Zenna Home 6360yBLK Installation guide

Category
Wall & ceiling mounts accessories
Type
Installation guide

This manual is also suitable for

Please Read All Installation Tips On Next Page Before Beginning.
Standard Installation:
B
A
A
1. Line up finial bracket A at top left side of
molding. Screw the finial bracket in the wall
using a drill. Repeat with finial bracket B on
top right side of molding.
2. With window curtains on the rod, screw the
thicker tube into finial bracket A. Extend the
rods to the right to screw thinnest tube into
finial bracket B.
IF YOU NEED MORE LENGTH, unlock
middle tube as indicated on directional
sticker and extend.
(DO NOT EXTEND BEYOND THE YELLOW
‘STOP!’ LINE.)
3. While holding the thickest tube, twist the
middle tube away from you to lock it into
place (as indicated by directional sticker).
Twist until tight.
Installation Complete!
Hold
Twist away
to lock
Before Installation: Unscrew rods from end finial brackets A and B.
Space curtains until desired look is achieved.
Wood/MoldingDrywall
For drilling into
Drywall, pre-drill a
3/16 in. (0.47 cm)
hole and install
screws using the
included Plastic
Drywall Anchors.
Finial
Bracket
A
Finial
Bracket
B
Easy Install Drapery Rod Instructions
For safety, please use a step ladder.
x 6-8 x 6-8
You will need: Components included:
drill pencil
Finial
Bracket
A
Finial
Bracket
B
A B
Finial Bracket
A
Finial Bracket
B
Finial
Bracket
A
Finial
Bracket
B
B
A
Finial
Bracket
A
Finial
Bracket
B
Twist to screw
Twist to screw
Extend
To view an instructional video, visit:
http://maytex.com/easyinstall.php
If you want to hang the rod at a different height or
projection, see the next page.
Because of the position of the brackets relative to
the window, you will usually be screwing into a
wooden stud and will not need the plastic anchors.
screwdriver anchors screws
B
To Hang Above Your Window:
If There Is Not Enough Space Between Window Opening And Wall:
To Adjust The Projection:
If Window Opening is 55in or Wider:
Using the included guide, mark the drilling
location for the two screws on each finial
bracket. Finial bracket A should be on your left
as you face the window. Secure finial brackets
with screws to wall using a drill.
Using a screwdriver, loosen the 2 screws on the
inside of the finial bracket (Do not remove screws).
Slide finial bracket to desired projection and
retighten screws fully. Repeat for other finial bracket.
1
2
3
4
5
6
7
1
2
3
4
5
6
7
Right
Corner
Left
Corner
InchesInches
Guide for making sure
brackets are level
When installing, if there is not enough space
between opening and wall, mount brackets above
window opening. Use the bottom of bracket
for alignment.
55 in (140 cm)
or wider
Center
Support
Installation Tips For Easy Install Drapery Rod
If your window opening is 55 in (140 cm) or
wider, it is recommended that the included
center rod support is used.
When installing the center support bracket, the
bottom edge of the center support bracket will
align with the top edge of the finial bracket.
before after
CENTER OF
WINDOW
EDGE OF
WINDOW
  • Page 1 1
  • Page 2 2

Zenna Home 6360yBLK Installation guide

Category
Wall & ceiling mounts accessories
Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI