miniPV®-HX

Cannon miniPV®-HX, miniPV-H 1 Bath 115V 50/60 HZ, miniPV-HX 1 Bath 115V 50/60 HZ, miniPV®-H Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Cannon miniPV®-HX Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
THANK YOU for your purchase of the miniPV-X automatic viscometer from CANNON Instrument
Company. This guide is designed to provide information about the installation of the miniPV-X.
This is designed to be used along with the miniPV-X Instruction & Operation Manual.
1. Unpack the miniPV-HX viscometer
CAUTION
Remove all components from the shipping container(s).
Do NOT lift the miniPV instrument by the modular side panels (“ears”).
Always support the weight of the unit from the BASE.
Remove all packing materials from the components.
Verify reception of shipped materials by comparing equipment items
with packing/parts lists. Report missing items to Cannon Instrument
Company immediately.
Inspect each component for signs of damage. Report damages to the
shipper and Cannon Instrument Company immediately.
Retain all packing materials until the instrument is connected and
functioning properly.
If any component(s) must be returned to Cannon Instrument Company,
the damaged item(s) should be packaged in the original shipping
container. Refer to the final page of this guide for instructions on
returning defective equipment. Customers outside the United States
should contact the local Cannon dealer for procedures on returning
products to Cannon.
Review operator safety information in the miniPV-X Instruction &
Operation Manual
Verify electrical specifications for MAINS power in the miniPV-X
Instruction & Operation Manual.
- 4 -
CANNON® miniPV-HX Installation Guide
2139 High Tech Road
State College, PA, 16803 | USA
800-676-6232 | 814-353-8000
- 1 -
miniPV-HX viscometer Installation Guide
2139 High Tech Drive
State College, PA 16803 | USA
814-353-8000 | 800-676-6232
service@cannoninstrument.com
cannoninstrument.com
CANNON® miniPV-HX Installation Guide
2139 High Tech Road
State College, PA, 16803 | USA
800-676-6232 | 814-353-8000
T
B
B
A
B
Power Supply
Waste Receiver
A
2.
Connect tubing and cables as indicated in the image. Cut tubing
to length as necessary.
Tubing Detail
A = 6 mm transparent tubing
B = 1/8” transparent tubing
3. Fill bath vessel to the fill line with silicone fluid.
4. Install VISCPRO Software on the controlling PC using
the installation CD or thumb drive.
miniPV-HX
Waste Vessel
Power Supply
Solvent
Vessel
Above: Filling the miniPV
bath vessel with bath fluid
using the provided glass
funnel.
5.
Supply power to the miniPV instrume
nt.
6. Load VISCPRO software.
7. Set the desired control
temperature.
8. Calibrate the instrument per
manual instructions or confirm
calibration data included with your
installation CD.
9. Enter sample ID information into
VISCPRO and begin running
samples.
- 2 -
miniPV-HX Installation Guide
|
Cannon Instrument Company®
|
2139 High Tech Rd
|
State College, PA
|
16803
|
USA
|
814-353-8007
|
fax 814-353-8007
|
cannoninstrument.com
- 3 -
/