Strong SM-PROJ-M-BLK Owner's manual

Category
Projector mounts
Type
Owner's manual

This manual is also suitable for

SM-PROJ-L-BLK
Strong™ Universal Projector Mount for Projectors up to 50 Lbs. (Black)
For Mounting on a Concrete Ceiling (Fig. 4)
a. Pre-drill four holes into concrete using 3/8” Masonry bit.
Insert Concrete Anchors and tap in with hammer, if necessary.
WARNING:WheninstallingCeilingPlateoncinderblock,rstverifythereisaminimumof1-3/8”
of concrete thickness to be used for the Concrete Wall Anchors. Do not drill into mortar joints!
Besuretomountinasolidpartoftheblock,generally1”minimumfromthesideoftheblock.
CinderblockmustmeetASTMC-90specications.Itissuggestedthatastandardelectricdrillonslow
settingisusedtodrilltheholeinsteadofahammerdrilltoavoidbreakingoutthebackofthehole
whenenteringavoidorcavity.Concretemustbe2000psidensityminimum.Lighterdensityconcrete
may not hold concrete anchor.
Make sure that the supporting surface will safely
support the combined load of the equipment and
all attached hardware and components.
b.InsertfourLagScrewsintotheConcreteAnchors
through the Extended Ceiling Plate.
WARNING: Tighten screws so that the Extended
CeilingPlateisrmlyattached,butdonotover-tighten.
Over-tighteningcandamagethescrews,greatly
reducing their holding strength.
c. Insert Extension Pole (ULListedSM-FIXPOLEseries,not
included)intoExtendedCeilingPlate.Lockpolein
place with two M5 set screws.
d.OnbottomofExtensionPole,threadonLow-Prole
Ceiling Plate, making sure the arrow (on bottom)
faces the screen when installed. Tighten Security Screw
(pre-installed)tolockLow-ProleCeilingPlateontoExtension
Pole to set in place.
Step 3: Attach the Projector Mount Body (Fig.5)
a. Slightly loosen all screws so arms easy rotate and extend to
match the holes on the projector. Making sure the arrow
on bottom points toward the projector lens, attach the
Projector Mount Body onto projector using supplied M3,
M4,M5orM6SocketScrewsandM2orM4AllenKey.
b. Depending on the surface of the projector, lowering
theAngleBracketsontheendofthearmstogetaush
mountingmaybenecessary(Fig6).
NOTE:Positioncenterofgravityofprojectortothemiddle
of the mount, if possible.
Step 5: Assemble Projector Mount Body
withLow-ProleCeilingPlate
a. While holding projector, slide top of Projector
MountBodyintotheLow-ProleCeiling
Plateasindicated(Fig.7).
b.UsingeitheraPhilipsHeadScrewdriveror
ngers,pushinandturnlockscrew(attached
toLow-ProleCeilingPlate)tosecure.
c. Using4mmAllenkey,install10-32SocketSecurity
Screwintooppositesideasindicated(Fig.8).
Adjustments
To change the tilt or roll of the mount for centering the picture,
useAllenkeyandrstloosenscrewsonProjectorMountBody.
Tilt the projector into the desired position and re-tighten the screws.
Lifetime
Fig4
Fig5
Fig6
Fig7
Fig8
Lifetime Limited Warranty
All Strong™ products have a Lifetime Limited Warranty. This warranty includes parts and labor repairs on all
components found to be defective in material or workmanship under normal conditions of use. This warranty
shall notapply to products which have been abused, modied or disassembled. Products to be repaired under
this warranty must be returned to SnapAV or a designated service center with prior notication and an
assigned return authorization number (RA).
For Techincal Support : 1.866.838.5052
10-32SecurityScrew
LockScrew
INSTALLATION INSTRUCTIONS
Step1:UseCeilingPlatetoMarkMountingHoleLocations(Low-ProleorExtension)
a. Theuseofastudnderishighlyrecommended.WhenmountingtheLow-ProleCeilingPlate,
makesurearrowonbottomoftheLow-ProleCeilingPlatefacestowardthescreen.
Step2:MounttheCeilingPlate
Low-Prole Ceiling Plate
For Mounting on a Wood Joist (Fig. 1)
a.Pre-drilltwoholesintojoistusinga3/16”drillbit.
Be sure to drill into the center of the joists.
b.InserttwoLagScrewsintoholesthroughthe
Low-ProleCeilingPlateandtightendown.
WARNING:TightenscrewssothattheLow-Prole
CeilingPlateisrmlyattached,butdonotover-
tighten.Over-tighteningcandamagethescrews,
greatly reducing their holding strength.
For Mounting on a Concrete Ceiling (Fig. 2)
a. Pre-drill two holes into concrete using 3/8” Masonry bit. Insert Concrete Anchors and
tap in with hammer, if necessary.
WARNING:WheninstallingCeilingPlateoncinderblock,rstverifythereisaminimumof1-3/8”
of concrete thickness to be used for the Concrete Wall Anchors. Do not drill into mortar joints!
Besuretomountinasolidpartoftheblock,generally1”minimumfromthesideoftheblock.
CinderblockmustmeetASTMC-90specications.Itissuggestedthatastandardelectricdrillonslow
settingisusedtodrilltheholeinsteadofahammerdrilltoavoidbreakingoutthebackofthe
holewhenenteringavoidorcavity.
Concretemustbe2000psidensity
minimum.Lighterdensityconcrete
may not hold concrete anchor.
Make sure that the supporting surface
will safely support the combined load
of the equipment and all attached
hardware and components.
b.InserttwoLagScrewsintotheConcrete
AnchorsthroughtheLowProleCeilingPlate.
WARNING:TightenscrewssothattheLow-Prole
CeilingPlateisrmlyattached,butdonotover-
tighten.Over-tighteningcandamagethescrews,
greatly reducing their holding strength.
Extension Ceiling Plate
For Mounting on a Wood Joist (Fig. 3)
a. Use Extension Ceiling Plate to mark two hole locations.
Pre-drilltwoholesintojoistusinga3/16”drillbit.Besure
to drill into the center of the joists.
b.InserttwoLagScrewsintoholesthroughtheExtension
Ceiling Plate and tighten down.
WARNING:TightenscrewssothattheLow-ProleCeiling
Plateisrmlyattached,butdonotover-tighten.Over-
tightening can damage the screws, greatly reducing their
holding strength.
c. ThreadExtensionPole(ULListedSM-FIXPOLEseries,notincluded)
intoExtendedCeilingPlate.LockpoleinplacewithtwoM5setscrews.
d.OnbottomofExtensionPole,threadonLow-ProleCeiling
Plate, making sure the arrow (on bottom) faces the screen
when installed. Tighten Security Screw (pre-installed) to lock
Low-ProleCeilingPlateontoExtensionPoletosetinplace.
#14x2.5”
LagScrew(x4)
#14x2.5”
LagScrew(x4)
ExtensionCeilingPlate(x1) ExtensionPlateCover(x1)
M3x8 Socket
Screw, security (x4)
Low-ProleCeiling
Plate(x1)
Projector Mount
Body(x1)
M4x10Socket
Screw, security (x4)
M5x10Socket
Screw, security (x4)
M6x10Socket
Screw, security (x4)
10-32X10Socket
Screw,security(x1)
10x50Concrete
Anchor (x4)
4mm (ID) Washer
(x4)
4mm (ID) Washer
(x4)
M5x5 Set Screw,
security/non-security
(x2/2)
2mmAllenWrench,
security(x1)
2mmAllenWrench,
security(x1)
4mm Allen Wrench,
security(x1)
HARDWARE KIT
SPECIFICATIONS
•Maximumload:50lbs(22.68kg).
•Tiltrange:+/-25º
•Roll:+/-6º
TOOLS REQUIRED
•PhilipsHeadScrewDriver
•PowerDrill
•3/16”(5mm)DrillBit
•3/8”(10mm)MasonryBit
•StudFinder
•10mmor3/8”Socket
Head Wrench
WARNINGS
•Wehighlyrecommendthisproductbeinstalled
byaqualiedprofessional.
•Donotbegininstallationuntilyouhave
thoroughly read and understand these instructions.
•Thismountsupportsprojectorswithamaximumload
of50lbs(22.68kg).
•Ensuretheceilingwillsafelysupportfourtimesthe
combined weight of the mount and projector.
•Undernocircumstancesshouldthisproduct
be mounted to metal studs.
•Themanufacturerdoesnotacceptresponsibility
for incorrect installation.
MAINPACKAGECONTENTS
EXTENSIONPLATECONTENTS
Fig1
Fig2
Fig3
CAUTION:
This mount is intended for use only with
themaximumweightof50lbs(22.68kg).
  • Page 1 1
  • Page 2 2

Strong SM-PROJ-M-BLK Owner's manual

Category
Projector mounts
Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI