Push Side Panel Post untill the spacing appears even
between the inside of Post & the first Rafter with remaining
Rafters. (Figure 3.2)
Final adjustment to allow for a 40.5” opening between Posts
(minor variation is allowed).
Fasten Roof Rail to the Post by installing Screws & Snap
Cap Washer (as given in BOM) provided into 2-pre drilled
holes per Post. (Figure 3.3)
Press fit the End Caps as shown in Figure 3.4.
STEP 4: Arbor Footing Instructions
STEP 1: Assemble the Cover
Slide the Rafters through the holes in the Roof Rails in the
sequence as shown below. (Figure 1.1)
Ensure proper orientation of both the Rafter & the Roof Rails
as shown in Figure 1.2 (A & B).
To prevent the Rafters from shifting position install two screws
with snap cap and washer to both ends of Rafters as shown in
Figure 1.2 above.
STEP 2: Assemble the Side Panels
Layout the Bottom Side Rail horizontally & insert the Five Side
Pickets in the pockets as shown in Figure 2.1.
Insert the Top Side Rail over the ends of vertical Side Pickets.
Ensure a proper fit as shown in Figure 2.3.
Layout one Post horizontally & insert the Side panel into Post
as shown in Figure 2.4. All the pre-drilled holes should be
aligned.
Install one screw with snap cap and washer per hole.
Repeat the same procedure for the other Side Panel.
STEP 3: Connect the Top Half
to the Side Panels
Insert the assembled Roof Rails through the pockets at the top
of the Posts as shown. You will need a helper. (Figure 3.1)
Footing into the Ground
Arbor must be well secured to prevent tipping over from wind or other
loads. Four 2 x 3½" metal ground anchors have been provided for
securing the arbor either into the ground or a concrete footing. In
some cases it maybe acceptable to secure the arbor to an existing
structure such as a fence post. If installing your arbor on concrete
or a deck, visit your hardware store for the appropriate galvanized
bracketing hardware.
Insert the (2 x 3½¨) 4 metal ground anchors into the bottom
of the arbor post and secure with screws through the
predrilled holes. (Figure 4.1)
Move the arbor to its final location (2 people will be
needed). Set the Arbor and mark the positions of the posts,
then move the arbor aside and lay it carefully on it’s side.
Dig four holes approximately 6 x 18" deep. Move the arbor
back into position and level it both vertically and
horizontally. The bottom of the vinyl posts should insert
themselves approximately 4" below the ground level.
(Figure 4.2)
Fill the holes with the excavated soil to cover the ground
anchors. (Figure 4.2)
Figure 4.1
Metal Ground Anchor
Figure 4.2
6x18” deep hole
Soil