Nucraft Flow™ Operating instructions

  • Hello! I've reviewed the installation instructions for the Stone Top Flow Stone NT NT. This document outlines the step-by-step process for assembling the stone top, including base setup, securing the metal frame, and placing the sub and stone tops. I'm ready to answer any questions you have about the assembly process.
  • What is the required number of persons to assemble this product?
    Who should install the stone top?
    Is the sub top secured to the metal frame?
Flow Stone NT Installation Instructions
ID:
Before Beginning Installation
Read through the entire instruction thoroughly
A minimum of 2 persons is required for this assembly
These instructions reflect typical assemblies. They may not match your specific configuration.
IMPORTANT Installation of stone must be done by a qualified stone fabricator/installer or Nucraft will
not be responsible for any damage to the product. Nucraft assumes no responsibility or liability for the
architectural or structural conditions present at the site of installation, or the building’s ability to
support the weight of this product.
Required Tools
Socket Wrench
Base Types
All base types are assembled the same way, as described in this instruction.
Column Rectangle Hoop
Step 1: Bases
Set bases in desired position. Facing them toward each other.
Step 2: Metal Frame
Place the metal frame on top of the bases.
Align with the base brackets.
Secure the metal frame to the base brackets with the provided hardware.
Step 3: Sub Top
Place the sub top onto the metal frame.
The sub top does not get secured to the metal frame, but instead sits in place.
Step 4: Stone Top
Lastly, place the stone top onto the sub top.
Align edges to be centered.
/