Installation S19-110BF
5/29/2012
Installation
Supplies Required:
• (3)
3/8"flooranchorsandbolts
• Teflon
tapeandpipesealant
• Pipingto1-1/4"NPTwatersupplyinletonunit
•Adequatesupplypipesupports
• Min.4"draintoaccommodate30gallonsperminute
dischargeforshowerwaste
• OPTIONAL:sign-mountinghardware
Step 1: Secure base to floor
1. Installthreesuitableanchors(suppliedbyinstaller)
f
or3/8"boltsinthefloor.
2. Boltthebasetotheflooranchorsusing3/8"bolts
(supplied by installer).
Step 2: Assemble components
1. Assembletheremainingunitcomponentsas
sho
wnon
page4.
•Applypipesealant(byinstaller)toallmale-
threadedpipejoints.
•Usetherubbergrippadprovidedorastrap
wrencharoundpipeswhentighteningtoprevent
marring.Placethegrippadonthepipe,then
putthewrenchoverthegrippadandturnthe
pipewiththewrench.
•Bottomedgeofshowerheadshouldbe7'-0"
(2134mm) from floor.
Step 3: Connect water supply
IMPOR
TANT
: Do not rely on Bradley’s
Combination Unit to support supply piping.
1. Connectwatersupplypipingto1-1/4"NPTinlet
onunit(pipingbyinstaller).Provideadequate
supports(byinstaller)forsupplypipeusingpipe
hangersorothermeans.
2. Hangthesafetysignfromtheunitwiththecurtain
hooksprovided(ormountittothewallusingsign-
mountinghardwarebyinstaller).
NOTE: All dimensions assume standard thread
engag
ement. Variations in manufacturing allow for
+/- 1/8" (3mm) per threaded joint. To find the tolerance
of a dimension, add the number of thread joints in
between a dimension and multiply it by 1/8" (3mm).
33-3/8"
(847mm)
4-1/2"
(114mm)
3.1"
(78.7mm)
45"
(1142mm)
9"
(229mm)
42"
(1067mm)
to Floor
7'1"
(2159mm)
to Floor
Ø 9" (229mm) Flange
with (3) Ø 3/8" (10mm)
Holes on Ø 8" (203mm)
Bolt Circle