Gambro AK 95 User manual

Type
User manual

This manual is also suitable for

AK 95 / AK 95 S
Service Manual
A better way to better care
AK 95 / AK 95 S - Service manual
Contents:
Chapter 1 Installation guide
Chapter 2 Technical description
Chapter 3 Technical data
Chapter 4 Service technician’s guide
Chapter 5 Maintenance manual
Chapter 6 Calibrations
Chapter 7 Spare parts list
Chapter 8 Cable survey
Chapter 9 Symbol description
Chapter 10 Replacements
Chapter 11 Electrical safety inspections
Preface
About this manual
This service manual provides the information
needed to install the AK 95 or AK 95 S
monitor and how to carry out maintenance
and calibrations.
It is a guidance how to identify and repair
faults that may occur.
All information, texts and figures, are valid
for AK 95 S. If the information is specific for
AK 95 only, it is stated in the corresponding
text.
Installation
Installation of the machine should be done in
accordance with the recommended procedures
in the Installation Guide.
When installing a new monitor kindly
remember to fill out the Installation / Out of
Box report and return it to:
Gambro Lundia AB
Monitor Division
Magistratsvägen 16
PO Box 10101
SE-220 10 Lund
Sweden
This is an important information and it will
assist us to improve the product for you. The
Out of Box system is not valid for products,
components or printed circuit boards that
isn't in its original delivered condition.
Complaint
If a complaint is raised it shall be
communicated to the relevant Gambro Sales
Company. In order for the Sales Company to
be able to determine the relevance of a
complaint, it is of vital importance that the
deviation is communicated to them as
comprehensive as the issue requires.
Complaints are important information and it
will assist Gambro to improve the product for
you. The Complaint system is not valid for
products, components or printed circuit
boards that isn't in its original delivered
condition.
Disclaimer
The manufacturer accepts responsibility for
the safety, reliability, and performance of this
equipment only if installation, operational
procedures, maintenance, calibrations, and
repairs are carried out by appropriately
trained and suitable qualified people; if all
equipment modifications are authorized in
writing by the manufacturer and carried out
by appropriately trained and suitable
qualified people; if the electrical installation
of the relevant room complies with all
applicable local electrical codes and, if
applicable, IEC requirements; and if the
equipment is used in accordance with the
published Operator’s Manual.
Maintenance
To ensure proper operation of the AK 95 /
AK 95 S, a qualified service technician must
perform a complete series of maintenance
procedures at regular intervals.
The maintenance and calibration information
that you need to use is provided in this
Service Manual.
It is mandatory to perform at least a
preventive maintenance every second year.
A yearly maintenance is recommended. The
rate of preventive maintenance might be
different due to variations of the operating
environment.
Competence of Service Engineers
There is a certain minimum level of
competence required for Service Engineers
who are to maintain and repair Gambro
products, summarized as follows.
A Service Engineer is considered suitable
qualified if he/she has:
1. Practical experience of the AK 95 S
monitor.
2. Attended AK 95 S technical service course
and has been given a certificate stating
that the technician has passed the course.
3. Access to the recommended test
equipment and special tools detailed in
this Service Manual.
4. Access to the recommended spare parts,
see section Spare Parts List.
5. Access to and understanding of the
AK 95 S Operator's Manual, HCEN9794
or AK 95 Operator's Manual, HCEN9542.
In general, this policy implies that training
will be carried out by Gambro Lundia AB:
Monitor Division, while local markets are
responsible for their own service
organization.
Repair
Parts which are sent for repair shall be sent to the
following address:
Gambro Lundia AB
Monitor Division
Workshop
Magistratsvägen 16
PO Box 10101
SE-220 10 Lund
Sweden
Technical support
For technical support please contact your local
Gambro Service representative.
Valid revision
Publication no
. Denomination
HCEN9095, Rev. 10.2006 AK 95 / AK 95 S -
Service Manual
The complete AK 95 / AK 95 S - Service Manual,
HCEN9095, consists of the following separate
chapters:
HCEN9133 Rev. 01. 2004 Installation Guide
HCEN9134 Rev. 10. 2005 Technical Description
HCEN9369 Rev. 10. 2005 Technical Data, AK 95S
HCEN9135 Rev. 10. 2005 Technical Data, AK 95
HCEN9136 Rev. 10. 2005 Service Technicians
Guide
HCEN12189 Rev. 10. 2006 Maintenance Manual
HCEN9138 Rev. 10. 2005 Calibrations
HCEN9094 Rev. 10. 2005 Spare Parts List
K16756 CO 25702 Cable Survey
HCEN9160 Rev. 10. 2005 Symbol Description
HCEN12078 Rev.10. 2005 Replacements
HCEN12190 Rev. 05. 2006 Electrical safety
inspections
All rights reserved.
© Copyright Gambro Lundia AB, Sweden, 1996
Gambro Lundia AB
Monitor Division
Box 10101
SE-220 10 Lund
Sweden
Tel: +46 46 16 90 00
Fax: +46 46 16 96 96
www.gambro.com
This page is intentionally left blank
Installation Guide
AK 95 / AK 95 S
January 2004
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
Installation Guide
1:1
1. Installation Guide
Contents
Installation
Unpacking and inspection .......................... 1:2
Environment and ........................................ 1:2
Physical Data .............................................. 1:2
Operating Environment ........................ 1:2
Transport and Storage Environment .... 1:2
Physical Data ......................................... 1:2
Mains Voltage and Power ...................... 1:3
Consumption .......................................... 1:3
Service Outlets ....................................... 1:3
Line Fuses .............................................. 1:3
Mains Water Supply .............................. 1:3
Tools............................................................. 1:3
Top Tray....................................................... 1:3
Connection to the Water Supply ................ 1:4
Connection to the Power Supply ................ 1:4
Connection of the battery ........................... 1:4
How to remove the cover to
connect the battery ..................................... 1:5
Installation of RP 95 S ................................ 1:6
Back-up battery ........................................... 1:8
Turn on the AK 95 S.................................... 1:9
Functional check - Fch............................... 1:9
Recommended start-up procedure .............. 1:9
Checklist .....................................................1:11
Note!
This installation Guide provides the information needed to
install both AK 95 and AK 95 S.
The text from this point forward only states AK 95 S.
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
1:2
Installation Guide
Figure 1. AK 95 S Units.
Ensure that the specified equipment has been
delivered. Do the packages contain the specified
monitor and options? Are there any units/
components missing? Check the additional
packing list (inside the additional package box).
If in doubt, please contact your Gambro Serv-
ice representative.
Ensure that the voltage specified on the voltage
tag matches the mains voltage. If in doubt,
please contact your Gambro Service
representative.
The AK 95 S can be installed in most environ-
ments if certain conditions as the temperature,
relative humidity, mains voltage etc. are met.
Operating Environment
AK 95 S:
Ambient temperature: +18 °C to + 35 °C
Relative humidity: 15 % - 85 %
Air pressure: 70 - 106 kPa
AK 95:
Ambient temperature: +10°C to + 35 °C
Relative humidity: 30% - 85 %
Air pressure: 70 - 106 kPa
Transport and Storage Environment
Units being transported or stored must be kept
in their original packaging. Units must be
handled en route in accordance with special
instructions. Units can be transported or stored
in the following environment for up to 15 weeks:
Ambient temperature: -20 °C to +70 °C
Relative humidity: 10 % - 96 %
Air pressure: 50 - 106 kPa
Note!Units to be transported and/or stored for
more than 15 weeks may only be subjected to
the conditions specified under Operating Envi-
ronment.
Environment and
Physical Data
Unpacking and
inspection
When unpacking, the equipment should be
checked. If the equipment is in any way dam-
aged, proper operation cannot be guaranteed.
Please contact your Gambro Service
representative.
The packages contain the units and components
shown in Figure 1.
Installation
Physical Data
AK 95 S:
Depth Width Height Weight
mm mm mm kg
Machine 600 480 1270 78
Stand 625 580 (all options
included)
AK 95:
Depth Width Height Weight
mm mm mm kg
Machine 420 350 1270 62
Stand 680 625
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
Installation Guide
1:3
A
B
Acetate
EN1075
Lift points
Lift points
Tools
The tools listed below are needed during the
installation procedure.
Tube cutter, 113 500 084
Adjustable wrench, 113 003 009
Hexagon spanner set
Screwdriver, 1,2 x 8,0 - 175mm,
113 002 006
Top Tray
To avoid leakage into the machine, the top tray
must always be placed on the top of the ma-
chine, except during technical service.
Mains Voltage and Power
Consumption
The AK 95 S must be plugged into a grounded
power point not more than 3 metres distant.
Mains voltage:
100 V(at 50 Hz or 60 Hz)
110 V(at 50 Hz or 60 Hz)
230 V(at 50 Hz or 60 Hz) (±12%)
Power consumption:
2025 W at 230 V
1575 W at 110 V
1275 W at 100 V
Service Outlets
One extra grounded power socket should be
available close to the AK 95 S, for troubleshoot-
ing and maintenance purposes.
Line Fuses
Never overload the line fuses and do not supply
too many systems via a single line fuse.
Mains Water Supply
Required quality:
Level of purity according to ASAIO and AAMI
recommended standards on feed water for
dialysis monitors.
Water for the dialysis unit has to be supplied
from a Reverse Osmosis purification system.
Pressure:
1.2 - 6 bar to the pressure regulator mounted in
the MM 95.
Note! The pressure should be measured with
the flow from the water supply.
Temperature:+5 °C to +30 °C (treatment)
Consumption in treatment:
AK 95 S: 500 ml/min
AK 95: 550 ml/min
Drain: Open type. Not more than 1.2 metres
above outlet from fluid monitor.
Note! Local ordanances may require the use of
special measures to protect against the possibil-
ity of back-siphonage from dialysis equipment
into the water supply. When installing the
AK 95 S, such ordanance should be observed.
Figure 2. AK 95 S
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
1:4
Installation Guide
Connection to the Water
Supply
The water must fulfil all requirements set out
under Environment and Physical Data.
Connection to the Power
Supply
Main switch,
ON/OFF
Mains power,
connected to a
grounded
power socket
Water in
Drain
Fuses
Connection of the Battery
The rechargeable 9V battery (100 224 006) is
used to drive the buzzer alarm during main’s
power failure. The battery is not connected at
delivery.
NOTE! The battery must be connected during
the installation according to the instruction on
next page.
A discharged battery will be charged with
maximum 10 mA and it must be charged for at
least 50 hours to get completely charged. An all-
up charged battery will receive a maintaining
current of approximately 1,5 mA. The AK 95 S
charge the battery as long as the AC/DC con-
verter is switched on, i.e. AK 95 S itself does not
need to be switched on.
The battery is tested during every functional
check to ensure that the capacity is enough in
the battery, otherwise an attention will be
given:
BATTERY FAILURE
Change battery or press SELECT
NOTE! Jumper J200 on the Protective Driver
board must be mounted for the rechargeable
battery.
If use of an alkaline non-chargeable battery,
jumper J200 must be removed, if not, the
battery will be damaged.
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
Installation Guide
1:5
A
B
Acetate
1070
A
A
How to remove the cover to connect
the battery.
1. Loosen the three cover bolts, accessible
underneath the fluid part.
2. Move the cover upwards and then back-
wards.
3. Pull the cover to the right just 10 mm (if you
are positioned in front of the AK 95 S).
4. Turn the cover backwards counter-clockwise
to pass the circuit boards and the cover can
be removed.
5. Connect the rechargeable battery to board
connector P205 on the Protective Driver
board.
A
Cover
Front
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
1:6
Installation Guide
GAMBRO
Step 2
1. Put the RP 95 S unit into the front hole
of the stand. Fasten it with the attached
spacer and screw ( M4, 16mm)
2. Fasten the screw (with black plastic
knob).
GAM
BRO
1
GAMBRO
2
3
MB
RO
4
5
6
NOTE! This instruction is for AK 95 S equipped with RP 95 S at delivery.
RP 95 S can also be ordered and installed as a kit, K23054. Refer to rebuilding instruction K23055.
Installation of RP 95 S
Step 1
1. Loosen the two screws (with
black plastic knobs) under the
service tray holder.
2. Pull out the service tray holder
to its end position.
3. Loosen the two hexagonal
socket screws.
4. Remove the service tray holder
complete.
5. Fasten the hexagonal socket
screws again.
6. Attach the plug to the rear hole
of the stand and fasten the
screw (with black plastic knob).
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
Installation Guide
1:7
G
AM
BRO
GAM
BRO
180°
90°
Step 3
1. Turn the RP 95 S 180° in counter
clockwise direction.
2. Rotate the RP 95 S 90° to be
parallel with the AK 95 S front.
2
1
Step 4
1. Fasten the cable on the right upper
part of the stand with the enclosed
cable holder and screw.
2. Fasten the cable even on the back
part of machine with the enclosed
cable holder - use an existing screw.
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
1:8
Installation Guide
Back-up Battery
The optional back-up battery is pre-assembled
under the monitor stand at delivery.
Let the machine stay with the ACDC-unit in
power on mode over night in order to charge
the batteries.
Replacement of the lead acid batteries must be
done according to following electrical diagram.
Both lead acid batteries must be changed at the
same time and only batteries approved or
supplied by Gambro Lundia AB may be used.
Changed batteries must be recycled or disposed
of properly.
Fuse: T15 A
Running time: 30 minutes
The charge indicator on the power supply is lit
when the AK 95 S is equipped with the back-up
battery. The machine must be connected to
mains voltage and the mains switch must be on.
In a mains failure situation following attention
will be given.
POWER FAILURE, BATTERY OPERATION
Battery operated for x minutes
Before the battery is empty following attention
will be given.
LOW BATTERY POWER
Machine turnes off in one minute
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
Installation Guide
1:9
Turn on the AK 95 S
The ON/OFF button on the Operators Panel is
used to turn the machine on and off.
The ON/OFF button must be pressed at least 3
sec. in order to switch the machine on and off.
The main switch on the power supply should
always be in ON position, even when the
machine is not in use. This “Stand by” mode is
indicated by a lit segment on the TIME display
on the operators panel.
If a power failure occurs when AK 95 S is work-
ing, the same segment in the TIME display is
flashing.
For further information about operating
instructions, please see:
AK 95 S Operator's Manual, HCEN 9794
or
AK 95 Operator's Manual, HCEN 9542.
Functional check - Fch
Each time the AK 95 is started, the automatic
functional check, Fch, is carried out.
The functional check will be aborted if Rinse/
Drain or any of the disinfection modes are
selected.
h.min
Time
h.min
Time
Recommended start-up
procedure
First check:
• That the 9V battery is connected.
• That the mains cable is connected to power.
• That the main switch on the rear of the
monitor is turned on.
• That the machine is connected to the water
supply.
• That the drain tube is properly connected to
the machine and placed with an air gap between
the drain tube and the drain.
• That the dialysis fluid tubes are connected to
the safety couplings.
Start the machine
1. Press the ON/OFF button for 3 seconds.
2. Perform a Heat disinfection procedure accord-
ing to the Operator’s Manual.
3. Perform a complete functional check accord-
ing to the Operator’s Manual.
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
1:10
Installation Guide
This page is intentionally left blank
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
Installation Guide
1:11
Checklist - Check if applicable
Yes
Checklist - filed by the Sevice Engi-
neer responsible for the installation.
Unpacking and inspection
Ensure that the specified equipment
has been delivered.
Check that the additional package box
contains the specified components.
Check, by visual inspection that the
machine shows no sign of damage.
Environment and Physical Data
Ensure that the Operating Environment
is according to the specifications.
Interconnection
Ensure that the monitors are intercon-
nected correctly.
Top Tray
Ensure that the top tray is placed at
the top of the machine.
Connection to the Water Supply
Ensure that the machine is correctly
connected to the Water Supply.
Ensure that the water fulfils all require-
ments set out under Environment and
Physical Data.
Ensure that the machine is correctly
connected to the drain.
Connection to the Power Supply
Ensure that the voltage specified on the
voltage tag matches the mainsvoltage.
Ensure that the machine is correctly
connected to the Power Supply.
Mains power must be connected to a
grounded power socket.
Connection of the Battery
Ensure that the rechargeable 9V battery is
correctly connected according to the instruc-
tions.
Connection of the dialysis fluid tubes
Ensure that the dialysis fluid tubes are
connected to the safety couplings.
Start-up procedure
Note! If you have any remarks during installa-
tion, please contact your Gambro Service
representative.
This record is to be signed and filed by the Service Engineer responsible for the installation.
Date............................Signature........................................................................
Serial number: ..................................
Ensure that the recommended
start-up procedure is followed.
Out of box report
Fill out the Installation / Out of
Box report and return it to:
Gambro Lundia AB
Monitor Division
Magistratsvägen 16
PO Box 10101
SE-220 10 Lund
Sweden
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
1:12
Installation Guide
This page is intentionally left blank
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212
  • Page 213 213
  • Page 214 214
  • Page 215 215
  • Page 216 216
  • Page 217 217
  • Page 218 218
  • Page 219 219
  • Page 220 220
  • Page 221 221
  • Page 222 222
  • Page 223 223
  • Page 224 224
  • Page 225 225
  • Page 226 226
  • Page 227 227
  • Page 228 228
  • Page 229 229
  • Page 230 230
  • Page 231 231
  • Page 232 232
  • Page 233 233
  • Page 234 234
  • Page 235 235
  • Page 236 236
  • Page 237 237
  • Page 238 238
  • Page 239 239
  • Page 240 240
  • Page 241 241
  • Page 242 242
  • Page 243 243
  • Page 244 244
  • Page 245 245
  • Page 246 246
  • Page 247 247

Gambro AK 95 User manual

Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI