Dura-Trel 11197 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Dura-Trel 11197 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Model#
11197
Assembly Instructions
Part # Description
max 5 x 3.5
1 2" sq. x 84" Left Post
2 2" sq. x 84" Right Post
3 ⅞ x 1½ x 27½" Bottom Cross Rail
4 ⅞ x 1½ x 27½" Center Cross Rail
5 1 x 1 x 60" Vertical Rail
6 1½ x 4 x 72" Arbor Top Rail
7 ⅞ x 3 x 26¼" Arbor Top Cross Rail
8 ⅞ x 1½ x 72" Overhead Rail
9 Hardware Bag
(includes:)
4" Arbor Top End Cap
2" sq." Post Cap
⅞ x 1½" End Cap
¾" Painted Screw
Super Glue Tube
PLEASE READ THROUGH BEFORE BEGINNING ASSEMBLY.
10
Arbor Ground Anchor Kit (includes:)
IMPORTANT: Check boxes for Contents Listed
16" Steel Ground Anchor (L-Shaped)
Check inside of parts as some parts are packaged
#8 - 1" Painted Self Tapping Screw
inside of others
In the event of missing, damaged or defective parts
please call our customer service dept. at 1-877-258-6020
When assembling components, place on a clean, flat
non-abrasive surface to avoid scratches
Battery or Electric Drill with #2 phillips bit
Tape Measure
Hammer or Rubber Mallet (recommended)
Shovel or Post Hole Digger (recommended)
PVC, Super, or Crazy Glue
150 Birch Road
1
4
8
Bakersfield Arbor
3
2
6
4
6
2
8
Qty
2
General Information
4
1
6
24
1
4
Tools Required
1-877-258-6020
1
P.O. Box 122
Sheboygan Falls, WI 53085
www.dura-trel.com
sales@dura-trel.com
1
/