Posh 1703100 Installation guide

Type
Installation guide

This manual is also suitable for

Posh Solus Shower Niche
Plumbing Socket Set
Wrench
Tools Required
Page 01
Installation Instructions
Tools Required
Main Body x1 Cover Plate x1 Handle x1
A B C D E F
Screw x2 Anchor x2 Allen Key x1
F
Allen Key x1
Main Body x1 Cover Plate x1 Handle x1 Screw x2 Anchor x2 Allen Key x1
A B C D E F
Wrench Plumbing Socket Set
TBA
9
6
5
4
1
8
7
3
2
Number Part
MIZU SILK SHOWER MIXER - 9510746
Quantity Chrome Matte
Black
Brushed
Nickel
Brushed
Gun
Metal
1-3
4
5
6-8
9
Mixer Handle Set Complete 2265003
2265020
2265024
2265016
2265002
2265019
2265023
2265015
2265001
2265018
2265022
2265014
2265000
2265017
2265021
2265013
1
Concealed Wall Mixer Cap
Concealed Wall Mixer Cartridge Sleeve
Concealed Shower Mixer Plate Set
Allen Key 2.5mm
1
1
1
1
x
x
x
x
x
x
xxx
x
x
x
x
x
x
x
x
x
x
x
*
1
2
4
5
The installation of this Toilet Suite shall be in line with the normal minimum requirements in
AS/NZS 3500
Position pan onto pan connector and mark off position of pan fixing holes.
Remove pan and drill holes in position marked.
Apply flexible sealant to base of pan and carefully position pan onto pan connector and screw pan into pre-drilled
holes using corrosion resistant screws (not supplied).
Remove excess sealant.
1.
2.
3.
4.
Posh Solus Concealed S Trap & P Trap Pan
150
375
445
370
270
Ø15
Ø8
1. Position pan onto pan connector and mark off position of pan fixing holes.
2. Remove pan and drill holes in position marked.
3. Apply flexible sealant to base of pan and carefully position pan onto pan connector and screw pan into pre-
drilled
holes using corrosion resistant screws (not supplied).
4. Remove excess sealant.
5. Place suite in position. Mark out the fixing holes
for the cistern.
Important! For timber stud and non-structural walls, the cistern should be fixed to a noggin or solid
wall.
6. If required, modify flush pipe to fit pan and cistern.
Note: The inlet valve can be changed from right to left hand side. Right side position supplied.
7. To install the link piece, flush pipe and seat, refer to the instructions below.
Position pan onto pan connector and mark off position of pan fixing holes.
Remove pan and drill holes in position marked.
Apply flexible sealant to base of pan and carefully position pan onto pan connector and screw pan into pre-drilled
holes using corrosion resistant screws (not supplied).
Remove excess sealant.
Place suite in position. Mark out the fixing holes for the cistern.
If required, modify flush pipe to fit pan and cistern.
Note: The inlet valve can be changed from right to left hand side. Right side position supplied.
To install the link piece, flush pipe and seat, refer to the instructions below.
For timber stud and non-structural walls, the cistern should be fixed to a noggin or solid
wall.
1.1.
3.
4.
5.
7.
2.
6.
For timber stud and non-structural walls, the cistern should be fixed to a noggin or solid
wall.
Prior To Installation
ŸPlease read these installation instructions carefully before proceeding and must be installed by a qualified
tradesperson.
ŸIncorrect installation and failure to follow instructions will void the warranty.
ŸIt is the installer's responsibility to check the niche for defects prior to installation. No claims will be
accepted after installation.
ŸIt is the installer's responsibility to ensure that the niche is installed in compliance with local and national
building codes.
ŸIt is the installers responsibility to ensure a water tight seal between the niche and surrounding structure.
Your niche is structural and waterproof however you will need to ensure the join from the lip of the niche to your
plaster board is totally waterproof in accordance with local building codes.
Please follow the recommended waterproofing instructions provided by waterproof manufacturers.
Waterproofing
The installation of this Toilet Suite shall be in line with the normal minimum requirements in
AS/NZS 3500
1.1.
Your Niche is structural and waterproof, however you will need to ensure the join from the lip of the
Niche to your plaster board is completely in accordance with local building codes.
Please follow the recommended waterproofing instruction provided by waterproof manufacturers.
Posh - Solus Shower Niche of 02
Posh - Solus Shower Niche of 02
Installation
You are required to have supporting studs on both sides of the niche. A supporting noggin joined to your studs will
need to be installed under the base of your niche to give additional support. Using the locator holes screw niche
directly into studs ensuring it is level.
Once fastened to your frames with required support lay your plaster board around the niche to each lip.
In accordance with local building codes apply waterproof to the niche as required.
Install tiles or other decorative materials like quality Polymer panels.
1. You are required to have supporting studs on both sides of the
niche. A supporting noggin joined to your studs will need to be
installed under the base of your niche to give additional support.
Using the locator holes screw niche directly into studs ensuring it
is level.
You are required to have supporting studs on both sides of the niche. A supporting noggin joined to your studs will
need to be installed under the base of your niche to give additional support. Using the locator holes screw niche
directly into studs ensuring it is level.
Once fastened to your frames with required support lay your plaster board around the niche to each lip.
In accordance with local building codes apply waterproof to the niche as required.
Install tiles or other decorative materials like quality Polymer panels.
Once fastened to your frames with required support lay your plaster board around the niche to each lip.
In accordance with local building codes, apply waterproof to the niche as required.
Install tiles or other decorative materials like quality Polymer panels.
2. Once fastened to your frames with required support lay your
plaster board around the niche to each lip.
In accordance with local building codes, apply waterproof to the
niche as required.
Install tiles or other decorative materials like quality
Polymer panels.
3. Install tiles or other decorative materials like quality
Polymer panels.
Plumbers, please ensure a copy of the installation
instruction is left with the end user for future reference.
Published 04/08/2023 Page 02
  • Page 1 1
  • Page 2 2

Posh 1703100 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI