  • Hello! I am an AI chatbot trained to assist you with the Toro 12in Boom Extension, RT1200 Trencher Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FormNo.3394-809RevB
12inBoomExtension
RT1200Trencher
ModelNo.25513
ModelNo.25513E
InstallationInstructions
WARNING
CALIFORNIA
Proposition65Warning
ThisproductcontainsachemicalorchemicalsknowntotheStateofCaliforniato
causecancer,birthdefects,orreproductiveharm.
WARNING
Whentheengineisoff,attachmentsintheraisedpositioncangraduallylower.Someonebelowthe
attachmentmaybepinnedorinjuredbytheattachmentasitlowers.
Alwayslowertheattachmenteachtimeyoushutoffthetractionunit.
Installation
1
PreparingtoInstalltheBoom
Extension
NoPartsRequired
PreparingtheMachine
1.Movethemachinetoalevelsurfacethatisbelowthe
liftingequipment.
2.Lowerallattachments.
3.Ensurethatthetiltfeatureofthemachineisleveland
thetilt-lockoutpinissecuretothechassis-lockout
bracket;refertotheOperator’sManualforthemachine.
4.Shutoffthemachine,settheparkingbrake,and
removethekeyfromthekeyswitch.
PreparingaNewCenterTrencher
Note:Refertothefollowingsetupproceduresinthecenter
trencherOperator’sManualfortheRT1200tractionunit.
1.PreparingtoInstalltheTrencher
2.InstallingtheSpeed-ShiftSwitch
3.InstallingtheTrencherAttachment
4.PreparingtheHydraulicMotor
5.ConnectingtheLiftCylinderHoses
6.InstallingtheHydraulicHoses
7.ConnectingtheWiringHarnesstotheHydraulicMotor
8.PurgingAirfromtheHydraulicMotorandLift
Cylinder
9.InstallingtheSprocket
10.InstallingtheAuger
©2015—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.T oro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3394-809*B
2
RemovingtheDiggingChain
NoPartsRequired
Procedure
Machineswithaninstalledtrencher
Restraintbarweightfora
122cm(48inch)rockboom
11kg(24lb)
Restraintbarweightfora
152cm(60inch)rockboom
14kg(30lb)
Crumberweightfora122
cm(48inch)rockboom
60kg(125lb)
Crumberweightfora152
cm(60inch)rockboom
68kg(151lb)
1.Useliftingequipmentasneededtosupporttherestraint
barorcrumber.
2.Removethe4bolts(5/8x11inch)and4locknuts
(5/8inch)thatsecuretherestraintbarorcrumber,and
removethebar(Figure1).
Figure1
1.Locknut(5/8inch)
3.Bar-mountingplates
2.Bolt(5/8x11inch)4.Restraintbar(shown)
3.Removethediggingchain;refertotheRemovingthe
DiggingChainprocedureintheMaintenancesection
ofthecentertrencherOperator’sManualfortheRT1200
tractionunit.
3
RemovingtheBoom
NoPartsRequired
Procedure
Machineswithaninstalledtrencher
122cm(48inch)rockboom
weight
212kg(466lb)
152cm(60inch)rockboom
weight
239kg(526lb)
1.Starttheengineofthemachine;refertothetraction
unitOperator’sManual.
2.Usetheattachment-elevationswitchtomovethe
boom-mountttingofthetrenchertothehorizontal
position.
3.Attachtheliftingequipmenttotherockboom,and
supporttheboom(Figure2).
Important:Ensurethattheliftingequipmenthas
aliftcapacityofatleast293kg(645lb)forthe122
cm(48inch)rockboomor320kg(705lb)fora152
cm(60inch)rockboom.
Figure2
4.Removethe2hex-headbolts(3/4x2-1/2inch),2
washers,and2serrated-angenutsattheverticalholes
inthemountingplateandtheboom-mounttting
(Figure3).
2
Figure3
1.Locknut(3/4inch)6.Washer(1inch)
2.Serrated-angenut(3/4
inch)
7.Boom-mounttting
(trencher)
3.Hex-headbolts(3/4x
2-1/2inch)
8.Mountingplate(rock
boom)
4.Washer(3/4inch)9.Hex-headbolts(1x2-1/2
inch)
5.Flangelocknut(1inch)
5.Removethe2hex-headbolts(3/4x2-1/2inch),2
washers,and2locknutsatthehorizontalholesinthe
mountingplateandtheboom-mounttting(Figure3).
6.Removethe2horizontalbolts(1x2-1/2inch),
4washers(1inch),and2locknuts(1inch)atthe
horizontalholesinthemountingplateandthe
boom-mounttting(Figure3).
Note:Retaintheboltswashersandnutsforinstalling
theassembledrockboomandextension.
7.Movetheboomawayfromthetrenchertoprovide
clearanceforattachingtheboomextensiontothe
boom.
4
AssemblingtheBoom
ExtensiontotheRockBoom
Partsneededforthisprocedure:
1Boomextension
2
Bolt(1x2-1/2inch)
2
Washer(1inch)
2
Locknut(1inch)
4
Bolt(3/4x2-1/2inch)
4
Washer(3/4inch)
4
Locknut(3/4inch)
Procedure
Boom-extensionweight:81kg(179lb)
Note:Usethebolts,washers,andnutsfromthe
boom-extensionkittoassembletheboomextensiontothe
rockboom.
1.Aligntheholesintheboomextensionwiththeholes
intherockboomasshowninFigure4.
Figure4
1.Washer(3/4inch)—12
inchboomextensionkit
4.Mountingplate(boom
extension)
2.Bolt(3/4x2-1/2inch)—12
inchboomextensionkit
5.Boom-mounttting
(trencher)
3.Locknut(3/4inch)—12
inchboomextensionkit
2.Applythread-lockingcompoundtothethreadsofthe
4bolts(1x2-1/2inch)and2bolts(1x2-1/2inch).
3.Assemblethe2bolts(3/4x2-1/2inch),2washers
(3/4inch),and2locknuts(3/4inch)atthevertical
holesinthemountingplatefortheboomextension
andthemountingplatefortherockboom(Figure4).
4.Assemblethe2bolts(3/4x2-1/2inch),2washers
(3/4inch),and2locknuts(3/4inch)atthehorizontal
3
holesinthemountingplatefortheboomextension
andthemountingplatefortherockboom(Figure4).
5.Assemblethe2bolts(1x2-1/2inch),4washers(1
inch),and2locknuts(1inch)atthehorizontalholesin
themountingplatefortheboomextensionandthe
mountingplatefortherockboom(Figure4).
6.Tightentheboltsandlocknutsbyhand.
5
InstallingtheBoomExtension
andRockBoom
NoPartsRequired
Procedure
122cm(48inch)Rockboom
weightwithextension:
293kg(645lb)
152cm(60inch)Rockboom
weightwithextension:
320kg(705lb)
Note:Ifyouareinstallingacentertrencheralongwiththe
12-inchboomextension,usethebolts,washers,andnuts
fromthecenter-trencherkittoassemblethe12-inchboom
extensionandrockboomtothetrencher;refertotheoperator’s
manuallforthecentertrencher.Ifyouremovedtherock
boomfromanexistingtrencherinstallation,usethehardware
youremovedin3RemovingtheBoom(page2)toinstallthe
12-inchboomextensionandrockboom.
1.Starttheengineofthemachine;refertothetraction
unitOperator’sManual.
2.Ensurethattheboommountttingforthetrencheris
inthehorizontalposition(Figure5).
Note:Ifneeded,usetheattachment-elevationswitch
tomovethemounttting.
Figure5
1.Boom-mountingttingonthetrencher
3.Ensurethattheextensionandrockboomarelevel
(Figure6).
Important:Ensurethattheliftingequipmenthas
aliftcapacityofatleast293kg(645lb)forthe122
cm(48inch)rockboomor320kg(705lb)fora152
cm(60inch)rockboom.
Figure6
1.Boom-mountttingonthe
trencher
2.Mountingplateonthe
boom
4.Positiontheboomextensionandrockboomsothat
themountingplateoftheextensionisushwiththe
boom-mountttingonthetrencher,andtheholesin
theplatearealignedwiththeholesinthetting(Figure
6).
5.Applymedium-gradethread-lockingcompoundtothe
4hex-headbolts(3/4x2-1/2inch).
Note:Formachineswithanexistingtrencherinstalled,
refertosteps4and5of3RemovingtheBoom(page
2).
6.Install2hex-headbolts(3/4x2-1/2inch),washers,
andnutsintotheverticalholesinthemountingplate
andtheboom-mounttting(Figure7).
4
Figure7
1.Hex-headbolts(3/4x
2-1/2inch)—optional
centertrencherkit
4.Locknut(3/4
inch)—optionalcenter
trencherkit
2.Washer(3/4
inch)—optionalcenter
trencherkit
5.Boom-mounttting
(trencher)
3.Serrated-angenut(3/4
inch)—optionalcenter
trencherkit
6.Mountingplate(boom
extension)
7.Install2hex-headbolts(3/4x2-1/2inch),washers,
andnutsintothehorizontalholesinthemounting
plateandtheboom-mounttting(Figure7).
Note:Ensurethatthemountingplateontheboom
extensionisushwiththeboom-mountttingonthe
trencher.
8.Torquetheboltsandnutsthatsecurethe
extension-mountingplatetotheboom-mounttting
forthetrencherto203N-m(150lb-ft).
9.Torquetheboltsandnutsthatsecurethemounting
plateoftherockboomtothemountttingofthe
boomextensionto203N-m(150lb-ft).
10.Removetheliftingequipment.
6
AligningtheBoom
Partsneededforthisprocedure:
3
Shim(centertrencherkit)
3
Shim(12inchboomextensionkit)
AligningtheBoomattheBoom-Mount
FittingandBoomExtension
Installerprovidedtool:straightedge—152cm(60inch)for
the48-inchrockboomandextension;274cm(108inch)for
the60-inchrockboomandextension.
1.Alignastraightedgeagainstthedrivesprocketforthe
diggingchainandacrosstheendroller(Figure8).
Figure8
Leftoffsetshown
1.DimensionAgap
3.Straightedge—152cm
(60inch)forthe48-inch
rockboomandextension;
274cm(108inch)forthe
60-inchrockboomand
extension
2.Endroller
4.Drivesprocket(digging
chain)
2.Checkthealignmentoftheextensionandboomas
showninFigure8,andrecordyourmeasurementsin
theAlignmentWorksheetbelow:
Left-offsetboom:Iftheboomisalignedtothe
leftofthesprocketcenterline,placeastraight
edgeacrosstherightfaceofthedrivesprocket
andmeasurethegap(dimensionA)betweenthe
5
straightedgeandtheendroller(Figure8and
Figure9).
Right-offsetboom:Iftheboomisalignedtothe
rightofthesprocketcenterline,placeastraight
edgeacrosstheleftfaceofthedrivesprocket
andmeasurethegap(dimensionA)betweenthe
straightedgeandtheendroller(Figure8and
Figure9).
Nooffset:Theboomisaligned.
Note:IfthemeasureddimensionAgapis0to
4.8mm(0to0.1875inch),skiptostep8.
AlignmentWorksheet
YourMeasurement(leftor
rightdimensionA)
Maximum-offsetGap4.8mm(0.1875inch)
Shim-correctionDimension
Figure9
1.Endroller(leftoffset)3.Endroller(rightoffset)
2.Sprocketcenterline
3.Usingthealignmentworksheet,determinethe
numberofshimsthatyouneedbysubtractingthe
maximum-offsetgapof4.8mm(0.1875inch)from
yourmeasurement(dimensionA).
Note:Theresultistheshim-correctiondimension.
4.Usetheshimtable(boom-mountttingandboom
extension)todeterminethenumberofshimsneeded
toaligntheboomwithinthe4.8mm(0.1875inch)
maximum-offsetgap.
Important:Iftheshim-correctiondimension
exceedsthefollowingdimensionsfortheshims
attheboom-mountttingandboomextension,
completesteps5through10andperformthesteps
inAligningtheBoomattheBoomExtensionand
RockBoom(page7)
Largerthan29.5mm(1.16inch)fora122cm(48
inch)rockboomwithboomextension.
Largerthan30.1mm(1.39inch)fora152cm(60
inch)rockboomwithboomextension.
ShimTable—Boom-MountFittingandBoom
Extension
NumberofShims
forCorrection
122cm(48inch)
RockBoomwith
BoomExtension
Shim-correction
Dimension
152cm(60inch)
RockBoomwith
BoomExtension
Shim-correction
Dimension
1
9.4mm(0.37inch)9.6mm(0.44inch)
2
19.6mm(0.77
inch)
20mm(0.92inch)
3
29.5mm(1.16
inch)
30.1mm(1.39
inch)
5.Installtheliftingequipmenttotheboomandsupport
it.
6.Attheboom-mountttingforthetrencherandthe
mountingplatefortheboomextension,loosenthe4
hex-headbolts(3/4x2-1/2inch)andnuts(Figure10).
6
Figure10
Shiminstallationforaleft-offsetboom(boom-mounttting
andboomextension)
1.Hex-headbolts(3/4x
2-1/2inch)
6.Flangelocknut(1
inch)—optionalcenter
trencherkit
2.Serrated-angenut(3/4
inch)
7.Shim(s)—optionalcenter
trencherkit
3.Locknut(3/4inch)8.Boom-mounttting
(trencher)
4.Washer(1inch)—optional
centertrencherkit
9.Mountingplate(boom
extension)
5.Hex-headbolts(1x2-1/2
inch)—optionalcenter
trencherkit
7.Inserttheshimsasfollows:
Foraleft-offsetboom,sliptheshimsbetweenthe
boom-mounttting(trencher)andthemounting
plate(boomextension)attheleftside(Figure10).
Forarightoffsetboom,sliptheshimsbetween
theboom-mountttingandthemountingplateat
therightside(Figure10).
Note:Ensurethattheslotsintheshimalignwiththe
horizontalhex-headbolt(3/4x2-1/2inch)andthe25
mm(1inch)holesbelowthebolt.
8.Applythread-lockingcompoundtothe2horizontal
bolts(1x2-1/2inch).
9.Assemblethe2horizontalbolts(1x2-1/2inch)and2
washerstothehorizontalholesinthemountttingand
mountingplate,andtightenthembyhand(Figure10).
Note:Ifyouuseshimstocorrecttheoffsetgap,
ensurethattheslotsintheshimsarealignedtobothof
thehorizontalbolts.
10.Torquethe4bolts(3/4x2-1/2inch)439to462N-m
(324to341ft-lb).
Torquethe2bolts(1x2-1/2inch)609to641N-m
(449to473ft-lb).
11.Iftheboomisaligned,performsteps1through4in
InstallingtheBoltsfortheBoomExtensionandRock
Boom(page8).
AligningtheBoomattheBoom
ExtensionandRockBoom
1.Alignastraightedgeagainstthedrivesprocketforthe
diggingchainandacrosstheendroller;refertoFigure
8inAligningtheBoomattheBoom-MountFitting
andBoomExtension(page5).
2.Checkthealignmentoftheextensionandboom
asshowninFigure8ofAligningtheBoomatthe
Boom-MountFittingandBoomExtension(page5),
andrecordyourmeasurementsintheAlignment
Worksheetbelow:
Left-offsetboom:Iftheboomisalignedtothe
leftofthesprocketcenterline,placeastraight
edgeacrosstherightfaceofthedrivesprocket
andmeasurethegap(dimensionA)betweenthe
straightedgeandtheendroller;refertoFigure
8andFigure9inAligningtheBoomatthe
Boom-MountFittingandBoomExtension(page
5).
Right-offsetboom:Iftheboomisalignedtothe
rightofthesprocketcenterline,placeastraight
edgeacrosstheleftfaceofthedrivesprocketand
measurethegap(dimensionA)betweenthestraight
edgeandtheendroller;refertoFigure8and
Figure9inAligningtheBoomattheBoom-Mount
FittingandBoomExtension(page5).
AlignmentWorksheet
YourMeasurement(leftor
rightdimensionA)
Maximum-offsetGap4.8mm(0.1875inch)
Shim-correctionDimension
3.Usingthealignmentworksheet,determinethe
numberofshimsthatyouneedbysubtractingthe
maximum-offsetgapof4.8mm(0.1875inch)from
yourmeasurement(dimensionA).
Note:Theresultistheshim-correctiondimension.
4.Usetheshimtable(boomextensionandrockboom)
todeterminethenumberofshimsneededtoalignthe
boomwithinthe4.8mm(0.1875inch)maximum-offset
gap.
7
ShimTable—BoomExtensionandRockBoom
NumberofShims
forCorrection
122cm(48inch)
RockBoomwith
BoomExtension
Shim-correction
Dimension
152cm(60inch)
RockBoomwith
BoomExtension
Shim-correction
Dimension
1
7.1mm(0.28inch)9.4mm(0.37inch)
2
14.5mm(0.57
inch)
19.6mm(0.77
inch)
3
21.8mm(0.86
inch)
29.5mm(1.16
inch)
5.Installtheliftingequipmenttotheboomandsupport
it.
6.Atthemountttingfortheboom-extensionand
themountingplatefortherockboom,loosenthe4
hex-headbolts(3/4x2-1/2inch)andnuts(Figure11).
Figure11
Shiminstallationforaleft-offsetboom(boomextension
androckboom)
1.Serrated-angenut(3/4
inch)
6.Flangelocknut(1
inch)—12inchboom
extensionkit
2.Hex-headbolts(3/4x
2-1/2inch)
7.Shim(s)—12inchboom
extensionkit
3.Locknut(3/4inch)8.Mountingtting(boom
extension)
4.Washer(1inch)—12inch
boomextensionkit
9.Mountplate(rockboom)
5.Hex-headbolts(1x2-1/2
inch)—12inchboom
extensionkit
7.Inserttheshimsasfollows:
Foraleft-offsetboom,sliptheshimsbetween
theboom-mounttting(trencher)andthe
mountingplate(boomextension)attheleftside;
refertoFigure10inAligningtheBoomatthe
Boom-MountFittingandBoomExtension(page
5).
Forarightoffsetboom,sliptheshimsbetweenthe
boom-mountttingandthemountingplateatthe
rightside;refertoFigure10inAligningtheBoom
attheBoom-MountFittingandBoomExtension
(page5).
Note:Ensurethattheslotsintheshimalignwiththe
horizontalhex-headbolt(3/4x2-1/2inch)andthe25
mm(1inch)holesbelowthebolt.
InstallingtheBoltsfortheBoom
ExtensionandRockBoom
1.Applythread-lockingcompoundtothe2horizontal
bolts(1x2-1/2inch).
2.Atthemountttingfortheboom-extensionand
themountingplatefortherockboom,assemblethe
horizontalbolt(1x2-1/2inch)andlocknuttothe
horizontalholeinthemountttingandmounting
plate,andtightenthembyhand(Figure11).
Note:Ifyouuseshimstocorrecttheoffsetgap,
ensurethattheslotsintheshimsarealignedtobothof
thehorizontalbolts.
3.Torquethe4bolts(3/4x2-1/2inch)439to462N-m
(324to341ft-lb).
4.Torquethe2bolts(1x2-1/2inch)609to641N-m
(449to473ft-lb).
7
FinishingtheBoomExtension
andBoomInstallation
NoPartsRequired
InstallingtheDiggingChain
Installthediggingchain;refertoInstallingtheDiggingChain
intheMaintenancesectionofthecentertrencherOperator’s
ManualfortheRT1200tractionunit.
InstallingtheRestrainBarorCrumber
Installtherestraintbar;refertotheInstallingtheRestraint
BarsetupprocedureinthecentertrencherOperator’s
ManualfortheRT1200tractionunit.
Installthecrumber;refertothe4ftand5ftManual
CrumbersInstallationInstructionsfortheRT1200trencher.
8
Notes:
9
Notes:
10
Notes:
11
/