FLEXCO FGP Flange Bearing Mount Operating instructions

  • I've reviewed the instructions for the FLEXCO Bearing Mount 56586 installation. This document guides you through the process of installing the optional mounting bracket, ensuring proper alignment and secure attachment. I am ready to answer any questions you might have about the installation process, including bracket positioning, affixing methods, and cleaner installation.
  • What is the document about?
    Should I use this document for full installation details?
    What are the options to permanently affix bracket?
FGP Flange Bearing Mount (56586)
Instructions
2525 Wisconsin Avenue • Downers Grove, IL 60515-4200 U.S.A.
Telephone: 1-630-971-0150 • Fax: 1-630-971-1180 • E-mail: info@flexco.com
Visit www.flexco.com for other Flexco locations and products.
©2018 Flexible Steel Lacing Company. 02-28-18. For Reorder: X5014
1. Reference FGP Food Grade Precleaner IOM (X3646) for full installation details. is sheet is only to guide the installation of the optional
mounting bracket.
2. Position rst bracket so FGP Pole center is at correct XYC position (Fig. A).
3. Trim bracket as necessary, then temporarily clamp or tack-weld bracket in place. is will allow for future adjustments.
4. Temporarily mount 2nd bracket onto the opposite side of
conveyor (Fig. B).
5. Test t cleaner without blade. Pole should be parallel to
the pulley (Fig. C).
6. If the pole is in the correct position, then permanently ax brackets using one of the following options:
• Drill thru-holes through bearing block and use bearing bolts to secure brackets
• Weld brackets to conveyor structure
• Bolt to conveyor structure using separate bolts
7. Install cleaner and tension blade appropriately (Fig. D).
Fig. A
Fig. B Fig. C
Fig. D
/