Premier Mounts CPC Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Premier Mounts CPC Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 1
CPC Pipe Cable Cover Kit Installation Instructions
9533-040-001-00
Parts List
CPC
3130 East Miraloma Avenue
Anaheim, CA 92806 USA
USA and Canada
Phone: 1.800.368.9700
Fax: 1.800.832.4888
Other Locations – Phone: (001).714.632.7100; Fax: (001).714.632.1044 ©Premier Mounts 2010
Clasp additional CPCs as
needed.
Clasp multiple CPCs over
the pipe or tubing to cover
the length of the cabling
and/or wiring.
Step 3
Clasp the CPC over the cabling or wiring, and pipe or tubing (Figure 1).
Step 2
Make sure the pipe or tubing is outside the inner ribs of the CPC (Figure 2).
The CPC Pipe Cable Covers t over pipes and tubing. Conceal cables and
electrical conduits by running them alongside the pipe or tubing. The CPCs t
1½” pipes, 2” pipes, 2” tubing, 1”x1” square tubing, and Premier Mounts’ elliptical
tubing.
After you have completed installing
the A/V components, choose the
appropriate CPC length for the pipe
or tubing.
You may use multiple CPCs
together to conceal all cable
and electrical wiring.
Step 1
Clasp the CPC over the wide side of the elliptical tubing (Figure 2).
12” CPC (Qty 4)
2” CPC (Qty 2)
Elliptical Tubing
or
Rib
Pipe or Tubing
Figure 2
Figure 1
/