STIEBEL ELTRON WPKI 5 Operation Instruction

Type
Operation Instruction
INSTALLATION
INSTALLATIE
ASENNUS
INSTALACE
INSTALACJA
INŠTALÁCIA
Wärmepumpen-Kompaktinstallation | Compact heat pump installation | Kit hydraulique pour ballon tampon | Compacte
warmtepompinstallatie | lämpöpumppujen asennussarja | Kompaktní instalace tepelného čerpadla | Instalacja kompaktowa
dla pomp ciepła | Kompaktná inštalácia tepelného čerpadla
» WPKI 5
6 | WPKI 5
INSTALLATION
General information
1. General information
This document is intended for contractors.
Note
Read these instructions carefully before using the ap-
pliance and retain them for future reference.
Pass on the instructions to a new user if required.
This symbol indicates that you have to do something. The
action you need to take is described step by step.
Relevant documents
Operating and installation instructions for system
components
Note
Please see appliance operating and installation in-
structions for information on the "Guarantee" and
"Environment and recycling".
2. Safety
Only qualied contractors should carry out installation, com-
missioning, maintenance and repair of the kit.
2.1 General safety instructions
We guarantee trouble-free function and operational reliability
only if original accessories and spare parts intended for the
appliance are used.
2.2 Instructions, standards and regulations
Note
Observe all applicable national and regional regula-
tions and instructions.
2.3 Intended use
The compact heat pump installation is intended for heating
heat pumps without integral heating circuit pump.
Any other use beyond that described shall be deemed inap-
propriate. Observation of these instructions and of instructions
for any accessories used is also part of the correct use of this
appliance.
3. Kit description
The compact heat pump installation includes all required com-
ponents for hydraulic connection of the heat pump to buer
cylinders with 200, 400and 700l capacity. Select and retrot
the heating circuit pump according to the system in DN25.
3.1 Standard delivery
The kit is supplied in pre-assembled individual parts. All pre-as-
sembled components are factory sealed.
Note
A gravity brake is tted in the buer cylinder connec-
tor.
The opening pressure is 400mmWC.
3.2 Required accessories
- UP 25/7.5 PCV
WPKI 5 | 7
ENGLISH
INSTALLATION
Installation
4. Installation
D0000051810
1
2
4
5
6
7
8
9
10
3
1 Connector with ball shut-o valve
G11/4female thread heating ow
2 Safety valve 0.3MPa
3 Temperature pressure gauge
4 Connector with gravity brake
5 G11/4male thread heat pump ow connector
6 Connector with ball shut-o valve
G11/4female thread heating return
7 Ball shut-o valve
8 Drain valve
9 G11/4male thread heat pump return connector
10 G3/4female thread expansion vessel connection
Screw the kit components and the heating circuit pump
together and tighten by hand.
Fit the components and the heating circuit pump on the
cylinder.
Retighten the ttings.
Fit the expansion vessel and the drain valve.
Fit the heat pump ow and return to the heat pump.
Note
The WPKI5 safety valve must not be able to be isolated
from the heat source.
Note
When there is a danger of frost in alternative opera-
tion, a drain valve must be installed on site to drain an
external air source heat pump (WPL and connection
hoses).
Note
All shut-o devices are tightly sealed ball shut-o
valves.
Only use an open-ended spanner (AF8) to open
and close the ball shut-o valves.
4.1 Heating circuit pump (cylinder charging
pump)
A corresponding heating circuit pump can be selected based
on the characteristic curves for the pumps and the pressure
loss from the compact heat pump installation.
Depending on the heat pump type, we recommend a heating
circuit pump from the following table for a standard system.
Heating circuit pump for buer cylinder
Heat pump UP 25/7.5 PCV
WPL 13 E, TTL 13 E X
WPL 18 E, TTL 18 E X
WPL 23 E, TTL 23 E X
WPL 33 HT, TTL 33 HT X
WPL 15 AC(S), TTL 15 ACS X
WPL 20 A(C), TTL 20 A(C) X
WPL 25 AC(S), TTL 25 AC X
HPA-O 7-13 (C)(S) Premium X
Heating circuit pump for DHW cylinder
Heat pump UP 25/7.5 PCV
WPL 13 E, TTL 13 E X
WPL 18 E, TTL 18 E X
WPL 23 E, TTL 23 E X
WPL 33 HT, TTL 33 HT X
WPL 15 AC(S), TTL 15 ACS X
WPL 20 A(C), TTL 20 A(C) X
WPL 25 AC(S), TTL 25 AC X
HPA-O 7-13 (C)(S) Premium X
8 | WPKI 5
INSTALLATION
Maintenance
5. Maintenance
5.1 Replacing the safety valve
1.
2.
D0000055418
Replace the safety valve as shown in the diagram.
Install the new safety valve in reverse order.
Seal in the safety valve by turning the lock nut against the
O-ring.
6. Specication
6.1 Characteristic curve for heating circuit
pump
UP25/7.5PCV (constant)
201620
UP 25 7.5 PCV
Z
D0000034116
WPKI 5 | 9
ENGLISH
INSTALLATION
Specication
UP25/7.5PCV (variable, PWM)
Z
201620
UP 25 7.5 PCV
D0000043215
6.2 Pressure drop diagram
0
10
20
30
40
50
60
70
80
90
0 500 1000 1500 2000 2500
1
D0000055448
X Flow rate [l/h]
Y Pressure drop [hPa]
1 Pressure loss on heat pump side
0
5
10
15
20
25
0 500 1000 1500 2000 2500
1
D0000055448
X Flow rate [l/h]
Y Pressure drop [hPa]
1 Pressure loss on heating side
6.3 Data table
WPKI 5
234763
Max. operating pressure MPa 0.3
Safety valve, heating MPa 0.3
Connection G 1 1/4
Installed length (gauge) mm 180
Weight kg 5,1
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36

STIEBEL ELTRON WPKI 5 Operation Instruction

Type
Operation Instruction

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI