Elrene 100154CRDX028X048ANB Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Elrene 100154CRDX028X048ANB Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
ROD SETS
INSTALLATION INSTRUCTIONS
NOTE: Finial shown is for illustration purposes only.
It may not represent the style of finial purchased.
STEP 1:
If screws are going directly into wood trim or wall studs, drill a 1/8" pilot
hole at pencil marks. If screwing into drywall, follow instructions on
enclosed sheet.
STEP 3:
Assemble rod and slide drapery treatment
onto rod.
Place brackets against wall at desired locations.
Mark screw holes with pencil. Be sure marks are
level across opening.
STEP 4:
Screw finials onto rod. Rotate finial on rod for proper
alignment if required.
STEP 5:
Extend rod to desired width. Lift rod with drapery
and drop into brackets. Adjust draperies to
desired position.
STEP 6:
Lock rods into position by tightening leveling
screw by hand until finger tight. This will prevent
the rod from moving.
Drapery
STEP 2:
/