C20

FSP C20 User manual

  • Hello! I've reviewed the user manual for the FSP C20 Battery Cabinet. This document outlines the specifications, assembly process, and important notes for this product. I understand that this is a cabinet only, and does not include batteries, breakers or cables. It contains four layers for battery placement. I'm ready to answer any questions you may have about the C20 and its usage.
  • What are the dimensions of the C20 battery cabinet?
    What is the weight of the C20 battery cabinet?
    What is included in the C20 battery cabinet?
    How many layers does the C20 battery cabinet have?
Fortron Source (Europa) GmbH
Carl-Friedrich-Benz-Straße 13, 47877 Willich, GERMANY
Tel: +49 2154 894 012-0
POWER NEVER ENDS
User Manual
C20 Empty Battery Cabinet
Fortron Source (Europa) GmbH
Carl-Friedrich-Benz-Straße 13, 47877 Willich, GERMANY
Tel: +49 2154 894 012-0
POWER NEVER ENDS
C20 Spec & Installation Guidance
Dimension: 950 x 470 x 1190 (mm)
Weight: 45kg
Content: Empty battery cabinet, no breaker, no cable
Battery Capacity
Battery Quantity
100Ah
20pcs
65Ah
20pcs
38Ah
40pcs
24Ah
40pcs
Battery cabinet assembly for C-20
1. Taking out front & back
board, then set the load
bar to the bottom iron
frame from top to down
with one or two more
bars.
5. Follow the same
way to assemble
batteries in the
third and forth
layers
respectively.
2. Fixing left and right
boards.
6. Setting right and
left board in the
way of step 2.
3. Put the batteries in this
first layer.
Note: keep tidy to avoid
blocking the lateral
boards slot.
7. Put top cover
with top board to
complete
assembly.
4. Assemble second layer
in the same way with
left and right boards.
And then, put batteries
inside.
Note 1: Do NOT move the battery cabinet after assembly.
Note 2: Battery cabinet C-20 contains four layers with double carton packing.
/