www.OZCOBuildingProducts.com
General Guidelines:
•Materialsareheavyandbulkyminimumof2peoplearerequiredformostinstallations
•Braceandtieofflargebeamsandpostsuntilallconnectionsaremade
•Wearpropersafetyequipment
•Checkwithlocalauthoritiesandhomeownersassociationbeforeconstruction
•Checkforundergroundandorhiddenutilitiesthatcouldbedamaged
•Besuretousetherighttoolforthejob
•Planaheadandhavetherequiredhardware,fastenersandtoolscloseathandbeforestartingthe
installation
Steps:
1.MeasureandmarkthepostatthelocationwheretheBOTTOMedgeofthebeamwillbe.
2.Ifaddinganaccentmedalliondrillallholesinthedecorativeplatesusing3/16”drillbit.Locatetip
ofdrillbitondimple.
3.RemovethreadedcoversfromallHexCapNuts
a.InsertLagBoltsintoCapNuts
b.OWTLagBoltsrequirea3/8”HexBit
c.ReplaceThreadedCoversuntilushwithedgeofthenut
d.HINT:UsetreadlockonThreadedCoversinaccessibleareas
4.Attachangledbasetopostwiththeshorterlagscrewsassuringthatitismountedlevel.
5.RestbeamonAngleBaseandpositiontheCoverPlatesothetabsontheAngleBaseengagewith
theCoverPlate.
a.Ifattaching4”beamtopostyoumustdadothepost2”withsaw
b.WARNINGlagscrewsprovidedwiththe2”PosttoBeamkitarenotlongenoughfor4”
installations.
6.AttachCoverPlatewithlagbolts
7.InstallDecorativeMedallion
Use and Care:Thishardwaremaynotbesuitableforeverysituationorinstallationapplication.A
designprofessionalshouldbeconsultedtoensurethespecicinstallationapplicationmeetslocal
buildingcoderequirements.
Ifhardwarebecomesdirtycleanwithsoapandwater.Avoidabrasionstosurfaceandtouchupany
scrapeswithpaint.Rinsewithfreshwaterifhardwarecomesincontactwithicesaltorsaltwater.
Kit Includes:
2 Post Ledge Base (a) 8 Hex Cap Nuts (c)
2 TopCoverPlates(b) 43¾″LagBolts(d)
42¾″LagBolts(e)
Post To Beam 2″ Item #:56610
Laredo Sunset - Installation Guide