Dragonfly DF-SL-160-UAW, DF-SL-100-UAW, DF-SL-106-UAW, DF-SL-110-UAW, DF-SL-120-UAW, DF-SL-133-UAW, DF-SL-145-UAW, DF-SL-92-UAW Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Dragonfly DF-SL-160-UAW Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
© 2016 Dragonfly
Dragonfly™ Fixed Projection Screen Material
Installation Guide
1. Assemble the screen frame according to the instructions in the screen manual, then lay it face down on a
clean, flat surface.
2. Wash your hands and clean the work area to avoid staining the
screen material.
3. Unpack the screen material and tension rods.
4. Unroll the screen material and lay it flat, with the seam side up,
across the back of the screen frame.
5. Push the shorter tension rods through the edges of the screen
material, making sure not to damage the material. Do not insert
the longer rods yet.
6. Attach snaps 1-4 in order.
7. Insert the longer tension rods.
8. Attach snaps 5-8 in order.
9. Working from the outside towards the center:
a. Attach the remaining snaps on the short sides, 9 and 10 last.
b. Attach the remaining snaps on the long sides, 11 and 12 last.
Tension Rod
11
12
9 10
7
3
4
85
1
2
6
Installation Tip
Take your time and avoid breaking lugs. If you
can’t get the screen attached, stop and let the
material stretch for a few minutes, then continue.
160926-1330
/