Legrand Power Packs, PWP2120 & PWP2277 Installation guide

Type
Installation guide
CAUTION
TURN THE POWER OFF AT THE CIRCUIT BREAKER BEFORE
INSTALLING POWER/SLAVE PACKS!
ONLY QUALIFIED ELECTRICIANS SHOULD ATTEMPT TO INSTALL
PASS & SEYMOUR POWER/SLAVE PACKS!
Installation Instructions
The power pack is attached to existing junction boxes. All low voltage wiring should
be at least 22 gauge wire. All high voltage connections should be at least 14 gauge.
Always check local building codes. After initial wiring is complete, check to verify power
pack is wired correctly. Improper wiring can cause damage to power pack, lighting system,
and occupancy sensor.
Technical Support:
(800) 223-4185 340789 Rev. B07938
Control Output 24VDC
Common
+24VDC
White (Neutral)
Red (Load)
Red (Line)
White
Black
Hot
N
POWER PACK
SLAVE
PACK
Red (load)Red (line)
OFF switch
Black
Blue
Red
Black
Blue
Switch
Hot
N
Lighting
Load
Lighting
Load
Any 24VDC Sensor
Ceiling or Wall Mount
Power Pack
High Voltage
connection made
inside J-Box
Two phase
circuit lighting
with two loads
PWP2120, PWP2277
Power Packs
  • Page 1 1