
Attach Actuator Bracket to Universal Actuator Bracket
Theactuatorbrackethasa3/8”predrilledholethatthelinearactuatorwill
mountto.Thisisthepivotpointforthelinearactuator.Inallcases,the
universalactuatorbracketshouldbealignedlevelwithahorizontalgate
section.(seeMountingSiteReview)
For a Pull to Open installation - thepre-drilledholemustbelocated5”
behindthegatehingeand8”totheinsideoftheproperty.
For a Push to Open installation - thepre-drilledholemustbelocated7”in
frontofthegatehingeand4”tothedrivesideofthehinge.
Thesedimensionsaremeasuredfromthecenterofthegatehinge(pivotpoint).
Hardware needed:
• two3/8”x21/2”shoulderbolts
• two3/8”USSatwashers
• two3/8nylonlocknuts.
1. Attachactuatorbrackettouniversalactuatorbracket.
2. Verifythatactuatorbracketpivotholedimensionislocatedinthe
correctpositionseepage10fordimensions.
3. Tightenboltssecurely.
Install Linear Actuator to Actuator Bracket
Theactuatorcanbemountedintwodifferentpositionsasshown.Installingthe
actuatoronitssidecanallowforhidingitbehindacrossmemberinthegateframe.Thegatesbelow
areshownintheclosedposition.
1. Installnylonwashersandbronzebushingsintorearoflinearactuator.
2. Installthelinearactuatorintoactuatorbracket
3. Securethelinearactuatorinplaceusing3/8x21/2”shoulderboltand
two3/8SAEwashers.
4. Use3/8nylonlocknuttosecure,tightenrmly.
Actuator should swing freely, DO NOT OVER TIGHTEN!
CAUTION:Ifmountingactuatoronitsside,ensureactuatorcasedoes
notcomeincontactwithanyobjects.Mountasshownsothatwidepart
ofmotorcaseandcableisawayfromgate.
4
5
Actuator
Bracket
Pivot
Point
Predrilled
Hole
13
Install Gate Bracket to Linear Actuator
Installmanualreleasepin,gatebracketandmanual
releasecliptolinearactuatorextensionrodend.
Install Gate Bracket to Gate (Pull to Open Only)
To determine where the gate bracket will be installed follow these steps: The linear actuator
should be connected to the actuator bracket at this point. NOTE - The linear actuator was shipped
from the factory set to the fully retracted position.
1. Swinggatetothefullyopenposition.
2. Nowopengateanothercoupleofinches(thegatewillneveropen
morethanthisposition).Thegatecanbeadjustedlatertoopena
little less if needed.
3. Swinglinearactuatoraround(shouldswingfreely)inalevelposition
tomeetthefullyopengate.Thisiswhereyoushouldinstallthegate
bracketonthegate.
4. Markthelocationofthe1/4”holesforthemountingbracket.(see gure)
5. Removepinandclipfrombracket.
6. Attachbrackettogate(ifusingalightweighttubularfarmgateusegate
supportbracketforsupport).Usethe1/4”x21/2”or31/4”tapbolts
dependingongatethickness,four1/4”atwashersandtwo1/4”nylon
locknuts.Tightensecurely.
7. Attachactuatortothenowsecuredgatebracketusingmanualreleasepin
andclip.
8. Thegateshouldnowbefullyopenedwiththeactuatorattached.
9. Verifythatlinearactuatorislevelandallpieceshavebeen
installedcorrectly.
Installing Gate Bracket to Gate for Push to Open configuration
ProcedureisidenticaltothestepsforPulltoOpenexceptthegatewillbeinthefullyclosedposition.
Forapushtoopenconguration,youwillneedtoreversetheoperatingdirectionforthegateonthe
controlboard.
Preparing Sentry Control Box
for Installation
Thecontrolboxhastwoholesinthebottomofthebox
providingaccesstothewirecompartment.Thelargehole
isfortheactuatorcableandthesmallerholeisforthe
chargedevicecable.
Installtheprovidedcableglandintothesmall
hole as shown here.
Cable
Gland
6
7
8
14
Install Sentry Control Box
Thecontrolboxshouldbeinstalledinalocationthatwillnotrequire
theeightfootlinearactuatorcabletobespliced.Ifthecablemustbe
spliced,refertothesplicinginstructionsbelow.Themostcommon
locationwouldbeonafenceorwalladjacenttoyourgate.Avoid
placingthecontrolboxbehindsolidmetalobjectsthatmightinterfere
withthereceiverreception.Theantennaforthereceiverislocated
insidethecontrolboxandthiscouldreducetheoperatingrange.
1. Usecontrolboxasatemplatetodetermineandmarkthemounting
screwlocationsusingthe4mountingholesshowningurehere.
2. DrillmountingholesforscrewsDONOTATTEMPTTO
HOLDTHECONTROLBOXINPLACEWHILEYOU
DRILLTHEMOUNTINGHOLES.Thiscoulddamage
thepreinstalledcomponents.
3. Attachthe4#12hexheadselftappingmetalscrews.
4. Mountthecontrolboxonthescrews.
Verify the structure the control box is mounted on is sufcient enough
to hold the control box and battery securely.
Splicing for Sentry 300 S Linear Actuator Cable (if needed)
TheSentrylinearactuatorcomeswith8feetofcable.Avoidsplicing
thiscableifpossible.Ifthecontrolboxmustbelocatedinsuchaway
thatsplicingisrequiredfollowtheguidelinesbelowtoavoidproblems.
Determinethelengthofadditionallinearactuatorcableneededand
eitherbuildityourselforvisitwww.sentrygateopener.comforordering
thelengthofextensioncableneeded.
1. Locatethelinearactuator8pinconnector.Measure18”from
connectorandmark.
2. Cutcableatthe18”mark.Thiswillallowenoughcabletobe
splicedandplacedinthewirecompartment.
3. Bringextensioncableintocontrolboxandsplice5wiresusingwirenuts.
4. Useapprovedweathertightelectricaljunctionboxforthesplicelocatedoutsidethecontrolbox.
5. Conduitshouldbeusedbetweenjunctionboxandcontrolbox.Controlboxknockoutisfor
1/2”conduit.
6. Theextensioncablemustconsistof5wires,2fourteengaugewiresand3eighteengaugewires.
•Redwirewithwhitestripe–14gauge(distanceaddedisgreaterthan50feetuse12gauge)
•Blackwirewithwhitestripe–14gauge(distanceaddedisgreaterthan50feetuse12gauge)
•Orangewire–18gauge(distanceaddedisgreaterthan50feetuse16gauge)
•Greenwire–18gauge(distanceaddedisgreaterthan50feetuse16gauge)
•Whitewire–18gauge(distanceaddedisgreaterthan50feetuse16gauge)
7. Withextensioncablenowinthejunctionboxstripandpreparetosplicetolinearactuatorcable.
8. Routelinearactuatorcableintojunctionboxandspliceusingwirenuts.
NOTE: Cable splice must be water tight to keep moisture away from splices and prevent problems
Mounting Holes 4 Places
9
14.25”
17.7”
11.7”
14.5”
15
Sentry Plug N Go Harness
ThePlugNGoHarnesscomespreinstalledandshouldbeplugged
intothebottomofthechargecontroller.Plugiscolorcoded.Red
connectstopositivebatterypostandBlackconnectstonegative
batterypost.Onceconnected,placeharnessintowirecompartmentto
prepareforbatteryinstallation.
Install Battery
BATTERY REQUIRED FOR OPERATION (Battery not included)
Recommendedbatterytype-12-volt,GroupU-1;sealed
(maintenancefree);30amphourminimum.Thisbatteryis
sometimesdescribedasanon-spillablelawntractorbattery.Battery
physicalsizemustnotexceed9”wide,7”talland53/4”deep.
ThePlugNGoharnesshastwo1/4”ringterminalstoconnectto
bolttypebatterypost.
CAUTION-Donotinstallwetcellbatteryintocontrolbox;thistype
ofbatteryusuallyhasremovablecapsusedforserviceandwillvent
corrosivefumesintocontrolbox.
1.Installthebatteryintothebatterycompartment.
2.ConnectOringterminalsfromharnesstothebattery.
NOTE: Redwiretopositivepostofbattery
Blackwiretonegativepostofbattery
3.Tightentheboltssecurely(boltsshouldbesuppliedwiththebattery).
1/4” Ring terminal for battery
Red connects to positive battery post
Black connects to negative battery post
Charge controller connector
Gate 1 and Gate 2 linear
actuator power plugs
10
11
16
Install Charging System - AC or Solar
For AC Charge Option - Install Transformer
Supplied with opener
TheUSAutomatictransformer(PN520008)suppliedisalowvoltage
ULapprovedtransformerforthistypeofapplication.Thetransformeris
equippedwithaDCplugforeasyconnectiontothechargecontrollerand
caneasilyprovide575cyclesofoperationadaywithoutdecreasingthe
batterycharge.IntheeventACpowergoesouttheopenerwilloperate
forweeksonthebattery(ifcyclesperdayarebelow20)beforeneeding
service.Accessoriesconnectedtotheopenerarecritical.AlwaysuseSolar
Friendlyaccessoriestohelpavoidprematurebatteryfailureincasesof
poweroutages.TRANSFORMER MUST NOT GET WET.
1. Loosencableglandnutandroutethecablefromthechargedeviceinto
thecontrolbox(seegure).EnsurethatDCplugcanreachthecharge
controller“PowerIn”connector.
2. Tightencableglandnuttoholdcableinplace.
3. Connectthetransformertoanapprovedelectricalreceptacle.
NOTE: The 110 VAC receptacles should be installed by a qualied
electrician, per local building codes.
Ifreplacementbecomesnecessaryvisitwww.sentrygateopener.comtoorder,partnumber520008.
Failuretousethepropertransformercandamagethechargecontroller.
For Solar Charge Option - Install the Solar Panel
Optional Solar Panel Kit Part Number 520015 - not included
Thelocationofthesolarpaneliscriticalforproperbatterycharging.ThepanelneedstofaceaSouth
toSouthwestdirectionandbeinstalledattheangleofthesuppliedsolarpanelbracket.Forproper
operationthepanelmusthaveunobstructedsun.TheSolarPanelneedstobemountedsothatit
receivesfullsunlight.EvenasmallamountofshadeorblockagewillcausetheSolarPaneltocease
charging.SomethingastinyasangertipshadowwillaffecttheSolarPanel.
Optimizing Solar Panel Location
Thechargecontrollersensesthechargemethodinstalled(ACorSolar)
andchargesthebatteryattheoptimumchargerate.Thesolarpanel
outputsvoltageandcurrenttochargethebattery.Thisoutputvoltage
willvaryslightlyasthesunpassesoverthroughouttheday.Thecharge
controllercanbeusedtooptimizethisoutputvoltage.
• Tousethisfeatureidentifytimeofdayforthemaximumsolar
radiation(typicallyaround2pm).
• Facethepaneltowardthesunandobservethe“ExternalPower”
lightonthechargecontroller,adjustthepaneluntillightcomeson
andsecureinthatposition.
NOTE:Dependingonthetimeofyearandyourexactlocationtheoutputvoltagerequiredto
illuminate“ExternalPower”lightmaynotbepossible.Thisdoesnotindicateaproblem.Inthiscase
setpaneltofaceaSouthwestpositionandverify“SolarPower”lightison.Batteryisbeingcharged.
For additional information regarding Solar Charging, see Appendix A of this manual.
12
Cable Gland
17
Connect Charge Device to Charge Controller
(TransformerorSolarPanelKit)
TheSentrygateopenerchargecontrolleracceptsinputsfrom
eitherthesuppliedACtransformerortheoptionalsolarpanel.
ThetransformerandsolarpanelcomewithaDCplugforeasy
installation.Oncethechargedeviceisselectedandinstalled
connecttheDCplugintothechargecontroller“PowerIn”located
intheupperrightcornerofthechargecontroller.
If charge device cable needs to be extended to reach the
charge controller see appendix B of this manual.
Charge Controller Operation Check
Oncethechargedeviceispluggedintothechargecontrollerverifythefollowing:
Transformer:
1. Chargelightashesfor3secondsandgoesoff
2. Externalpoweranddetectionlightscomeon
3. Detectionlightstaysonfor3seconds,thencharginglightcomeson
Solar Panel:
1. Chargelightashesfor3secondsandgoesoff
2. Solarpoweranddetectionlightscomeon
3. Detectionlightstaysonfor3seconds,thencharginglightcomeson
IfExternalPowerorSolarPowerLEDisonandtheDetectionLEDison,thebatteryisnotconnected
tothecharger.VerifyRed/Blackconnectorsarepluggedintothebottomofthechargerasshown
above.
NOTE: Most batteries will not be completely charged when rst connected and the charging
light should come on when charge controller is rst connected. The fully charged light will
come on once battery is fully charged.
Whenusingasolarpanel,thechargecontrollerisdesignedtoonlychargethebatterywhenthere
isenoughsuntodoso.Ifthereisnosun,thelightsonthechargecontrollershouldbe“OFF”.This
featurereducesthedrainonthebatteryinsolarinstallations.Iftransformerisinstalledlightsare
operationalallthetime.
Charge Device
plugs in here
13
14
18
Install Linear Actuator Cable
Withthecontrolboxinstalledroutethelinearactuatorcableintothebottomofthecontrolboxusing
the11/4”holeintherearbottom.Slidetheholeplugthatisinstalledonthelinearactuatorcableinto
thecontrolboxholeandsnapinplace.
Ifcablelengthisexcessive,coilupandplaceinthewirecompartmentofcontrolbox.
EnsurethelengthallowsforconnectiontotheSentrycontrolboardGate1connector.
Sentry Plug N Go Harness Final Installation
At this point verify the following items have been completed:
3 Linearactuatorinstallationiscomplete.
3 Controlboxissecurelyinstalled.
3 PlugNGoharnessisconnectedtothechargecontroller.
3 PlugNGoharnessisconnectedtothebattery.
3 Batteryisinstalledinthebatterycompartmentofcontrolbox.
3 Chargedevicecableisroutedintocontrolboxandconnectedtothechargecontroller.
3 Linearactuatorcableisroutedintocontrolbox.
Verify the above items have been completed correctly before continuing. If necessary, correct
before proceeding. If completed, procede with the following steps:
1. Locatethepowerconnectorattachedtothelinearactuatorcable(redandblackwires).
2. ConnectittooneofthePlugNGoharnesslinearactuatorpowerplugs.Theseconnectorsare
designedsothatincorrectconnectionisnotpossibleanditdoesnotmatterwhichconnectoris
used.
3. Locatethelinearactuatorcable8pinplug.
4. ConnectittotheGate1connectorlocatedontheSentryControlboard.
5. Securelysnapinplace.
6. Onceallconnectionsaremadeplacewiresinwirecompartment.
NOTE: In case of an emergency,theGate1orGate2connectorcanberemovedatanytimefrom
controlboardtostopgatefrommoving.
This completes all cable connections and cable routing into
the control box.
15
16
19
Sentry Control Board Information
TheSentrycontrolboardiscapableofoperatingtwogates.Ifyourinstallationisasinglegateyoucan
operatethegateontheGate1orGate2connector.Setcontrolswitch“ON”fortheconnectorbeing
used.TheSentrygateopenerwasshippedwiththereceiverandentrapmentsirenalreadyconnected
tothecontrolboard;theseconnectionsareplugsthatcaneasilybedisconnected.
Sensitivity Adjustments and Entrapment Alarm
Gate1andGate2sensitivityadjustmentsarelocatedontheleftedge
ofthecontrolboard.
Sensitivityistheprimarysafetycontroldesignedintothecontrolboard.
Theadjustmentdialscontroltheamountofforcethegatecanapply
toanobjectbeforethegatewillstopandreversedirection.Ifthegate
sensesanobstructionitwillreversedirection.Ifitsensesasecond
obstructionbeforereachingthefullyopenorclosedpositionthegate
willshutdown.Theentrapmentalarmwhichispreinstalledinthe
controlboxwillsound.
Entrapmentalarmwillcontinue
for 5 minutes then shut off. The
entrapmentalarmcanberesetby
pressingthe“Reset”buttononthe
controlboard.
Iftwoobstructionsweredetected
andcontrolboardhasshutdown,
the“Reset”buttonwillhavetobe
pressedtore-activatetheopener.
17
Sensitivity Adjustments
Sentry Control Board
Reset Button
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48

USAutomatic SENTRY 300 S Installation guide

Category
Garage Door Opener
Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI