Toro 12in Boom Extension, RT1200 Trencher Installation guide

Type
Installation guide
FormNo.3394-809RevB
12inBoomExtension
RT1200Trencher
ModelNo.25513
ModelNo.25513E
InstallationInstructions
WARNING
CALIFORNIA
Proposition65Warning
ThisproductcontainsachemicalorchemicalsknowntotheStateofCaliforniato
causecancer,birthdefects,orreproductiveharm.
WARNING
Whentheengineisoff,attachmentsintheraisedpositioncangraduallylower.Someonebelowthe
attachmentmaybepinnedorinjuredbytheattachmentasitlowers.
Alwayslowertheattachmenteachtimeyoushutoffthetractionunit.
Installation
1
PreparingtoInstalltheBoom
Extension
NoPartsRequired
PreparingtheMachine
1.Movethemachinetoalevelsurfacethatisbelowthe
liftingequipment.
2.Lowerallattachments.
3.Ensurethatthetiltfeatureofthemachineisleveland
thetilt-lockoutpinissecuretothechassis-lockout
bracket;refertotheOperator’sManualforthemachine.
4.Shutoffthemachine,settheparkingbrake,and
removethekeyfromthekeyswitch.
PreparingaNewCenterTrencher
Note:Refertothefollowingsetupproceduresinthecenter
trencherOperator’sManualfortheRT1200tractionunit.
1.PreparingtoInstalltheTrencher
2.InstallingtheSpeed-ShiftSwitch
3.InstallingtheTrencherAttachment
4.PreparingtheHydraulicMotor
5.ConnectingtheLiftCylinderHoses
6.InstallingtheHydraulicHoses
7.ConnectingtheWiringHarnesstotheHydraulicMotor
8.PurgingAirfromtheHydraulicMotorandLift
Cylinder
9.InstallingtheSprocket
10.InstallingtheAuger
©2015—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.T oro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3394-809*B
2
RemovingtheDiggingChain
NoPartsRequired
Procedure
Machineswithaninstalledtrencher
Restraintbarweightfora
122cm(48inch)rockboom
11kg(24lb)
Restraintbarweightfora
152cm(60inch)rockboom
14kg(30lb)
Crumberweightfora122
cm(48inch)rockboom
60kg(125lb)
Crumberweightfora152
cm(60inch)rockboom
68kg(151lb)
1.Useliftingequipmentasneededtosupporttherestraint
barorcrumber.
2.Removethe4bolts(5/8x11inch)and4locknuts
(5/8inch)thatsecuretherestraintbarorcrumber,and
removethebar(Figure1).
Figure1
1.Locknut(5/8inch)
3.Bar-mountingplates
2.Bolt(5/8x11inch)4.Restraintbar(shown)
3.Removethediggingchain;refertotheRemovingthe
DiggingChainprocedureintheMaintenancesection
ofthecentertrencherOperator’sManualfortheRT1200
tractionunit.
3
RemovingtheBoom
NoPartsRequired
Procedure
Machineswithaninstalledtrencher
122cm(48inch)rockboom
weight
212kg(466lb)
152cm(60inch)rockboom
weight
239kg(526lb)
1.Starttheengineofthemachine;refertothetraction
unitOperator’sManual.
2.Usetheattachment-elevationswitchtomovethe
boom-mountttingofthetrenchertothehorizontal
position.
3.Attachtheliftingequipmenttotherockboom,and
supporttheboom(Figure2).
Important:Ensurethattheliftingequipmenthas
aliftcapacityofatleast293kg(645lb)forthe122
cm(48inch)rockboomor320kg(705lb)fora152
cm(60inch)rockboom.
Figure2
4.Removethe2hex-headbolts(3/4x2-1/2inch),2
washers,and2serrated-angenutsattheverticalholes
inthemountingplateandtheboom-mounttting
(Figure3).
2
Figure3
1.Locknut(3/4inch)6.Washer(1inch)
2.Serrated-angenut(3/4
inch)
7.Boom-mounttting
(trencher)
3.Hex-headbolts(3/4x
2-1/2inch)
8.Mountingplate(rock
boom)
4.Washer(3/4inch)9.Hex-headbolts(1x2-1/2
inch)
5.Flangelocknut(1inch)
5.Removethe2hex-headbolts(3/4x2-1/2inch),2
washers,and2locknutsatthehorizontalholesinthe
mountingplateandtheboom-mounttting(Figure3).
6.Removethe2horizontalbolts(1x2-1/2inch),
4washers(1inch),and2locknuts(1inch)atthe
horizontalholesinthemountingplateandthe
boom-mounttting(Figure3).
Note:Retaintheboltswashersandnutsforinstalling
theassembledrockboomandextension.
7.Movetheboomawayfromthetrenchertoprovide
clearanceforattachingtheboomextensiontothe
boom.
4
AssemblingtheBoom
ExtensiontotheRockBoom
Partsneededforthisprocedure:
1Boomextension
2
Bolt(1x2-1/2inch)
2
Washer(1inch)
2
Locknut(1inch)
4
Bolt(3/4x2-1/2inch)
4
Washer(3/4inch)
4
Locknut(3/4inch)
Procedure
Boom-extensionweight:81kg(179lb)
Note:Usethebolts,washers,andnutsfromthe
boom-extensionkittoassembletheboomextensiontothe
rockboom.
1.Aligntheholesintheboomextensionwiththeholes
intherockboomasshowninFigure4.
Figure4
1.Washer(3/4inch)—12
inchboomextensionkit
4.Mountingplate(boom
extension)
2.Bolt(3/4x2-1/2inch)—12
inchboomextensionkit
5.Boom-mounttting
(trencher)
3.Locknut(3/4inch)—12
inchboomextensionkit
2.Applythread-lockingcompoundtothethreadsofthe
4bolts(1x2-1/2inch)and2bolts(1x2-1/2inch).
3.Assemblethe2bolts(3/4x2-1/2inch),2washers
(3/4inch),and2locknuts(3/4inch)atthevertical
holesinthemountingplatefortheboomextension
andthemountingplatefortherockboom(Figure4).
4.Assemblethe2bolts(3/4x2-1/2inch),2washers
(3/4inch),and2locknuts(3/4inch)atthehorizontal
3
holesinthemountingplatefortheboomextension
andthemountingplatefortherockboom(Figure4).
5.Assemblethe2bolts(1x2-1/2inch),4washers(1
inch),and2locknuts(1inch)atthehorizontalholesin
themountingplatefortheboomextensionandthe
mountingplatefortherockboom(Figure4).
6.Tightentheboltsandlocknutsbyhand.
5
InstallingtheBoomExtension
andRockBoom
NoPartsRequired
Procedure
122cm(48inch)Rockboom
weightwithextension:
293kg(645lb)
152cm(60inch)Rockboom
weightwithextension:
320kg(705lb)
Note:Ifyouareinstallingacentertrencheralongwiththe
12-inchboomextension,usethebolts,washers,andnuts
fromthecenter-trencherkittoassemblethe12-inchboom
extensionandrockboomtothetrencher;refertotheoperator’s
manuallforthecentertrencher.Ifyouremovedtherock
boomfromanexistingtrencherinstallation,usethehardware
youremovedin3RemovingtheBoom(page2)toinstallthe
12-inchboomextensionandrockboom.
1.Starttheengineofthemachine;refertothetraction
unitOperator’sManual.
2.Ensurethattheboommountttingforthetrencheris
inthehorizontalposition(Figure5).
Note:Ifneeded,usetheattachment-elevationswitch
tomovethemounttting.
Figure5
1.Boom-mountingttingonthetrencher
3.Ensurethattheextensionandrockboomarelevel
(Figure6).
Important:Ensurethattheliftingequipmenthas
aliftcapacityofatleast293kg(645lb)forthe122
cm(48inch)rockboomor320kg(705lb)fora152
cm(60inch)rockboom.
Figure6
1.Boom-mountttingonthe
trencher
2.Mountingplateonthe
boom
4.Positiontheboomextensionandrockboomsothat
themountingplateoftheextensionisushwiththe
boom-mountttingonthetrencher,andtheholesin
theplatearealignedwiththeholesinthetting(Figure
6).
5.Applymedium-gradethread-lockingcompoundtothe
4hex-headbolts(3/4x2-1/2inch).
Note:Formachineswithanexistingtrencherinstalled,
refertosteps4and5of3RemovingtheBoom(page
2).
6.Install2hex-headbolts(3/4x2-1/2inch),washers,
andnutsintotheverticalholesinthemountingplate
andtheboom-mounttting(Figure7).
4
Figure7
1.Hex-headbolts(3/4x
2-1/2inch)—optional
centertrencherkit
4.Locknut(3/4
inch)—optionalcenter
trencherkit
2.Washer(3/4
inch)—optionalcenter
trencherkit
5.Boom-mounttting
(trencher)
3.Serrated-angenut(3/4
inch)—optionalcenter
trencherkit
6.Mountingplate(boom
extension)
7.Install2hex-headbolts(3/4x2-1/2inch),washers,
andnutsintothehorizontalholesinthemounting
plateandtheboom-mounttting(Figure7).
Note:Ensurethatthemountingplateontheboom
extensionisushwiththeboom-mountttingonthe
trencher.
8.Torquetheboltsandnutsthatsecurethe
extension-mountingplatetotheboom-mounttting
forthetrencherto203N-m(150lb-ft).
9.Torquetheboltsandnutsthatsecurethemounting
plateoftherockboomtothemountttingofthe
boomextensionto203N-m(150lb-ft).
10.Removetheliftingequipment.
6
AligningtheBoom
Partsneededforthisprocedure:
3
Shim(centertrencherkit)
3
Shim(12inchboomextensionkit)
AligningtheBoomattheBoom-Mount
FittingandBoomExtension
Installerprovidedtool:straightedge—152cm(60inch)for
the48-inchrockboomandextension;274cm(108inch)for
the60-inchrockboomandextension.
1.Alignastraightedgeagainstthedrivesprocketforthe
diggingchainandacrosstheendroller(Figure8).
Figure8
Leftoffsetshown
1.DimensionAgap
3.Straightedge—152cm
(60inch)forthe48-inch
rockboomandextension;
274cm(108inch)forthe
60-inchrockboomand
extension
2.Endroller
4.Drivesprocket(digging
chain)
2.Checkthealignmentoftheextensionandboomas
showninFigure8,andrecordyourmeasurementsin
theAlignmentWorksheetbelow:
Left-offsetboom:Iftheboomisalignedtothe
leftofthesprocketcenterline,placeastraight
edgeacrosstherightfaceofthedrivesprocket
andmeasurethegap(dimensionA)betweenthe
5
straightedgeandtheendroller(Figure8and
Figure9).
Right-offsetboom:Iftheboomisalignedtothe
rightofthesprocketcenterline,placeastraight
edgeacrosstheleftfaceofthedrivesprocket
andmeasurethegap(dimensionA)betweenthe
straightedgeandtheendroller(Figure8and
Figure9).
Nooffset:Theboomisaligned.
Note:IfthemeasureddimensionAgapis0to
4.8mm(0to0.1875inch),skiptostep8.
AlignmentWorksheet
YourMeasurement(leftor
rightdimensionA)
Maximum-offsetGap4.8mm(0.1875inch)
Shim-correctionDimension
Figure9
1.Endroller(leftoffset)3.Endroller(rightoffset)
2.Sprocketcenterline
3.Usingthealignmentworksheet,determinethe
numberofshimsthatyouneedbysubtractingthe
maximum-offsetgapof4.8mm(0.1875inch)from
yourmeasurement(dimensionA).
Note:Theresultistheshim-correctiondimension.
4.Usetheshimtable(boom-mountttingandboom
extension)todeterminethenumberofshimsneeded
toaligntheboomwithinthe4.8mm(0.1875inch)
maximum-offsetgap.
Important:Iftheshim-correctiondimension
exceedsthefollowingdimensionsfortheshims
attheboom-mountttingandboomextension,
completesteps5through10andperformthesteps
inAligningtheBoomattheBoomExtensionand
RockBoom(page7)
Largerthan29.5mm(1.16inch)fora122cm(48
inch)rockboomwithboomextension.
Largerthan30.1mm(1.39inch)fora152cm(60
inch)rockboomwithboomextension.
ShimTable—Boom-MountFittingandBoom
Extension
NumberofShims
forCorrection
122cm(48inch)
RockBoomwith
BoomExtension
Shim-correction
Dimension
152cm(60inch)
RockBoomwith
BoomExtension
Shim-correction
Dimension
1
9.4mm(0.37inch)9.6mm(0.44inch)
2
19.6mm(0.77
inch)
20mm(0.92inch)
3
29.5mm(1.16
inch)
30.1mm(1.39
inch)
5.Installtheliftingequipmenttotheboomandsupport
it.
6.Attheboom-mountttingforthetrencherandthe
mountingplatefortheboomextension,loosenthe4
hex-headbolts(3/4x2-1/2inch)andnuts(Figure10).
6
Figure10
Shiminstallationforaleft-offsetboom(boom-mounttting
andboomextension)
1.Hex-headbolts(3/4x
2-1/2inch)
6.Flangelocknut(1
inch)—optionalcenter
trencherkit
2.Serrated-angenut(3/4
inch)
7.Shim(s)—optionalcenter
trencherkit
3.Locknut(3/4inch)8.Boom-mounttting
(trencher)
4.Washer(1inch)—optional
centertrencherkit
9.Mountingplate(boom
extension)
5.Hex-headbolts(1x2-1/2
inch)—optionalcenter
trencherkit
7.Inserttheshimsasfollows:
Foraleft-offsetboom,sliptheshimsbetweenthe
boom-mounttting(trencher)andthemounting
plate(boomextension)attheleftside(Figure10).
Forarightoffsetboom,sliptheshimsbetween
theboom-mountttingandthemountingplateat
therightside(Figure10).
Note:Ensurethattheslotsintheshimalignwiththe
horizontalhex-headbolt(3/4x2-1/2inch)andthe25
mm(1inch)holesbelowthebolt.
8.Applythread-lockingcompoundtothe2horizontal
bolts(1x2-1/2inch).
9.Assemblethe2horizontalbolts(1x2-1/2inch)and2
washerstothehorizontalholesinthemountttingand
mountingplate,andtightenthembyhand(Figure10).
Note:Ifyouuseshimstocorrecttheoffsetgap,
ensurethattheslotsintheshimsarealignedtobothof
thehorizontalbolts.
10.Torquethe4bolts(3/4x2-1/2inch)439to462N-m
(324to341ft-lb).
Torquethe2bolts(1x2-1/2inch)609to641N-m
(449to473ft-lb).
11.Iftheboomisaligned,performsteps1through4in
InstallingtheBoltsfortheBoomExtensionandRock
Boom(page8).
AligningtheBoomattheBoom
ExtensionandRockBoom
1.Alignastraightedgeagainstthedrivesprocketforthe
diggingchainandacrosstheendroller;refertoFigure
8inAligningtheBoomattheBoom-MountFitting
andBoomExtension(page5).
2.Checkthealignmentoftheextensionandboom
asshowninFigure8ofAligningtheBoomatthe
Boom-MountFittingandBoomExtension(page5),
andrecordyourmeasurementsintheAlignment
Worksheetbelow:
Left-offsetboom:Iftheboomisalignedtothe
leftofthesprocketcenterline,placeastraight
edgeacrosstherightfaceofthedrivesprocket
andmeasurethegap(dimensionA)betweenthe
straightedgeandtheendroller;refertoFigure
8andFigure9inAligningtheBoomatthe
Boom-MountFittingandBoomExtension(page
5).
Right-offsetboom:Iftheboomisalignedtothe
rightofthesprocketcenterline,placeastraight
edgeacrosstheleftfaceofthedrivesprocketand
measurethegap(dimensionA)betweenthestraight
edgeandtheendroller;refertoFigure8and
Figure9inAligningtheBoomattheBoom-Mount
FittingandBoomExtension(page5).
AlignmentWorksheet
YourMeasurement(leftor
rightdimensionA)
Maximum-offsetGap4.8mm(0.1875inch)
Shim-correctionDimension
3.Usingthealignmentworksheet,determinethe
numberofshimsthatyouneedbysubtractingthe
maximum-offsetgapof4.8mm(0.1875inch)from
yourmeasurement(dimensionA).
Note:Theresultistheshim-correctiondimension.
4.Usetheshimtable(boomextensionandrockboom)
todeterminethenumberofshimsneededtoalignthe
boomwithinthe4.8mm(0.1875inch)maximum-offset
gap.
7
ShimTable—BoomExtensionandRockBoom
NumberofShims
forCorrection
122cm(48inch)
RockBoomwith
BoomExtension
Shim-correction
Dimension
152cm(60inch)
RockBoomwith
BoomExtension
Shim-correction
Dimension
1
7.1mm(0.28inch)9.4mm(0.37inch)
2
14.5mm(0.57
inch)
19.6mm(0.77
inch)
3
21.8mm(0.86
inch)
29.5mm(1.16
inch)
5.Installtheliftingequipmenttotheboomandsupport
it.
6.Atthemountttingfortheboom-extensionand
themountingplatefortherockboom,loosenthe4
hex-headbolts(3/4x2-1/2inch)andnuts(Figure11).
Figure11
Shiminstallationforaleft-offsetboom(boomextension
androckboom)
1.Serrated-angenut(3/4
inch)
6.Flangelocknut(1
inch)—12inchboom
extensionkit
2.Hex-headbolts(3/4x
2-1/2inch)
7.Shim(s)—12inchboom
extensionkit
3.Locknut(3/4inch)8.Mountingtting(boom
extension)
4.Washer(1inch)—12inch
boomextensionkit
9.Mountplate(rockboom)
5.Hex-headbolts(1x2-1/2
inch)—12inchboom
extensionkit
7.Inserttheshimsasfollows:
Foraleft-offsetboom,sliptheshimsbetween
theboom-mounttting(trencher)andthe
mountingplate(boomextension)attheleftside;
refertoFigure10inAligningtheBoomatthe
Boom-MountFittingandBoomExtension(page
5).
Forarightoffsetboom,sliptheshimsbetweenthe
boom-mountttingandthemountingplateatthe
rightside;refertoFigure10inAligningtheBoom
attheBoom-MountFittingandBoomExtension
(page5).
Note:Ensurethattheslotsintheshimalignwiththe
horizontalhex-headbolt(3/4x2-1/2inch)andthe25
mm(1inch)holesbelowthebolt.
InstallingtheBoltsfortheBoom
ExtensionandRockBoom
1.Applythread-lockingcompoundtothe2horizontal
bolts(1x2-1/2inch).
2.Atthemountttingfortheboom-extensionand
themountingplatefortherockboom,assemblethe
horizontalbolt(1x2-1/2inch)andlocknuttothe
horizontalholeinthemountttingandmounting
plate,andtightenthembyhand(Figure11).
Note:Ifyouuseshimstocorrecttheoffsetgap,
ensurethattheslotsintheshimsarealignedtobothof
thehorizontalbolts.
3.Torquethe4bolts(3/4x2-1/2inch)439to462N-m
(324to341ft-lb).
4.Torquethe2bolts(1x2-1/2inch)609to641N-m
(449to473ft-lb).
7
FinishingtheBoomExtension
andBoomInstallation
NoPartsRequired
InstallingtheDiggingChain
Installthediggingchain;refertoInstallingtheDiggingChain
intheMaintenancesectionofthecentertrencherOperator’s
ManualfortheRT1200tractionunit.
InstallingtheRestrainBarorCrumber
Installtherestraintbar;refertotheInstallingtheRestraint
BarsetupprocedureinthecentertrencherOperator’s
ManualfortheRT1200tractionunit.
Installthecrumber;refertothe4ftand5ftManual
CrumbersInstallationInstructionsfortheRT1200trencher.
8
Notes:
9
Notes:
10
Notes:
11
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12