5
STEP 6
Compare mantel depth
to chart to determine
the correct wall mount
height.
OPTION A: Wood Wall Installation
Use a pencil with drill template (U)
to mark drilling locations for wood
beam, and drill 2.2” deep holes
using 3/16” bit. Use of a stud finder
and level is recommended. Mount
wall plate (A) to wall using screws
(W-A) and washers (W-C). Do not
use anchors (W-B) for wood beam
installation.
OPTION B: Concrete/Brick Wall Installation
For concrete or brick wall installation, use a pencil with drill template (U) to mark drilling locations,
and drill 2.4” deep holes using a 3/8” bit. Use of a level is recommended. Mount wall plate (A) to wall
using screws (W-A), anchors (W-B), and washers (W-C).
x
y
Mantel Depth:
Required Installation Height:
Installa tion Standard
U
X
W-A
W-C
x
y
3
2
XX
√
11
2
1
XX
√
W-A
W-C
W-B
x
y