Builders Edge 051010001002 Installation guide

Type
Installation guide
Shutter Hardware
Installation Instructions
-For new or existing shutters,
Kit Contains:
(4) Hinges
(2) "S" Hooks
(10) Screws
"S" Hook Hinge
Step 1
Determine where the hinges will be installed. Typically the hinges are installed
near the ends of the shutters. See Figure at right.
Note: If placing hinges over Shutter Loks, be sure the pilot holes don't interfere
with the Shutter Loks.
Step 2
Using the marks on the front of the hinges as guides, use an 1/8" drill bit and
drill pilot holes through the hinge and shutter.
Step 3
Securely attach the hinges to the shutter with the enclosed screws.
Hinge Installation
"S" Hook Installation
Step 1
Place the "S" Hook in the desired location. Normally the hooks are installed
at the bottom corner of the shutter. See Figure 1 at right.
Step 2
On the back of the "S" Hook is a fin. This is where the screw will be placed.
After the position of the "S" Hook is determined, use an 1/8" drill bit to drill
through the fin and into the bottom of the shutter.
Step 3
Securely attach the "S" Hook to the shutter using the screws provided.
Louver, Panel, or Board and Batten
  • Page 1 1

Builders Edge 051010001002 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI