Bin • RIDE Technology Maestro Plus
9
6. Transport tube installation
Incorrecticetransporttubeinstallationcanresultinweticeanddispensingproblems.Followguidelinesbelow
toensurecorrectinstallation.Callfactoryforassistanceifyouareunabletomeettheserequirements.
6.1 General requirements
§ Maximumlengthoftuberun–20ft(6m).Factoryapprovalrequiredforlongerruns.
§ Runtubewithoutdips.
§ Onecontinuouslengthoftube;nosplices.
§ Minimumradiusofbendsintube–6"(15.3cm)insideradius.
§ Maximumnumberofbends–6.
§ Insulationonentirerunoficetube.
6.2 Procedure
1. Installsuppliedinsulationonentirelengthoftube.
2. Atshuttleactuator,pullinsulationbackfromtransporttubeandslipsuppliedhoseclampoverendof
transporttube.
3. Heatendoftransporttubeincupof160F(71C)hotwatertosoften➊andspreadwithpliers➋
beforemakingconnectiontoeaseassembly.
4. Pushtransporttubeontoshuttleactuatornozzle
➌
.
5. Positionclampbehindliponshuttleactuatornozzleandtightenclamp.
6. Runinsulatedtubewithoutdipsbetweenshuttleactuatoronbinandicemachineandsecureinplace.
7. Removeicemachinetoppanel.
8. Selectside,rearortopknockoutinicemachinecabinetfortubeentranceandinstallbushing.
9. Slideendoftransporttubeandinsulationthroughbushinginicemachineandruntonozzle.
10. Cuttubetothatlength.
11. Pullinsulationbackandslipsuppliedhoseclampoverendoftransporttube.
12. Heatendoftransporttubeincupof160F(71C)hotwatertosoften
➊andspreadwithpliers➋
beforemakingconnectiontoeaseassembly.
13. Pushtransporttubeontonozzle
➍
.
14. Positionclampbehindliponnozzleandtightenclamp.
install insulation on full run of tube
Evaporator
install clamp behind lip
on nozzle
bushing
➌
➍
Heat end of transport tube in cup of 160 F
(71 C) hot water to soften (1) and spread with
pliers before making connection (2).
➋
➊
SHUTTLE
ACTUATOR