Intermetro LEC9800 Installation guide

Type
Installation guide
Part No. INST-LEC9800
11/03
PART No. LEC9800
Assembly consists of (1) SHARPS Container Mounting Bracket, (2) Velcro Straps with
D Ring
1. For carts equipped with an Overbridge: Assemble the universal mounting bracket to the
overbridge with the instructions provided. Mount the Utility Pole to the bracket as shown in
Fig. 1.
2. For carts equipped with an I.V. Pole: Install the I.V. Pole with the instructions provided
3. For all units: Slide the bottom loop of the Sharps Container Bracket Loops over the flattened
area on the Utility or I.V. Pole, and then slide the bracket down as shown in Fig. 2. Do the same
with the top loop. (Bracket will rest on the universal mounting bracket for units with
overbridge (Fig. 3), or on the I.V. Pole adjustment knob for units with I.V. Pole Assembly (Fig.
4).
4. Install the (2) Velcro Straps to the Sharps Container Bracket as shown in Figs. 3 & 4. Install the
Sharps Container and adjust the Velcro straps as required.
Adjustable Sharps Container Bracket
INSTALLATION
INSTRUCTIONS
Fig. 1
Fig. 2
Fig. 3
Fig. 4
I.V.
Pole
Utility Pole
Overbrid
g
e
Universal
Mounting
Bracket
Velcro
Straps
  • Page 1 1

Intermetro LEC9800 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI