Asus EEE PC 900 Installation guide

Category
Interface hubs
Type
Installation guide

The Asus EEE PC 900 is a compact and versatile device that combines portability with impressive functionality. With its slim profile and lightweight design, it's perfect for users on the go. Enjoy seamless multitasking and smooth performance with its efficient processor, enabling you to breeze through daily tasks, browse the web, or work on documents with ease.

The Asus EEE PC 900 is a compact and versatile device that combines portability with impressive functionality. With its slim profile and lightweight design, it's perfect for users on the go. Enjoy seamless multitasking and smooth performance with its efficient processor, enabling you to breeze through daily tasks, browse the web, or work on documents with ease.

TouchKit Setup
Reminder:
Be extremely careful when putting back on
the LCD housing; make sure the screws are
NOT tightened all the way down. Discontinue action
immediately as soon as force is felt on the housing.
Further tightening of the screws will cause touch
screen to crack resulting in inaccurate cursor.
Package Content
Controller Board Preparation
Apply rubber adhesive on the bottom side of the controller board as
insulation.
Eee PC 900 Installation Guide
Step 1.
Remove all 6 screws for LCD housing.
Step 2.
Remove all 6 screws for bottom
housing.
Step 3.
Remove keyboard by pushing in the 3
springs.
Step 4.
Remove both FPC for keyboard and
touchpad in the direction indicated.
Step 5.
Remove all 9 screws for keyboard
housing.
Step 6.
1. Use thin double-sided tape to secure the
touch screen panel on the metal frame
of the LCD module.
2. Remove both screws to detach LCD
module from the housing.
Step 7.
Detach the old connector to the
camera module and replace it Camera
Harness provided by the TouchKit.
Step 8.
Remove both screws on each side of
the LCD module to detach the LCD
brackets. This is to lower the LCD
module to accommodate the thickness
of the touch screen panel.
Remember to replace the LCD brackets
back to its’ original position in step 6.
Step 9. Touch Screen Alignment
Horizontal alignment (direction 1) use
the screw hole as reference point.
Vertical alignment (direction 2)
approximately 1.5mm~2.0mm from the
bottom edge of the metal frame.
Step 10.
Place Shock Absorber Rubber on the
metal frame surrounding the touch
screen panel.
Step 11.
Remove camera connector.
Step 12.
1. Connector placement for touch screen
panel.
2. Camera port on the motherboard to USB
input on the controller (Hub Harness)
3. USB output to camera module (Camera
Harness)
4. USB output (optional expansion)
5. USB output (optional expansion)
Be extremely careful when putting back on the LCD housing; make sure the screws are NOT tightened all
the way down. Discontinue action immediately as soon as force is felt on the housing. Further tightening
of the screws will cause touch screen to crack resulting in inaccurate cursor.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6

Asus EEE PC 900 Installation guide

Category
Interface hubs
Type
Installation guide

The Asus EEE PC 900 is a compact and versatile device that combines portability with impressive functionality. With its slim profile and lightweight design, it's perfect for users on the go. Enjoy seamless multitasking and smooth performance with its efficient processor, enabling you to breeze through daily tasks, browse the web, or work on documents with ease.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI