Astria Fireplaces MLDVTCD, Merit Contemporary, Merit Louverless, MHD35/MHD40, MLDVT, SLDVT Instruction Sheet

  • Hello! I am an AI chatbot trained to assist you with the Astria Fireplaces MLDVTCD Instruction Sheet. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
IHP.us.com 750237M
1
506019-51 Rev. A 03/2015
1508 Elm Hill Pike, Suite 108
Nashville, TN 37210
IHP.us.com
P506019-51
NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE. 1
GENERAL INFORMATION
FBK-300
BLOWER KIT
This blower kit may be used with gas fireplaces. The FBK-300 blower
kit is used when unit-mounted variable speed blower control is desired.
The blower is installed beneath the firebox. Room air is drawn in through
the bottom area of the fireplace, heated as it passes across the firebox,
and discharged through the upper air exhaust area at the top of the
fireplace. This kit contains one blower, one speed control module, one
speed control module base, one screw and these instructions.
HEARTH PRODUCTS
KITS AND ACCESSORIES
INSTALLATION INSTRUCTIONS FOR BLOWER KIT FBK-300 (CATALOG NO. H7841)
FOR USE WITH SLDVT AND MLDVT LOUVERLESS GAS FIREPLACES
Step 1. Turn off the fireplace and allow it to cool before proceeding.
Step 2. If the appliance is connected to 120 volt power, disconnect
the power.
Step 3. Shut off the gas supply to the fireplace.
Step 4. Open and remove the lower compartment door.
Step 5.
• SLDVT 30”, 35”, 40” and 45” models:
Remove log set and loose media. Remove the sub-floor. Remove the
burner, loosen and remove the screws securing the GTA (Gas Train As-
sembly) to the firebox bottom. Lift the GTA up and away as far as the flex
line will allow. If required, disconnect flex line and completely remove
the GTA. Install the blower against the firebox rear wall and secure by
bending tabs up (see Figure 1 ).
MLDVT 30”, 35”, 40” and 45” models:
Remove log set, grate and loose media. Remove the sub-floor. Remove
the burner, loosen and remove the screws securing the GTA (Gas Train
Assembly) to the firebox bottom. Lift the GTA up and away as far as the
flex line will allow. If required, disconnect flex line and completely remove
the GTA. Install the blower against the firebox rear wall and secure by
bending tabs up (see Figure 1 ).
MLDVTCD 35” model:
Remove any installed floor media and porcelain panels of liners, if appli-
cable. Remove the sub-floor. Remove the burner, loosen and remove the
screws securing the GTA (Gas Train Assembly) to the firebox bottom. Lift
the GTA up and away as far as the flex line will allow. If required, discon-
nect flex line and completely remove the GTA. Install the blower against
the firebox rear wall and secure by bending tabs up (see Figure 1 ).
INSTALLATION INSTRUCTIONS
506019-51
REV. N/C 08/2009
Figure 1
BLOWER MOUNTING TABS
BLOWER JUNCTION
BOX
ELECTRICAL
OUTLET
BLOWER KIT INSTALLATION
VIEW A
FIGURE 2
CONTROL MODULE
CAUTION:
ROUTE BLOWER ELECTRICAL CORDS, SO THAT THEY ARE POSITIONED
WELL AWAY FROM THE ROTATING BLOWER PARTS
SLOTS
Step 6. If electrical power has not been provided to the unit’s junction
box receptacle - Route a 3-wire, 120Vac power line to the unit’s junction
box. Remove the receptacle by removing the two securing screws. Con-
nect the supply wires to the receptacle as shown in Figure 4. Reinstall
the receptacle.
Step 7. Reinstall all removed components in reverse order of Step 5.
Reconnect the gas flex line, if it was disconnected for blower installation.
Check any gas connections that were broken for leakage.
IMPORTANT: Ground lead must be connected to the green screw
located on the junction box. Failure to do so will prevent the ap-
pliance from operating. The appliance must be electrically grounded
in accordance with local codes or, in the absence of local codes, the
National Electrical Code, ANSI/NFPA 70-(latest edition). (In Canada,
the current CSA C22-1 Canadian Electrical Code.)
IHP.us.com 750237M
2
506019-51 Rev. A 03/2015
1508 Elm Hill Pike, Suite 108
Nashville, TN 37210
IHP.us.com
P506019-51
NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.
2
2
Lennox Hearth Products reserves the right to make changes at any time, without notice, in design,
materials, specifications, prices and also to discontinue colors, styles and products.
Consult your local distributor for fireplace code information.
1110 West Taft Avenue • Orange, CA 92865
Printed in U.S.A. © 2009 by Lennox Hearth Products
P/N 506019-51 REV. N/C 08/2009
NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.
Step 8. Insert the control module into the lower opening at the ap-
proximate location shown in Figure 1. The module is self adjusting and
will compress as it is inserted into the compartment. Pull the module
forward to place the front lip of the control module underneath the
front flange of the cabinet bottom panel as shown in Figure 2. Secure
the module in place by snapping it into the slots on the front lip of the
cabinet bottom panel.
Step 9. Plug the blower cord into the module and the module cord into
the top receptacle as shown in Figures 1 and 4.
DIRECT VENT MODELS
Step 11. Reinstall the bottom panel.
Step 12. Restore the electrical power to the unit.
Step 13. Start the fireplace by following the procedure indi-
cated in the lighting instructions section of the Care and Opera-
tion Instructions manual, supplied with the fireplace.
Step 14. Check the start up and shutdown, and the running operation of
the blower. Also check the variable speed feature of the speed control.
The approximate blower start time is 15 minutes from main burner
startup. The approximate blower shut off time is 10 minutes after main
burner shut down.
Figure 4
Step 10. Place the speed control module base in the lower opening of
the firebox (refer to Figure 2 ). Engage the tabs in the slots on the fire-
box bottom floor front lip. Then place the speed control module on the
module base, between the rear ramps. Push the module back, sliding it
up the rear ramp of the base, and secure it in place using the provided
screw in the hole at the front of the base (refer to Figure 3 ).
Figure 2
120 VAC BLACK
NEUTRAL WHITE
GROUND GREEN
SPEED CONTROL MODULE
Plug Blower into Module and
Module into Top Receptacle.
Tab intact
NEUTRAL SIDE
OF RECEPTACLE
If any of the original wire as supplied must be replaced, it must be
replaced with type AWM 105 degree C - 14 gauge wire.
Green ground screw
RECEPTACLE
Red
Black
JUNCTION BOX
HOT SIDE
OF RECEPTACLE
Field Wired
Factory Wired
BLOWER
120V, 60HZ, 1PH BLOWER CONTROL CIRCUIT WIRING
Blower
Control Module
Control Knob
MOUNTING CONTROL MODULE TO CABINET
Firebox Bottom Floor
Cabinet Bottom Panel
Thermal Element Sensing Disk
Touching Bottom of FireBox Floor
Tab In Slot
Figure 3
Speed Control Module In Place
Control Module Base
Screw
Tab
Rear Ramp
/