  • Hello, I have reviewed the installation guide for the LEFROY BROOKS TEN TEN towel rails. This guide provides instructions on how to install the towel rails, available in 12", 18", and 24" lengths. The instructions include the necessary tools and steps required for mounting the towel rail. I'm ready to answer your questions about the installation process and product details.
  • What size drill bit is needed for installation?
    What tools are required for installation?
    Are the wall plugs included?
TT 4965 (12") / TT 4966 (18") / TT 4967 (24")
TEN TEN TOWEL RAILS
INSTALLATION GUIDE
2
DIMENSIONS
TOOLS REQUIRED
Powered drill with Ø6mm drill bit Flat blade screwdriver Spirit level
60mm
90mm
Three lengths = 305mm, 457mm & 610mm
Three lengths = 12", 18" & 24"
Three lengths = 365mm, 517mm & 670mm
3
INSTALLATION
1 Use a spirit level to ensure the towel rail is
level. Mark the hole positions on the mounting
surface.
2 Drill holes using a Ø6mm drill bit.
3 Insert the wall plugs into the holes then secure
the towel rail using the screws supplied.
Alternative wall plugs should be used subject
to mounting surface construction (not
supplied).
CUSTOMER SUPPORT
+44 (0)1992 708 316
LEFROYBROOKS.CO.UK
Whilst every effort is made to ensure the accuracy of these, they are subject to change without notice as part
of the company’s product development process. The use of trademarks, product design and artwork is subject to
licence or agreement with LBIP Ltd. The design registrations, trademark registrations and copyrights are protected
by law and the use or reproduction outside the terms of an agreement is prohibited. The right to modify designs
and dimensions is reserved. LBIP Ltd is a member of ACID (Anti Copying in Design).
© LBIP Ltd 2016
20.065.247A / OCTOBER 2016
/