TECHNICAL MAINTENANCE
The unit requires maintenance works 3-4 times per year. Maintenance includes regular cleaning and
the following operations:
1. Filter maintenance (3-4 timed per year).
Dirty lters increase air resistance in the system and reduce supply air volume. Clean the lters as
required but at least once in 3-4 months. Use a vacuum-cleaner to remove the contamination or use a
new lter. Contact your seller for new lters.
Filter removal procedure (Fig. 18):
1. Pull the latch plates.
2. Turn the latch plates by 90°.
3. Open the unit access door.
4. Replace the extract and supply lter.
2. Heat exchanger inspection (once per year).
Some dust can get accumulated on the heat exchanger block even in case of regular maintenance
of the lters. To maintain the high heat exchange e ciency, regular cleaning is required. To clean the
heat exchanger pull it out of the unit and ush it with warm soap or mild detergent water solution. Re-
install the dry heat exchanger to the unit.
3. Fan inspection (once per year).
Even in case of regular lter maintenance, some dust and grease can get accumulated inside the
fans and reduce the unit performance and supply air ow.
Clean the fans with a soft brush or cloth. No water and abrasive detergent, sharp objects or solvents
are allowed for cleaning to prevent the impeller damage.
4. Condensate drainage (once per year).
The drain pipes may get clogged with extracted particles. Pour some water inside the drain pan and
check the pipe for clogging. Clean the U-trap and drain pipe if required.
5. Supply air ow control (twice per year).
Leaves and other pollutions can clog the supply air grille and reduce the unit performance and
supply air volume. Check the supply grille twice per year and clean it as required.
6. Ductworks inspection (once in 5 years).
Even regular technical maintenance of the unit may not completely prevent dirt accumulation in
the air ducts, which impairs the unit performance. The air duct maintenance mens their regular cleaning
or replacement.
7. Control Unit Maintenance (as required).
The control unit must be serviced by an expert quali ed for unassisted operations with
electrical installations up to 1000 V and made familiar with the present operation manual.
Disconnect the unit from the power mains prior to the control unit maintenance.
Control unit maintenance sequence(Fig. 18):
1. Pull the latch plates.
2. Turn the latch plates by 90°.
3. Open the unit access door and release the stoppers by removing two M4 screws. Then take o it
from the door pro le.
4. Remove the lters from the unit.
5. Remove the heat exchanger by pulling its band.
6. Remove the screws and take o the protecting cover.
7. Remove the fastening screws of the swivel control unit securing the swivel control unit panel.
Remove the control unit lid for accessing the control unit.