ProMinent CHLORINSITU IIa Assembly And Operating Instructions Manual

Type
Assembly And Operating Instructions Manual
Chlorine Electrolysis System
CHLORINSITU
®
IIa
Assembly and operating instructions
EN
Original Operating Instructions (2006/42/EC)Part no. 982615 BA CI 018 02/18 EN
Please carefully read these operating instructions before use. · Do not discard.
The operator shall be liable for any damage caused by installation or operating errors.
The latest version of the operating instructions are available on our homepage.
In order to make it easier to read, this document uses the male
form in grammatical structures but with an implied neutral sense. It
is aimed equally at both men and women. We kindly ask female
readers for their understanding in this simplification of the text.
Please read the supplementary information in its entirety.
Information
This provides important information relating to the
correct operation of the unit or is intended to make
your work easier.
Warning information
Warning information includes detailed descriptions of the haz‐
ardous situation, see
Ä Chapter 1.2 ‘Labelling of Warning Informa‐
tion’ on page 6
.
The following symbols are used to highlight instructions, links, lists,
results and other elements in this document:
Tab. 1: More symbols
Symbol Description
Action, step by step.
Outcome of an action.
Links to elements or sections of these instructions or other applicable documents.
n
List without set order.
[Button]
Display element (e.g. indicators).
Operating element (e.g. button, switch).
‘Display /GUI’
Screen elements (e.g. buttons, assignment of function keys).
CODE
Presentation of software elements and/or texts.
General non-discriminatory approach
Supplementary information
Supplemental directives
2
Table of contents
1 Description of the system...................................................... 4
1.1 Description and operation............................................. 4
1.2 Labelling of Warning Information.................................. 6
1.3 User qualification.......................................................... 8
1.4 General safety information............................................ 9
2 Storage and Transport........................................................ 10
3 Components of the system................................................. 11
3.1
CHLORINSITU
®
IIa..................................................... 11
4 Preparation for use............................................................. 14
5 Installation and assembly.................................................... 15
5.1
Check-list for the assembly of Chlorinsitu
®
IIa............ 15
5.2
Assembly and installation of Chlorinsitu
®
IIa.............. 16
6 Operation............................................................................ 21
6.1 Navigation................................................................... 24
6.2 Status.......................................................................... 25
7 Commissioning................................................................... 26
7.1 Check-list for commissioning...................................... 27
7.2 Commissioning work................................................... 27
8
[ALARM]
/ Troubleshooting menu....................................... 31
8.1 Alarm messages......................................................... 31
8.1.1 Alarm:
[POWER UNIT]
............................................ 31
8.1.2 Alarm:
[POWER UNIT & CELL]
............................... 32
8.1.3 Hypocells................................................................. 32
8.1.4 Alarm: Product storage tank.................................... 33
8.1.5 Alarm: External product storage tank (optional)...... 33
8.1.6 Various alarms......................................................... 33
9 Maintenance and repair...................................................... 35
9.1 Maintaining the Operating Unit................................... 35
9.2 Maintenance............................................................... 35
9.3 Repair......................................................................... 36
10 Disposal of Used Parts....................................................... 37
11 Technical data..................................................................... 38
11.1
Specification of the Chlorinsitu
®
IIa 60 ... 300 g/h..... 38
11.2
CHLORINSITU
®
IIa................................................... 38
12 Declaration of Conformity for Machinery............................. 41
13 Index................................................................................... 42
Table of contents
3
1 Description of the system
The system is used for water disinfection in:
n Potable water
n Cooling tower
n Various process water systems
n Swimming pools
n etc.
The system is used to produce a chlorine-based disinfectant.
The system is used to electrochemically produce
‘free chlorine’
(NaOCl solution) from sodium chloride.
The quantity of
‘free chlorine’
is determined, among other things,
by the concentration of chloride ions, but also by the current
strength.
The system has the following features:
n The product is generated in-situ where it is needed
n There is no need to transport concentrated chemicals
1.1 Description and operation
The system produces free chlorine from a sodium chloride solution,
as per the diagram below. The system produces free chlorine by
means of an electrochemical process in a hypocell.
Description of the system
4
+
-
5
+
-
5
+
-
5
+
-
5
+
-
5
6
A
15
14
C
1
20
H
B
11
PI
13
FE 4
2
F F FF
C
12
LE
8
VLS
19
TE
16
TE
17
D
B
F
E
18
10%
90%
9
FS 10
FE
3
E
H
F
F
H
G
F
G
G
90%
90%
7
P PMA EL 0044 SW
21
Fig. 1: Components of the system
1 Product metering pump (optional or to be pro‐
vided on site)
2 Pressure meter for potable water
3 Flow meter for product from the cells
4 Flow meter for softened water to the cells
5 Hypocells (1 ... 5 possible)
6 Cartridge filter for potable water
7 Collecting pan
8 Liquid level sensor for collecting pan
9 Air filter
10 Air flow sensor
11 Solenoid valve for softened water
12 Control valve for softened water
13 Sampling tap for softened water
14 Softener
15 Brine metering pump
16 Temperature sensor for diluted brine to the cells
17 Temperature sensor for product to the cells
18 Ventilator
19 Float valve for brine storage tank (level con‐
trolled)
20 Brine storage tank (with sodium chloride)
21 Product storage tank, internal
--- Enclosed room system cabinet
A - Potable water
B - Softened water
C - Saturated brine
D - Diluted brine
E - Hydrogen
F - Product
G - Air
H - Diluted hydrogen
Description of the system
5
Sodium chloride for the brine storage tank: We recommend the use
of CHLORINSITU
®
salt.
If you do not wish or are unable to do this, only use salt that is cer‐
tified in accordance with the EU Regulation 528/2012. Ensure that
the salt meets the following specifications: min. 99.4 % NaCl, max.
0.05 % insoluble parts, max. 10 mg/kg iron, max. 10 mg/kg manga‐
nese, max. 100 mg/kg calcium + magnesium
Water quality: The water should be of potable water quality or com‐
parable.
The sound pressure level is < 70 dB (A) at maximum speed, at
maximum back pressure, using water as the medium.
Degree of protection of the system: IP 54.
1.2 Labelling of Warning Information
These operating instructions provide information on the technical
data and functions of the product. These operating instructions pro‐
vide detailed warning information and are provided as clear step-
by-step instructions.
The warning information and notes are categorised according to
the following scheme. A number of different symbols are used to
denote different situations. The symbols shown here serve only as
examples.
DANGER!
Nature and source of the danger
Consequence: Fatal or very serious injuries.
Measure to be taken to avoid this danger.
Description of hazard
Denotes an immediate threatening danger. If
the situation is disregarded, it will result in fatal
or very serious injuries.
WARNING!
Nature and source of the danger
Possible consequence: Fatal or very serious inju‐
ries.
Measure to be taken to avoid this danger.
Denotes a possibly hazardous situation. If the
situation is disregarded, it could result in fatal
or very serious injuries.
Basic substances required
Sound pressure level
Protection against contact and mois‐
ture (IP)
Introduction
Description of the system
6
CAUTION!
Nature and source of the danger
Possible consequence: Slight or minor injuries.
Material damage.
Measure to be taken to avoid this danger.
Denotes a possibly hazardous situation. If the
situation is disregarded, it could result in slight
or minor injuries. May also be used as a
warning about material damage.
NOTICE!
Nature and source of the danger
Damage to the product or its surroundings.
Measure to be taken to avoid this danger.
Denotes a possibly damaging situation. If the
situation is disregarded, the product or an
object in its vicinity could be damaged.
Type of information
Hints on use and additional information.
Source of the information. Additional measures.
Denotes hints on use and other useful informa‐
tion. It does not indicate a hazardous or dam‐
aging situation.
Description of the system
7
1.3 User qualification
WARNING!
Danger of injury with inadequately qualified per‐
sonnel
The operator of the system / equipment is respon‐
sible for ensuring that the qualifications are ful‐
filled.
If inadequately qualified personnel work on the unit
or loiter in the hazard zone of the unit, this could
result in dangers that could cause serious injuries
and material damage.
All work on the unit should therefore only be
conducted by qualified personnel.
Unqualified personnel should be kept away
from the hazard zone.
The pertinent accident prevention regulations, as
well as all other generally acknowledged safety
regulations, must be adhered to.
Training Definition
Instructed personnel An instructed person is deemed to be a person who has been instructed and,
if required, trained in the tasks assigned to him and possible dangers that
could result from improper behaviour, as well as having been instructed in the
required protective equipment and protective measures.
Trained user A trained user is a person who fulfils the requirements made of an instructed
person and who has also received additional training specific to the system
from the manufacturer or another authorised distribution partner.
Trained, qualified per‐
sonnel
A trained, qualified employee is deemed to be a person who is able to assess
the tasks assigned to him and recognize possible hazards based on his
training, knowledge and experience, as well as knowledge of pertinent regula‐
tions. A trained, qualified employee must be able to perform the tasks
assigned to him independently with the assistance of drawing documentation
and parts lists. The assessment of a person's technical training can also be
based on several years of work in the relevant field.
Electrical technician An electrical technician is able to complete work on electrical systems and rec‐
ognise and avoid possible dangers independently based on his technical
training and experience as well as knowledge of pertinent standards and regu‐
lations. An electrical technician must be able to perform the tasks assigned to
him independently with the assistance of drawing documentation, parts lists,
terminal and circuit diagrams. The electrical technician must be specifically
trained for the working environment in which the electrical technician is
employed and be conversant with the relevant standards and regulations.
Service The Service department refers to service technicians, who have received
proven training and have been authorised by the manufacturer to work on the
system.
Description of the system
8
1.4 General safety information
WARNING!
Warning of hydrogen and mains voltage
Only allow authorised technical personnel to open
the system cabinet.
WARNING!
Warning of chemicals
The lid of the product storage tank must be tightly
closed as soon as product or hydrogen may be
present in the product storage tank.
Prior to opening by authorised technical per‐
sonnel, allow the ventilator to continue to
aerate for 10 min with the production switched
off.
Description of the system
9
2 Storage and Transport
WARNING!
Storage of the system in unsuitable ambient condi‐
tions.
It is mandatory that the following storage
instructions are adhered to.
Unsuitable ambient conditions can result in mal‐
functions and faults in the installed system. When
the system is in operation, this can also lead to
hazards to the personnel.
Store the system in its original transport packaging in a sealed
room, observing the following conditions:
n At a temperature between 5 °C ... 50 °C
n At a relative air humidity below 85 % without condensation
n In a non-aggressive environment (no harmful vapours, chemi‐
cals, etc.)
n Protected from direct sunlight, rain and moisture
n Store the system upright.
WARNING!
Incorrect transport
Incorrect transport of the system by non-seaworthy
packaging or horizontal packaging.
It is mandatory that the following instructions
are adhered to.
Incorrect transportation can result in personal inju‐
ries and material damage.
n Carefully transport the system in a vertical position and only tilt
briefly at an angle of no more than 30 degrees - see label on
the transportation packaging.
n Avoid mechanical impacts.
n Protect the system from direct sunlight, rain and moisture
during transportation.
Storage
Transport
Storage and Transport
10
3 Components of the system
3.1
CHLORINSITU
®
IIa
The figure shows the version CHLORINSITU
®
IIa.
A2489
N
F
II.
I.
I J K
A
B
C
D
E
H
Fig. 2: Connectors, to be installed on site
I. View from above
II. Side view
Connectors, to be
installed on site
Installation side External pipework Specification
A Water connection
(potable water
quality)
DN15/Ø20 mm Ø20mm, PN16, PVCU >2 - <6 bar
(g)
>8 l/min.
Max. 30 °dH
10 ... 30 °C
Non-return valve required for the water connection.
B Sleeve section for
water from the soft‐
ener to the brine
storage tank
6/12mm hose Connection of brine storage
tank to the system cabinet
10 m included in the scope
of delivery
C Sleeve section for
product from
product metering
pump to process
(or external storage
tank)
6/12mm hose
D Sleeve section for
brine from the brine
storage tank to
softener
6/12mm reinforced
hose
E Sleeve section for
brine from the brine
storage tank to
brine metering
pump
6/12mm reinforced
hose
6/12mm reinforced hose
Components of the system
11
Connectors, to be
installed on site
Installation side External pipework Specification
F Drainage of diluted
hydrogen
DN50/Ø63 mm Ø63mm, PN10, PVCU piping,
steadily rising (>1%) and
leading outside
Max. 10 metres and 3
knees / bends. At the exit
point: Rain and wind protec‐
tion (H piping - see the
"Assembly and Installation"
chapter)
G Brine storage tank
overflow
DN20/Ø25 mm Ø32mm, PN10, PVCU
H Drainage to the
sewage system
DN25/Ø32 mm Ø32mm, PN10, PVCU
I Power supply
230VAC,
N,PE,50Hz
If desired: External
activation
Optional: Low flow contact for external product metering
pump
J Optional: Control
signal for external
product metering
pump
If desired: Alarm
contact,
Optional: 3 level switch for external product storage tank
K Optional: Ethernet
cable
One of the following ports must be open: UDP1193, TCP 443, TCP 80. For more
information:
http://www.remoteengineer.eu/en
L Optional: external
product storage
tank
Storage tank, black: 250 l
Storage tank, black: 500 l
Storage tank, black: 1000 l
Storage tank, black: 1500 l
M Brine storage tank Dimensions:
Units at 60 ... 120 g/h: 130 L, 780 x 600 mm (HxD)
Units at 180 ... 300 g/h: 200 L, 830 x 680 mm (HxD)
N Control cabinet Contains cells, internal power supply, control, etc.
Also contains the internal standard product storage tank.
Also ready for an optional product metering pump / chemical transfer pump.
Components of the system
12
L
M
N
A2490_2
Fig. 3: Connectors, to be installed on site
Components of the system
13
4 Preparation for use
WARNING!
Danger due to operation of the system in unsuit‐
able locations.
Adhere to all national and local regulations
relating to the use of chlorine.
In particular, it is the responsibility of the oper‐
ator to draw up an Explosion Protection Docu‐
ment according to ATEX. An information docu‐
ment is available from the manufacturer upon
request.
The operator of the system is responsible for
ensuring that the regulations are implemented.
Disregarding the safety requirements can lead to
personal injuries or material damage.
n Ensure that the floor of the room has sufficient load-bearing
capacity to bear the weight of the filled system.
n Ensure that the floor is even and horizontal and has a solid
base surface.
n At a hight of 100 cm, the system may be deflected by a max‐
imum of 0.4 cm.
n Ensure that the room has an adequately dimensioned floor
drain to safely drain any escaping water in the event of a pipe
leak.
n Do not locate permanent work places in rooms in which the
system is situated.
n Ensure that the room is free of aggressive vapours and chemi‐
cals.
n Ensure that the room contains minimal dust.
n Ensure that the room has an adequate air supply; total cross-
sectional area of the air intake openings > 225 cm². With a grid,
take into account the area that allows for effective air flow!
n It must be possible to run an exhaust line for the hydrogen from
the room toward the ceiling. Ensure that there is no danger due
to the hydrogen at the end of the exhaust line.
n Ensure that the room temperature and air humidity do not
exceed the permissible limits. Install an air conditioning system
in the room if this cannot be guaranteed.
n Protect the system from direct sunlight.
n Allow a minimum clearance of ⋝ 20 cm for the ventilator and for
service and maintenance to the left and right of the control cab‐
inet. The installation plan must also be taken into consideration
- see the end of the “Installation” chapter.
n Ensure that there is sufficient room for the brine storage tank
next to the system cabinet, as well as an optional space for an
external product storage tank.
n Ensure that the room has a suitable and adequate mains
voltage connection for operation of the relevant system.
n Use a non-return valve type BA for connection to the potable
water network, as described in the German version of EN
1717:2000 or the German Technical and Scientific Association
for Gas and Water (DVGW) Technical Regulations.
The system requires a stable water pressure of 2 ... 5 bar
upstream of the non-return valve.
n Ensure that the potable water hardness does not exceed 30
°dH.
Otherwise contact "van den Heuvel Watertechnologie bv".
Preparation for use
14
5 Installation and assembly
5.1
Check-list for the assembly of Chlorinsitu
®
IIa
# Assembly process Tick
1 Check whether the assembly location complies with the guidelines governing tempera‐
ture, safety, space, humidity, etc.
2 Clear the area in which the system is to be installed.
3 Remove all packaging from the system.
4 Check whether the system has suffered damage during transport or exhibits other
damage.
5 Remove the securing material of the transport crate.
6 Lift the system cabinet into its installation position.
7 Check that the system has been placed on the platform (optional) and is oriented hori‐
zontally (max. 4 mm deviation from the vertical line per 100 cm).
8 Remove the transport protection from the softener and the product storage tank.
9 Place the brine storage tank (M) and optionally an external product storage tank in their
intended positions.
10 Route a Ø 32 mm PVCU line from the Ø 32 mm PVCU connector (H) at the system cab‐
inet (N) into the sewage system.
11 Route the Ø 63 PVCU discharge line (F) on the system cabinet to the outside.
12 Glue an H system (pipework) to the exterior air outlet to prevent dirt or rain water from
getting inside.
13 Connect a potable water line with the system's Ø 20 mm PVCU “water supply” con‐
nector.
14 For the “external product storage tank” option: Connect a Ø 6x12 mm PVC hose
between the product metering pump and the connector at the external product storage
tank (L) or at an injection point, e.g. - via the sleeve section (C).
15 Connect a reinforced Ø 6x12 mm PVC hose between the “fill brine storage tank” con‐
nector in the system's interior and the Ø 6x12 mm connector at the product storage tank
- via the sleeve section (D).
16 Connect a reinforced Ø 12 / Ø 6 mm PVC hose between the brine storage tank and the
brine metering pump - via the sleeve section (E).
17 Connect a Ø 6 mm PVC hose from the brine storage tank to the softener - via the sleeve
section (B).
18 Route a Ø 32 mm PVCU line from the brine storage tank (M) into the sewage system.
Ensure that the brine storage tank contains salt as soon as the PVCU line has been con‐
nected.
Electrical connections - according to the electrical circuit diagram:
19 Connect the external alarm contact with the control cabinet - via the sleeve section (K).
20 Optional: Connect the activation contact with the control cabinet - via the sleeve section
(K). Remove the wire jumper between the contacts.
21 Optional: Connect the “Level too low” level switch of the external product storage tank
with the external product metering pump - via the sleeve section (K). Remove the wire
jumper.
Installation and assembly
15
# Assembly process Tick
22 Optional: Connect the “Level too high” level switch of the external product storage tank
with the control cabinet - via the sleeve section (K).
23 Optional: Connect the “Start / stop level” level switch of the external chlorine storage
tank with the control cabinet - via the sleeve section (K).
24 Optional: Connect the “Level low” level switch of the external product storage tank with
the control cabinet - via the sleeve section (K). Remove the wire jumper.
25 Optional: Connect the Ethernet cable with the control cabinet - via the sleeve section
(K).
26 Assemble and install a double-pole mains switch or an emergency stop switch in the
immediate vicinity of the system.
27 Install a mains cable between the internal power supply and the mains switch or the
emergency stop switch - via the sleeve section (J).
5.2
Assembly and installation of Chlorinsitu
®
IIa
n User qualifications, mechanical/hydraulic assembly: trained
technical personnel, see
Ä Chapter 1.3 ‘User qualification’
on page 8
n User qualification, electrical installation: Electrical technician,
see
Ä Chapter 1.3 ‘User qualification’ on page 8
1. Check whether the assembly location complies with the
guidelines governing temperature, safety, space, humidity,
etc.
Specification of the assembly location
Ensure that the assembly location preferably
complies with the following conditions:
A dry area, which does not necessarily
have to be a separate room.
An area that can be locked/cordoned off
so that only authorised personnel have
access.
An ambient temperature of 10 ... 40 °C;
otherwise install an air conditioning
system.
It should be possible to install a sewage
drain and a bleed line.
An assembly drawing showing the correct
dimensions can also be produced to ensure
correct assembly. The assembly area and
position are determined using the drawings
provided. An assembly drawing for the Chlor‐
insitu
®
IIA 60 ... 300 g/h can be found at the
end of the chapter.
Installation and assembly
16
2. Clear the area in which the system is to be installed.
Check that there are no obstacles around the
system.
Provide a clearance of around 1 m in front
and on the side of the system for mainte‐
nance purposes.
Provide a clearance of around 1 m in front of
and on one of the sides of the brine storage
tank and the optional product storage tank.
3. Remove all packaging from the system.
4. Check whether the system has suffered damage during
transport or exhibits other damage. Check that the scope of
delivery is complete.
5. Remove the securing material of the transport crate.
6. Lift the system cabinet into its installation position.
7. Check that the system has been placed on the platform
(optional) and is oriented horizontally (max. 4 mm deviation
from the vertical line per 100 cm).
8. Remove the transport protection from the softener and the
product storage tank.
L
M
N
A2490_2
Fig. 4: Chlorinsitu
®
IIa system
L Optional: external product storage tank
M Brine storage tank
9. Place the brine storage tank (M) and optionally an external
product storage tank in their intended positions. Preferably
position the brine storage tank in the direct vicinity of the
system. Remove all objects from the contact faces for the
brine storage tank and the external product storage tank -
even the smallest foreign objects. Due to the heavy weight of
the filled storage tanks, the storage tanks may be damaged
by these objects.
Installation and assembly
17
A2489
N
F
II.
I.
I J K
A
B
C
D
E
H
Fig. 5: Connectors for Chlorinsitu
®
IIa system cabinet
A Connector for potable water input
B Sleeve section for softened water output to the
brine storage tank
C Sleeve section for brine input to the softener
D Sleeve section for product output from the
product pump
E Sleeve section for brine input to the brine pump
F H
2
discharge line
G -
H Connector for waste water output
I Electrical sleeve section for power supply line
J, K Electrical sleeve section for control lines
10. Route a Ø 32 mm PVCU line from the Ø 32 mm PVCU con‐
nector (H) at the system cabinet (N) into the sewage system.
11. Route the Ø 63 PVCU discharge line for the hydrogen to the
outside above the system cabinet.
CAUTION!
Do not position the outlet inside the building.
Glue the device's output (F) to the discharge line.
Installation and assembly
18
H2
B1016
Fig. 6: H system
12. Glue an H system (pipework) to the exterior air outlet to pre‐
vent dirt or rain water from getting inside (e.g., may be
assembled with 3 T pieces).
CAUTION!
Do not position the air outlet in the
vicinity of:
Suction openings
Windows
Chimney openings
Take into account the wind dynamic
pressure, e.g., at the side of a building
If lines are too long, use a 75 mm pipe
If you have questions, please contact van
den Heuvel Watertechnologie b.v .
13.
Non-return valve
Install a non-return valve in the potable water
supply line in compliance with national regu‐
lations.
Connect a potable water line with the system's Ø 20 mm
PVCU “water supply” connector. This should be combined
with a stopcock.
n Maximum pressure = 6 bar
n Minimum flow = 8 l/min
n Temperature = Potable water, 8 ... 30 °C
n Minimum pressure downstream of the non-return valve=
2 bar
14. For the “external product storage tank” option: Connect a
reinforced Ø 6x12 mm PVC hose between the product
metering pump and the connector at the external product
storage tank (L) or at an injection point, e.g. - via the sleeve
section (C).
15. Connect a Ø 6x12 mm PVC hose, red, between the “fill brine
storage tank” connector in the system's interior and the
product storage tank (M) - via the sleeve section (A).
16. Connect a reinforced Ø 12 / Ø 6 mm PVC hose between the
brine storage tank (M) and the brine metering pump - via the
sleeve section (E).
17. Connect a Ø 6x12 mm PVC hose, transparent, from the brine
storage tank (M) to the softener - via the sleeve section (B).
Installation and assembly
19
18. Route a Ø 32 mm PVCU line from the brine storage tank (M)
into the sewage system.
Ensure that the brine storage tank contains salt as soon as
the PVCU line has been connected.
19. Electrical connections - according to the electrical circuit dia‐
gram:
Connect the external alarm contact with the control cabinet -
via the sleeve section (K).
20. Optional: Connect the activation contact with the control cab‐
inet - via the sleeve section (K). Remove the wire jumper
between the contacts.
21. Optional: Connect the “Dry run protection” outlet of the
external product storage tank with the control cabinet - via
the sleeve section (K). Remove the wire jumper.
22. Optional: Connect the “Level too high” level switch of the
external product storage tank with the control cabinet - via
the sleeve section (K).
23. Optional: Connect the “Start / stop level” level switch of the
external product storage tank with the control cabinet - via
the sleeve section (K).
24. Optional: Connect the “Level too low” level switch of the
external product storage tank with the control cabinet - via
the sleeve section (K).
25. Optional: Connect the Ethernet cable with the control cabinet
- via the sleeve section (K).
26. Assemble and install a double-pole mains switch or an emer‐
gency stop switch in the immediate vicinity of the system.
27. Install a mains cable between the internal power supply and
the mains switch or the emergency stop switch - via the
sleeve section (J).
Ø620
Chlorinsitu® IIa
Chlorinsitu® IIa
Ø620
P EL 0045 SW
Fig. 7: Installation plan for Chlorinsitu
®
IIA 60 ... 300 g/h with brine storage tank - all dimensions in mm
Installation and assembly
20
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44

ProMinent CHLORINSITU IIa Assembly And Operating Instructions Manual

Type
Assembly And Operating Instructions Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI